Modern Manufacturing and Development Center of Apator SA 20th June 2010 Decisions concerning the sales of current property +1197% Integration of plots +10% +21% +14% +31% -94% -53% Schedule for the performance of investment 27th May


  1. Modern Manufacturing and Development Center of Apator SA 20th June 2010

  2. Decisions concerning the sales of current property +1197% Integration of plots +10% +21% +14% +31% -94% -53%

  3. Schedule for the performance of investment � 27th May 2008 : Adoption of the resolution by the Supervisory Board of Apator SA of the consent to sell perpetual usufruct of land at ś ółkiewskiego in Toru ń , buildings and constructions being separate property � 23rd June 2008 : Adoption of the resolution by General Shareholders Meeting of Apator SA of the sales of perpetual usufruct of land at ś ółkiewskiego in Toru ń , building and constructions being the separate property. � half of 2009 : After the owner of Galeria Copernicus in Toru ń was changed the negotiations started again on the sales of property of, +1197% Apator SA in Toru ń . � 28th December 2010 : Getting permission to run business in the area of Pomeranian Special Economic Zone. � 9th March 2011: Purchase of property from Pomeranian Special Economic Zone in Ostaszewo. +10% � 18th April 2011: +21% Conclusion of preliminary selling contract of property at. ś ółkiewskiego in Toru ń , with Galeria Copernicus Toru ń 2 Sp. z o.o. with headquarters in Warsaw. � 25th May 2011: +14% Signature of the contract with the main Contractor of Modern Manufacturing and Development Center +31% -94% -53% � March 2012 Planned completion of the investment and getting the permission to use the building. � April- May 2012 Planned move the company to a new location. � At the latest till the 31st July 2012 The term of conclusion of the final selling contract of the property at ś ółkiewskiego in Toru ń .

  4. Pomeranian Special Economic Zone Location of a new company on the territory of the Pomeranian Special Economic Zone The area of the Pomeranian Special Economic Zone is spread over the territory of three provinces and it covers: � 447,03 ha in Pomerania Province, � 170 ha in Western Pomerania Province, � 603,08 ha in Kujawy and Pomerania Province +1197% Pomeranian Special Economic Zone is located in the area of Kujawy and Pomerania Province in Łysomice, Kowalewo Pomorskie, Barcin, Ś wiecie, Grudzi ą dz, Bydgoszcz and Rypin. +10% Firms located in the area of Pomeranian Special Economic Zone: +21% � Sharp Manufacturing Poland Sp. z o.o., � Orion Electric (Poland) Sp. z o.o., � +14% Poland Tokai Okaya Manufacturing Sp. z o.o., � Sohbi Craft Poland Sp. z o.o., � U-Tec Poland Sp. z o.o., +31% � Kimoto Poland Sp. z o.o., -94% -53% � YUSSEN (NYK) Logistics (Poland) Sp. z o.o., � Tensho Poland Sp. z o.o., � Sumika Electronic Materials Poland Sp. z o.o., � Nissin Logistics Poland Sp. z o.o., � Nippon Express (Germany) Sp. z o.o.,

  5. Location of the new company Pomeranian Special Economic Zone Plot I/36 – region of Ostaszewo, Łysomice commune

  6. New investment in figures � Plot area of Apator in Pomeranian Special Economic Zone - 5.1429 ha. � Total area of the new building - 16.000 m 2 , including manufacturing area – about 12.000 m 2 . � Expected reserve for a new investment – about 5.700 m 2 . � Expected the increase of employment in new location – minimum 100 persons, mainly in manufacturing area. � Expected total employment in new location – maximum 600 persons. � Cost of investment – about 30,5 m PLN obtained from the sale of land at at ś ółkiewski Street in Toru ń .

  7. New investment – main advantages � Optimization and automation of manufacturing processes � Modernization of manufacturing technology of electricity meters and switchgear � Shortening of flow of materials and parts between the following technological operations. � Optimal adjustment of manufacturing and storage areas to the manufacturing capacity and the technology applied � Centralization of the manufacturing of electronic electricity meters in Meters Center of Grupa Apator. � Centralization of plastic processing including the implementation of innovative central drying system and distribution of plastics. � Tax relief according to the regulations of the act on special economic zones

  8. Location of the manufacturing area in the new company Plastic Administration building Warehouse Manufacturing of metering equipment processing Facility for utility laboratory Electrical Manufacturing of surge arresters services Manufacturing of switchgear Server room

  9. Projects concerning protection of environment Implementation of modern, efficient technologies that limit: � electricity consumption, � emission to air, � volume of vaste and industrial waste waters Planned investments: � boiler room supplied by natural gas, � heat recuperative systems, � solar collectors, � recycling and recovery of wastes, � recovery of rain water

  10. Administration building

  11. New manufacturing company

  12. Thank you for your attention Segmenty rynku

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.