MTA Status & Schedule Ya gmur Torun Illinois Institute of Technology/Fermilab MTA RF Meeting Nov 18, 2013 Fermilab Ya gmur Torun MTA RF Mtg 11/18/13 News P . Lane comprehensive exam (Nov 12) Ya gmur Torun MTA RF


slide-1
SLIDE 1

MTA Status & Schedule

Ya˘ gmur Torun

Illinois Institute of Technology/Fermilab

MTA RF Meeting – Nov 18, 2013 – Fermilab

Ya˘ gmur Torun MTA RF Mtg – 11/18/13

slide-2
SLIDE 2

News

P . Lane comprehensive exam (Nov 12)

Ya˘ gmur Torun MTA RF Mtg – 11/18/13

slide-3
SLIDE 3

Action items (last week)

Infrastructure

Debug solenoid power supply control Finalize crane installation plan

All-season cavity

Complete E(B) run Remove cavity

DL-HPRF cavity

Finalize design for cavity inserts and coupler

Modular cavity

+ Draft commissioning/run schedule Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation

Button-pillbox cavity

Re-assemble with gridded windows Leak check, calibrate

Ya˘ gmur Torun MTA RF Mtg – 11/18/13

slide-4
SLIDE 4

Action items (last week)

201-MHz single-cavity module

Clean clean room & parts Fabricate struts Fabricate cavity mockup Finish alignment analysis Review vacuum system Review water system Instrumentation/interface design/assembly

top-hat acoustic sensors infrared sensors Faraday cup + electron pickups + directional coupler calibration

Ya˘ gmur Torun MTA RF Mtg – 11/18/13

slide-5
SLIDE 5

Action items (this/next week)

Infrastructure

Debug solenoid power supply control Finalize crane installation plan

All-season cavity

Revive data analysis mtg Complete E(B) run Remove cavity

DL-HPRF cavity

Finalize design for cavity inserts and coupler

Modular cavity

Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation

Button-pillbox cavity

Re-assemble with gridded windows Leak check, calibrate

Ya˘ gmur Torun MTA RF Mtg – 11/18/13

slide-6
SLIDE 6

Action items (this/next week)

201-MHz single-cavity module

Draft commissioning/run schedule Remove old cavity from platform Clean clean room & parts Fabricate cavity mockup Install cavity mockup in vessel Finish alignment analysis Finalize vacuum system specification Finalize water system specification Instrumentation/interface design/assembly

top-hat infrared sensors coupler light

Hall access

tomorrow: inspection for crane installation Early next week (TBC)

201-MHz cavity removal? all-season cavity removal? services (air, water, cabling)?

Ya˘ gmur Torun MTA RF Mtg – 11/18/13