1
Caterpillar Confidential Green
CO&G STRATEGY
Leveraging Digital Technology to Optimize Equipment Operation and Maintenance
David Dunlevy General Manager, Caterpillar Oil & Gas Williston Basin Breakthrough Technologies
Leveraging Digital Technology to Optimize Equipment Operation and - - PowerPoint PPT Presentation
Leveraging Digital Technology to Optimize Equipment Operation and Maintenance David Dunlevy General Manager, Caterpillar Oil & Gas Williston Basin Breakthrough Technologies CO&G STRATEGY 1 Caterpillar Confidential Green Cater
1
Caterpillar Confidential Green
CO&G STRATEGY
David Dunlevy General Manager, Caterpillar Oil & Gas Williston Basin Breakthrough Technologies
2
Caterpillar Confidential Green
CO&G STRATEGY
3
Caterpillar Confidential Green
CO&G STRATEGY
Gas Compression Well Service Drilling Production
Primarily Upstream and Midstream
4
Caterpillar Confidential Green
CO&G STRATEGY
5
Caterpillar Confidential Green
CO&G STRATEGY
6
Caterpillar Confidential Green
CO&G STRATEGY
1.
diagnostics (over J1939) to warn the operator of leak or cavitation, to prevent damage to the pump
$512k $512k A Annual C l Cost S Savin ings*
1 2 3
2.
DTOC – Dynamic Transmission Output Control
Simplif ifie ied f frac r rig g (or full f frac s spread) o
ion
$192k $192k A Annual F l Fuel S l Savin ings*
Pr Provi vides a s a “ “1-touch” p pres essure t e test routine t that i is Saf afe & & Accurate
3.
RS – Engine Idle Reduction System
via J1939
$217k $217k A Annual F l Fuel S l Savin ings*
Combined $921k annual O&O cost reduction per fleet for the customer & improves safety
*Assuming a 16 unit frac rig fleet
7
Caterpillar Confidential Green
CO&G STRATEGY
8
Caterpillar Confidential Green
CO&G STRATEGY
24 July 2014 3rd escalation and failure at 6:57PM 10 July 2014 1st Escalation 2 July 2014 Check compressor valve
Value $100,000 lost production at $3.00/MCF ~ $30,000 to $40,000 parts and labor = $130,000 TOTAL LOSS
18 July 2014 2nd Escalation
Gas Compression Unit
25 July 2014 Back Online at 9:01PM
*(Recommended repair cost <$2000)
9
Caterpillar Confidential Green
CO&G STRATEGY
at 2:00 AM warns of Low Coolant Level
discovers leaking hose
is Repaired
Avoided
10
Caterpillar Confidential Green
CO&G STRATEGY
SYMPTOMS:
and Excessive Fuel Consumption ROOT CAUSE
Bank of 12 Cylinder Engine VALUE DELIVERED
Emergency Service Callout Were Avoided
11
Caterpillar Confidential Green
CO&G STRATEGY
12
Caterpillar Confidential Green
CO&G STRATEGY
Monitoring
Identifies Faulty Spark Plug
Plug during planned shutdown later that day
Callout Avoided
13
Caterpillar Confidential Green
CO&G STRATEGY
Remote troubleshooting is a new technology enabling customers and Cat dealers to remotely perform most Caterpillar Electronic Technician (Cat ET) service tool tasks BENEFITS
14
Caterpillar Confidential Green
CO&G STRATEGY