myakka river protection zone ordinance and comprehensive
play

Myakka River Protection Zone Ordinance and Comprehensive Plan - PowerPoint PPT Presentation

Myakka River Protection Zone Ordinance and Comprehensive Plan Update MRMCC Presentation Jan 9, 2009 Elizabeth Wong, PE Stormwater Manager, Planning Zoning and Engineering Dept. 941-429-7090 ewong@cityofnorthport.com Safe Clean Pretty Fun


  1. Myakka River Protection Zone Ordinance and Comprehensive Plan Update MRMCC Presentation Jan 9, 2009 Elizabeth Wong, PE Stormwater Manager, Planning Zoning and Engineering Dept. 941-429-7090 ewong@cityofnorthport.com Safe Clean Pretty Fun

  2. MYAKKA RIVER PROTECTION ZONES DIAGRAM Myakka River MYAKKA RIVER Myakka River Myakka River AREA Wetland Area Buffer Area Buffer Zone 1 (35’ min. MRPZ Fire Protection Clear Zone) Zone 4 50’ WIDE MYAKKA RIVER AREA BUFFER Zone 2 (House, other 150’ SETBACK Zone 3 structures, and street yard) AREA Conservation Area Zone 3 (Conservation Area) 220’ WIDE MYAKKA Zone 1 35’ min Zone 4 (50’ Myakka RIVER PROTECTION House and other River Area Buffer) 35’ ZONE structures min. 35’ min. Zone 2 30’ SETBACK (Chapter 53 City Code) Property Line Road Ordinance 2008-36 Chap 57 MRPZ adopted 10/14/08 Note: This diagram is not to scale.

  3. Prohibitions in Myakka River Protection Zone (MRPZ) � No development in Zone 4 Myakka River Buffer 50’ wide strip. � No earth moving � No septic systems, need alternative waste systems landward of Primary Structure. � Cannot remove native vegetation (see exemptions) or install turf grass � No Tree Removal without permit � 30’ Min. Wetland Buffer for wetlands in MRPZ � 50’ Min. Wetland Buffer for Mesic Hammock wetlands in MRPZ Safe Clean Pretty Fun

  4. Exceptions to Prohibitions in MRPZ � Can remove invasive plant or poison ivy, nettles and sandspurs. � Zone 1 and 2 (House and fire protection zone)– Can remove native vegetation with permit � Zone 3 & 4 (Conservation Area and Myakka River Area Buffer)– Can remove vegetation with City approval for � Nature trails (4’ max width) � Dock access � Selective pruning to enhance view � Exemptions for Agricultural or Silvicultural activities Safe Clean Pretty Fun

  5. EAR Comprehensive Plan Amendment � EAR Comp Plan Amendment submitted to DCA late December, DCA has 45 days to review. � Stormwater Element update � Isles of Athena (IOA) Comp Plan Amendment � New Activity 6 � More Info: � www.cityofnorthport.com/PZE_Long_Range_ Comp Safe Clean Pretty Fun

  6. Safe Clean Pretty Fun 100-year Storm 5-day Duration Big Slough Watershed Floodplain Model

  7. North East Quadrant Plan North East Quadrant Plan

  8. Isles of Athena (5771 Acres) � Comp plan amendment submitted to DCA 12/08 � New interchange at I-75 � 13,000 dwelling units of varying types � Preservation of 2000 acres of environmentally sensitive land � A mixed use town center with: � 3 million sf of commercial/retail � 1.2 million sf of office space Safe Clean Pretty Fun

  9. Activity Center 6– Before & After Activity Center 6– Before & After R KS HIRE S O T Y N G G ¨ ¦ § I75 ¨ ¦ § I75 E PR T IC S E E HIR B L KS V D OR Y ST S E R I H S K R O N Y R D S I R R E S Safe Clean Pretty Fun

  10. Activity Center 6 � Limited commercial, light Industrial, office, medium and high residential � Fire station and other government facilities � Added an interchange � Interconnectivity. � Projected housing balanced with projected jobs. � 10% cap on development while the Master Plan is in development Safe Clean Pretty Fun

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend