More Connectivity Status Quo: Congestion Riders are abandoning mass transit, due to the experience. Those who can a f ord are moving to the road, causing congestion. We need a better value solution. More people onto transit /


slide-1
SLIDE 1

More Connectivity

slide-2
SLIDE 2

Status Quo: 
 Congestion

  • Riders are abandoning mass

transit, due to the experience.

  • Those who can aford are moving

to the road, causing congestion.

  • We need a better value solution.
  • More people onto transit / 


Less burden on roads and environment.

2
slide-3
SLIDE 3 3

A New Proposition: 
 Glydways

The best mobility solution for your money

  • Moves more people at a lower

cost

  • Increase ridership with better

experience

  • Incrementally fundable
slide-4
SLIDE 4

The Glydways System

The Line

Dedicated & Safe

Boarding Zones

Accessible · Convenient

Garages

Strategic · Economical

Glydcars

Orchestrated · Electric

Other Modes

Mass Transit · Micro Mobility

People

Diverse · Commuters

Orchestrated + Autonomous

4
slide-5
SLIDE 5 5

Dynamic Personal Mass Transit

  • Highway in a bike lane

(10,000ppl/hr)

  • 10x value for infrastructure
  • Scalable economics
  • Repurpose any running

surface (or build new)

slide-6
SLIDE 6

Better than Driving

  • Personal journey for everyone
  • On-Demand (Seconds, not minutes)
  • Non-stop, no transfers
  • Unprecedented level safety

and security

  • Universally accessible (ADA)
6
slide-7
SLIDE 7

Lowest Impact, Highest Benefit

  • Repurpose ANY running surface
  • Modular and Transportable
  • Flexible & Removable
  • Smaller corridor constraints
  • Build faster!
7
slide-8
SLIDE 8

Scalable Economics

To build $20M per mile

(10kppl/hr capable infrastructure)

To run per pass per mile

$0.25

CapEx = Greenfield (Elevated, 2 lanes per direction, boarding zone every 1/4mile, garage and a fleet for 1000ppl/hr) OpEx = 24 hours a day, solar power leveraging, excluding asset depreciation

slide-9
SLIDE 9

Built for Growth

  • Buy only what

you need for today.

  • Upgradeability

for tomorrow.

9
slide-10
SLIDE 10

Built for Sustainability

  • Less concrete =

Less CO2

  • Recycled steel
  • Leverage system

installed Solar

  • Grid power load

shifting

10

163 7 ,950

CO2 emissions per mile

(Metric Tons)

slide-11
SLIDE 11

A Shared Vision

  • f Connectivity!

150 miles $5B of CapEx Each System is a Net Gain growth

  • f Permanent

Jobs

11

BART Glydways-Public Glydways-Private

slide-12
SLIDE 12

Fully State Certified and Ready to Fund for Deployment

2021

(current development schedule)

slide-13
SLIDE 13

Let’s Work Together

Zach Zelif
 Chief Business Development Ofcer
 zach@glydways.com 925.357 .5578 Eliot Temple
 Director of Engagement
 eliot@glydways.com
 415.717 .0090 Paul Jamtgaard
 Infrastructure Planning and Urban Solutions paul@glydways.com Lynn Tao
 Head of Commercial Operations lynn@glydways.com 415.913.9786

13