Mechanical aspects of the full-scale HV test at PC4 1 month after - - PowerPoint PPT Presentation
Mechanical aspects of the full-scale HV test at PC4 1 month after - - PowerPoint PPT Presentation
Mechanical aspects of the full-scale HV test at PC4 1 month after review Jeff Nelson, William & Mary HV test weekly meeting 8/18/16 Current Schedule - 7/29/16 (if approved) 4 weeks - 10/27/2016 Freeze design and release
Current Schedule
7/28/16 HV test mechanical 2
- 7/29/16 (if approved)
- Freeze design and release
drawings to shops
- Procure stock & fabricate
- 7 weeks for part production
- By 9/15/2016
- Deliver parts to William & Mary
- 10/13/2016
- Clean and Preassemble parts
- 4 weeks
- 10/27/2016
- Parts delivered to Fermilab
- 2 weeks for clean & crate & drive
- 10/28/2016
- Start installation
- 11/10/2016
- Installation complete
- 2 weeks for assembly
Shipping information for W&M
7/28/16 HV test mechanical 3
- For US mail
Jeff Nelson P.O. Box 8795, Physics College of William & Mary Williamsburg, VA 23187
- For shipping
William Henninger 300 Ukrop Way Small Hall, Room 39A Williamsburg, VA 23187
Will Henninger
- Our shop director
- Lead on local assembly
- Phone: (757) 221-3504
- Email:
wjhenninger@wm.edu
Who’s doing what?
7/28/16 HV test mechanical 4
- CPA mechanical
- ANL providing all assembly except…
- W&M making channels nuts, z
brackets, profiles, and connector tabs
- CERN providing resistive cathode
sheet and frame covers
- APA mechanical
- ANL making frame, sheets, and edge
weldments, mounting feet for both APAs
- FC mechanical
- W&M providing FC and base
- BNL providing profiles, end caps
- SBU providing G10 pins for frames
- Top/bottom ground planes
- CERN
- HV cup/arm
- Davis
- HV supply/feed through
- KSU/UCLA
- Resistor divider chain
- LSU (boards, nuts, bolts)
- KSU (I cannot recall this morning)
- Yale (HV test)
- CPA/APA electrical connection
- ??? (not Wisc like in PD, right?)
- Local electrical approval, PORC,
ORC…
- FNAL
Assembly steps
7/28/16 HV test mechanical 5
APA bolts to I beam of lower HV wall
Assembly steps
7/28/16 HV test mechanical 6
- Add the top HV cages
- Bolt to APAs & CPA
- Then add the top
ground plane panels
- Comes in 6 parts
Assembly steps
7/28/16 HV test mechanical 7
- End wall HV bolts to tabs in
the APA frames
W&M Update
7/28/16 HV test mechanical 8
Shop work
- Completed profile nuts
- Completed connector plates for APA
- Working in Z-clips
Clean room prep
- Got small parts heated ultrasounds
cleaner
- Take over clean room from a JLAB
Cherenkov (GRINCH) project next week
- Clean up following week and arrange
work space (students arrive Wed)
- 20x20 foot^2 with an 8x8 cut out in
- ne corner
- Inside a 36x24ft^2 lab, which we own
for project
- Still working to get a vendor for cutting
the FRP parts; getting help from Thomas and Vic
- Small parts to be ordered this week
- High bay prep
- Next week cleaning and reconfigure
space (students arrive Wednesday)
- Epoxy coating for FRP parts, staging,
shipping crate assembly, large cleaning bathtub,