LM WIND POWER
The India story...
LM WIND POWER The India story... AGENDA 1. Milestones in the - - PowerPoint PPT Presentation
LM WIND POWER The India story... AGENDA 1. Milestones in the Indian journey 2. Our CSR Initiatives 3. Wind- Tailwinds and Headwinds 25 years of excellence in wind rotor blade production in India Vadodara 5 Mold facility & expanding
The India story...
2007 2017 2016 2013 2014 2015 2012 2011 2010 2008 2009
67m Blades 13.4 m Blades
1993 2018
Industrial Area.
facility for VESTAS. Certifications:
Dabaspet 8 Mold facility & expanding
GIDC Industrial Area
facility for GAMESA Certifications:
25 years of excellence in wind rotor blade production in India
Vadodara 5 Mold facility & expanding
1603 1274
LM Technology Centre India
Spearheading innovation in Blade technology
Bangalore city
179
93 m
10+ GW equivalent blades produced. 23 K blades produced and dispatched.
Our CSR initiatives
Tailwinds
increasing per capita electricity consumption and Government commitment to provide quality and affordable 24x7 power to all
targets resulting in ambitious RE capacity addition plan, 60 GW cumulative Wind capacity by 2022
concluded until last quarter; 16 GW worth auctions needed to reach 60 GW target
manufacturing base available. Potential for growth as global macro and geopolitical situations support India manufacturing; however manufacturing competitiveness needs to be further improved Headwinds
competitive auction
reduced capacity on offer and intermittent timing of bids
enhancement and land acquisition issues pose risk for timely project executions Ask / Suggestions
auctions gives clear path for project execution and upstream manufacturing across value chain
a fair & transparent auction mechanism
be ensured to meet target of 60 GW wind installation by 2022
A clean business
To be the world’s largest manufacturer of blades. We strive to be the preferred supplier to the wind industry, respected for our superior design, technology and service, making our customers more successful and wind energy more compelling.
A clean planet
We are a dynamic organization, constantly pushing the barriers of blade technology. Our long term commitment to a sustainable future and a clean planet underpins everything we do.
1940
Lunderskov Møbelfabrik (LM) was established by Aage Skouboe & Ejnar Lorentzen, producing a line of wooden furniture
1953
Start to work with fiber glass – LM Camping and LM Glasfiber are established as separate units and unites high quality carpentry with Glass fiber exterior
1948
Camping trailer production - high quality carpentry
1967
Motor sailers – again, glass fiber exterior and wooden
boats was synonymous with LM Glasfiber
The early years
1978
Rotor blade production began…
From Glass fiber to wind power
2006
Global management; Global R&D
1989
Largest independent Manufacturer of rotor blades
2001
Doughty Hanson acquires LM Glasfiber
2009
LM Glasfiber + Svendborg Brakes combine
2010
LM Glasfiber becomes LM Wind Power
2013
Doughty Hanson sells Svendborg Brakes
1993
India
1994
Spain
1999
USA
2007
Additional plants , Spain, India and China Global business
The Netherlands
2008
Additional plant, USA Poland
2010
Additional plant, China
2006
Canada
2013
Brazil
2001
China
2004
61.5 m blade introduced (world’s longest blade at the time)
1996
1st generation Lightning-Protection Vortex generators
2003
FutureBlade technology
2002
Pre-bending
1999
VARTM vacuum infusion technology
2012
73.5 m blade introduced (world’s longest blade at the time)
2017
GE acquires LM Wind Power
2016
88.4 m blade introduced (world’s longest blade at the time)
2016
Additional plant, India Turkey
2017
Additional plant, China France, first dedicated
Extensive experience from top positions within leading corporations
OWNERSHIP
In October 2016, GE announced intentions to acquire LM Wind Power for an enterprise value of EUR 1.5 billion. The deal closed on April 20th, 2017, and LM Wind Power is now an independent subsidiary of GE Renewable Energy. GE Renewable Energy takes the earth’s most abundant resources - the strength
heat of the sun - and puts them to work with breakthrough technology that unleashes their true possibilities.
GROUP MANAGEMENT
Allan Riber VP, Industrialization Christopher Springham VP, Communications & Sustainability Miguel Balbuena VP, Quality & HSE Dorte Kamper VP, Sales & Marketing Hanif Mashal VP, Engineering Alexis Crama, VP, Offshore Lars Fuglsang, VP, LM4GE & Growth Monica Ghielmetti Leader, Human Resources Rodrigo Torres CFO Bjarne Sandager Nielsen VP, Operations & Sourcing Duncan Berry CEO
Customers determine our success Stay lean to go fast Learn and adapt to win Empower and inspire each other Deliver results in an uncertain world
Calculations are based on European data
A broad customer portfolio
In 2016 we supplied rotor solutions to most of the leading wind turbine manufacturers worldwide
Strategic partnerships
Our business is based on long-term customer relationships, integrated product development and business development cooperation
Contact details: Headquarters:
Torben Mølby LM Wind Power Deputy Head of Global Operations Jupitervej 6 Interim Head of India Operations 6000 Kolding Denmark Tel +45 79 84 07 90 Tel +45 79 84 00 00 Mob +45 51 38 87 90 Fax +45 79 84 00 01 E tmoe@lmwindpower.com E info@lmwindpower.com W lmwindpower.com Note: The contents of this presentation are confidential and may not be copied, distributed, published or reproduced in whole or in part, or disclosed or distributed by recipients to any other person.