Lee Robinson Strategic Director Scope Transport Staff Mileage / - - PowerPoint PPT Presentation

lee robinson strategic director scope
SMART_READER_LITE
LIVE PREVIEW

Lee Robinson Strategic Director Scope Transport Staff Mileage / - - PowerPoint PPT Presentation

Lee Robinson Strategic Director Scope Transport Staff Mileage / Pool car utilisation 250m Here is Edward Bear, coming downstairs now, bump, bump, bump, on the back of his head, behind Christopher Robin. It is, as far as he knows,


slide-1
SLIDE 1

Lee Robinson Strategic Director

slide-2
SLIDE 2

Transport

Staff Mileage / Pool car utilisation

Scope £250m

slide-3
SLIDE 3

“Here is Edward Bear, coming downstairs now, bump, bump, bump, on the back of his head, behind Christopher

  • Robin. It is, as far as he

knows, the only way of coming downstairs, but sometimes he feels that there really is another way, if

  • nly he could stop bumping

for a moment and think of it. And then he feels that perhaps there isn't.”

slide-4
SLIDE 4

Why? Why? Why? Why? Why? Why? Why?

slide-5
SLIDE 5

Why do we do this? Criteria Culture Caring? Meeting need – delivering outcomes?

slide-6
SLIDE 6

Why do we do it this way? Linear thinking versus lateral thinking Culture Contracts Chaos

slide-7
SLIDE 7

Why don’t we know? The call for evidence Data Metrics Information Knowledge

slide-8
SLIDE 8

The bigger picture Parcels that talk back? Regional footprints?

slide-9
SLIDE 9

Summary W + W + W = HG Why – do we do it this way? Why – don’t we know? Why – do we do this?