Los Alamitos High School MULTISTORY STEM BUILDING August 2019 DSA MILESTONES Submission Current Project Status Construction of Phase I in Progress DSA Approval Construction Documents in Review with the Division of the State Architect


slide-1
SLIDE 1

MULTISTORY STEM BUILDING

Los Alamitos High School

2019 August

slide-2
SLIDE 2

MILESTONES

2

Construction of Phase I in Progress Construction Documents in Review with the Division of the State Architect Constructability Review Analysis in Progress DSA Submission DSA Approval Phase I Construction Phase II Construction

Current Project Status

slide-3
SLIDE 3

PHASE I

Contractor Mobilization Canopy Demolition Parking Lot Reconfiguration Baseball Scoreboard Interim Housing

3

Scope of Work

slide-4
SLIDE 4

PHASE I

Construction Schedule

4

JUL SEP AUG OCT NOV DEC Contractor Mobilization Canopy Demolition Interim Housing Contractor Mobilization Parking Lot Reconfiguration Baseball Scoreboard Staff Relocation TBD

slide-5
SLIDE 5

DSA REVIEW AND APPROVAL

Review Process

▪ June 10, 2019 - Construction Documents Submitted ▪ September 15, 2019 - Initial Review Comments Anticipated ▪ November 1, 2019 - Response to Comments Anticipated ▪ December 1, 2019 - Approval of Construction Documents Anticipated ▪ January 2020 - Determine and Negotiate Guaranteed Maximum Price 5

Review and Approval Milestones

▪ Pre-Application Meeting ▪ Primary Areas Reviewed Fire, Life, Safety Structural Access Compliance

slide-6
SLIDE 6

CONSTRUCTABILITY

Focused Areas

6 Site Verification Manufacturer Details and Input Product Quality and Installation Quality Assurance Measures Value Engineering Project Logistics Design Discipline Congruity Design Feasibility and Corrections A technique to review construction processes from start to finish during pre-construction phase. It is used to identify

  • bstacles before a project is built to reduce or prevent errors,

delays, and cost overruns.

slide-7
SLIDE 7

CONSTRUCTABILITY

Review Categories

7 Building Substructure ▪ Soils Remediation, Footings, Foundations Vertical Building Shell ▪ Exterior and Interior Walls, Metal Panels, Brick Veneer, Windows Plumbing and Fire Protection ▪Fixtures, Piping Electrical ▪Fixtures, Conduit, Outlets HVAC ▪ Equipment, Registers, Ducting Data and Audio/Visual ▪Equipment, Data Drops, Projectors, Displays Horizontal Building Shell ▪ Floor Slabs, Roof Structure, Soffits Building Utility Connections ▪ Plumbing, Storm Drain, Electrical, Data

slide-8
SLIDE 8

8

CTE ROBOTICS LAB

  • HAAS Mini Mill
  • Metal Laser Cutter
  • CNC Router
  • 3D Printer
  • CNC Mill
  • 80 Gallon Compressor
  • 10 AMP 50’ Cord Reel
  • 8’ Workbench

Equipment

slide-9
SLIDE 9

9

CTE COMPUTER LAB

slide-10
SLIDE 10

10

UPDATED STEM CLASSROOM LAYOUT

  • Relocated from peninsulas to islands in

the center of the classroom

  • (8) Total Lab Spaces
  • Teaching Island

Lab Station Locations

slide-11
SLIDE 11

Questions and Comments

Alexander Martensson