mta status schedule
play

MTA Status & Schedule Ya gmur Torun Illinois Institute of - PowerPoint PPT Presentation

MTA Status & Schedule Ya gmur Torun Illinois Institute of Technology/Fermilab MTA RF Meeting Nov 18, 2013 Fermilab Ya gmur Torun MTA RF Mtg 11/18/13 News P . Lane comprehensive exam (Nov 12) Ya gmur Torun MTA RF


  1. MTA Status & Schedule Ya˘ gmur Torun Illinois Institute of Technology/Fermilab MTA RF Meeting – Nov 18, 2013 – Fermilab Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  2. News � P . Lane comprehensive exam (Nov 12) Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  3. Action items (last week) Infrastructure Debug solenoid power supply control Finalize crane installation plan All-season cavity Complete E(B) run Remove cavity DL-HPRF cavity Finalize design for cavity inserts and coupler Modular cavity + Draft commissioning/run schedule Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation Button-pillbox cavity Re-assemble with gridded windows Leak check, calibrate Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  4. Action items (last week) 201-MHz single-cavity module Clean clean room & parts � Fabricate struts Fabricate cavity mockup Finish alignment analysis � Review vacuum system � Review water system Instrumentation/interface design/assembly top-hat � acoustic sensors infrared sensors � Faraday cup + electron pickups + directional coupler calibration Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  5. Action items (this/next week) Infrastructure Debug solenoid power supply control Finalize crane installation plan All-season cavity Revive data analysis mtg Complete E(B) run Remove cavity DL-HPRF cavity Finalize design for cavity inserts and coupler Modular cavity Order missing parts for instrumentation Design clean room inspection cart and stage adapters Update quench force calculation Button-pillbox cavity Re-assemble with gridded windows Leak check, calibrate Ya˘ gmur Torun MTA RF Mtg – 11/18/13

  6. Action items (this/next week) 201-MHz single-cavity module Draft commissioning/run schedule Remove old cavity from platform Clean clean room & parts Fabricate cavity mockup Install cavity mockup in vessel Finish alignment analysis Finalize vacuum system specification Finalize water system specification Instrumentation/interface design/assembly top-hat infrared sensors coupler light Hall access tomorrow: inspection for crane installation Early next week (TBC) 201-MHz cavity removal? all-season cavity removal? services (air, water, cabling)? Ya˘ gmur Torun MTA RF Mtg – 11/18/13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.