KOH BROTHERS GROUP LIMITED

ANNUAL GENERAL MEETING 17 APRIL 2019

Bu Build ilding Ci Citi ties Buil Buildin ing Dr Dreams

slide-2
SLIDE 2

Disclaimer

Information in this presentation may contain forward-looking statements that reflect the current views of Koh Brothers Group Limited (the “Company” and together with its subsidiaries, the “Group”) with respect to future events and financial

  • performance. These views are based on the current assumptions which are subject to unknown risks and uncertainties,

which may change over time. No assurance can be given that future events will occur, that projections will be achieved, or that the assumptions are correct. Actual results may differ materially from those anticipated as a result of the risks faced by

  • us. The views expressed here also contain some information derived from publicly available sources that have not been

independently verified. This presentation does not constitute or form part of any opinion on any advice to sell, or any solicitation of any offer to subscribe for, any shares nor shall it or any part of it nor the fact of its presentation form the basis of, or be relied upon in connection with, any contract or investment decision or commitment whatsoever. The Group does not intend, and does not assume any obligation, to update any industry information or forward-looking statements set forth in this presentation to reflect subsequent events or circumstances. Despite the fact that utmost care has been taken to ensure that the information on this presentation slides are as accurate as possible, the Group does not accept any liability for errors or omissions nor for the consequences of using the information or the material available in this presentation

Building Citi ties Bui

Build ldin ing Dreams

slide-3
SLIDE 3

BUSINESS OVERVIEW BUSINESS STRATEGIES FINANCIAL HIGHLIGHTS

1 2 3

Bu Build ldin ing Ci Citie ies Bu Build ldin ing Drea eams

slide-4
SLIDE 4

Bu Build ldin ing Ci Citie ies Bu Build ldin ing Drea eams

BUSINESS OVERVIEW

slide-5
SLIDE 5

Diversified & Synergistic Business Portfolio

Leisure & Hospitality

  • Hotel

Real Estate

(Development & Investment)

  • Residential Developments
  • Investment Properties

Construction

  • Infrastructure
  • Building
  • Water & Wastewater Treatment
  • Hydro-Engineering
  • Bio-Refinery & Bio-Energy

Building Materials

  • Cement
  • Ready-Mixed Concrete
  • Precast Concrete Products
  • Concrete Pump Rental
slide-6
SLIDE 6

Real Estate - Recently Completed Project West estwood R

  • od Reside

esidences nces

Loca Location tion Westwood Avenue Res esidential idential Units nits 480 Year ear of

  • f T

TOP 2017 Project Brief

  • ject Brief
  • First cycling-themed development
  • First outdoor mini-velodrome
  • First

secured covered bike garage with biometric vein scanner access and CCTV monitoring system

  • First bike maintenance area with washing, air

drying, central tyre pumping and repair stations Aw Awar ards ds

  • Edgeprop S ’pore Excellence Awards
  • Innovation Excellence
  • PropertyGuru Asia Property Awards
  • Best EC
  • Best EC Architectural Design
  • Best EC Landscape Architectural Design

Group’s Stake (%) 80 % % Sold

  • ld

100

slide-7
SLIDE 7

Loca Location tion Gangnam District in Seoul Project Brief

  • ject Brief
  • Nonhyeon I’PARK, comprises 99 apartment

units, 194 “OfficeTel” SoHo units and 53 retail units within a land area of 4,611 sqm and gross floor area of 30,816 sqm.

  • Offering

doorstep integrated lifestyle amenities to its residents in the prime Gangnam district of Seoul

  • To address demand gap for centrally-located

and compact residential units for single professionals, double-income families, and real estate investors Expected xpected Completion Completion ~ 2H 2020 % % Sold

  • ld

97 (75% of all units sold within the first 7 days of launch) Group’s Stake (%) 45

Real Estate - Recently La Launched Project

Nonhyeon IPARK (Gangnam, Seoul)

slide-8
SLIDE 8

Real Estate - Recently La Launched Project Nonhyeon IPARK (Gangnam, Seoul)

Sales launch in March 2018

As at 31 March 2019 Total Units Units Sold % Sold Apartment 99 98 99 OfficeTel 194 184 95 Retail 53 53 100 Total 346 335 97

Sales Status Overview

slide-9
SLIDE 9

Real l Estate – Project To Be Launch ched Van Holland

Group’s Stake 100% Location Holland Road Expected Launch 2H2019 Expected Completion ~ 2022 Total Land Size 4,428 sqm

  • No. of Units

80 to 100 Project Brief

  • Freehold condo strategically located just

next to Good Glass Bungalow housing estate and also a short distance away from Holland Village Shopping Centre

  • Introducing a new concept that will deliver

its residents better living spaces coupled with convenience and excellent connectivity

  • High development baseline and in proximity

to Holland Village MRT Station.

slide-10
SLIDE 10

Real Estate Track Record (P (Past Projects)

Name of Development Fiorenza Lincoln Suites Parc Olympia Location 42 Florence Road 1 and 3 Khiang Guan Ave 50 Flora Drive Residential Units 28 175 486 Year of TOP 2011 2014 2015 Project Brief Italian modern living with sky gymnasium and glass jacuzzi in the balcony Prime condo in Newton featuring 360-degree spa pool and sky gym Sports-themed condo with specialized facilities Group’s Stake (%) 100 25 100 % Sold 100 97 100

slide-11
SLIDE 11

Real Estate In Investments

Sun Plaza – completed asset enhancement exercise in 2015 to optimise space utilisation and improve retail tenant mix; achieved full

  • ccupancy and improved revenues

Alocassia – located in prime district along Bukit Timah Road and the proximity to Stevens MRT Station First City Complex, Batam (Indonesia) – Commercial and office units, as well as apartments

slide-12
SLIDE 12

Construction Track Record (P (Past Projects)

Changi Changi Water R ter Rec eclama lamation tion Plant lant Pung unggol gol Waterw terway ay Bugis Bugis MRT S Sta tation tion (Do Downto ntown Line n Line) Marina Bar arina Barrage ge Vine ine Grove e (Yis Yishun hun) HDB DB Bukit Bukit Timah imah Canal Div Canal Diver ersion ion

slide-13
SLIDE 13

Ongoing Construction Proje jects

Deep Tunnel Sewerage System (Phase 2) Circle Line 6 Marina East Desalination Plant Approximate Contract Value S$520.0M S$225.4M S$153.6M Client PUB LTA Keppel Seghers Pte. Ltd. Expected Completion 1H2023 1H2025 1H2020

  • Section from South Tunnel

at Tuas Road and Industrial Tunnel at Pioneer Road to the Tuas Water Reclamation Plant (10km)

  • Design and construction of

the tunnels, shafts and other features required

  • All civil, structural,

architectural, electrical & mechanical and system works relating to the construction of cut-and- cover tunnels and other structures from the east of the planned Prince Edward Station to the existing Marina Bay Station

  • KBE to tap on newly-

acquired civil engineering capabilities and existing expertise in hydro- engineering to design and build the piling, civil, structural, building and piping service works

slide-14
SLIDE 14

Ongoing Construction Proje jects

Woodlands Health Campus Changi Airport Runway 3 (Package 1) Kallang-Bishan River Upgrading Approximate Contract Value S$960.1M S$1.12B S$86.3M Client Ministry of Health Changi Airport Group PUB Expected Completion 1H2021 2H2019 2H2019

  • To develop the Woodlands

Health Campus

  • Singapore’s first smart

hospital campus comprises an acute hospital, a community hospital, specialist outpatient clinics and nursing home

  • The first all facilities are

conceptualized and built simutaneously

  • Largest contract win to-date

(30% stake)

  • Effect three-runway operations

at Changi Airport Terminal 5

  • Tap on Koh Brothers’ flood

alleviation and drainage expertise, and ability to produce building materials

  • Section of Kallang River

between Bishan and Braddell Road

  • ABC Waters project to

transform this section of the canal into a beautiful stream that is integrated with the surroundings

slide-15
SLIDE 15

Healthy Construction Order Book

576.8 762.7 682.8 .8

100 200 300 400 500 600 700 800 900

FY2016 FY2017 FY2018

Order Book (S$’ m)

Current projects progressing on schedule

slide-16
SLIDE 16

Building Materials (G (G&W Group)

  • The Building Materials division established in 1980 is a renowned one-

stop quality provider of concrete solutions to the construction industry

  • Supply chain includes cement, ready-mix concrete, pre-cast concrete

products such as facades, household shelters, pre-fabricated bathroom units, columns and planks

  • Provides rental services of equipment, namely concrete pumps
  • Implements a central truck-mixer dispatch system to facilitate the efficient

dispatch of trucks to meet the demands of clients around Singapore so as to achieve greater efficiency

  • Operates precast plants at Tuas in Singapore and one in Senai within

Iskandar, Malaysia

  • Total land area: approximately 49,300 sqm
slide-17
SLIDE 17

Leisure & Hospitality – Oxford Hotel

  • Freehold 130-room hotel strategically located in

Singapore’s CBD (Queen Street)

  • Easy connectivity: Near Bras Basah MRT station
  • Completed asset enhancement in 2014 to improve

quality of services

  • Meanwhile,

the Group will continue to seek investment

  • pportunities

in hotel properties locally and overseas

slide-18
SLIDE 18

Bui uildi ding g Cities es Bui uildi ding g Drea reams

BUSINESS STRATEGIES

slide-19
SLIDE 19

Competitive Strengths

Established Track Record; Strong Brand Diversified Revenue Streams Synergistic Businesses; Complementary Expertise Quality Assets & Strategic Location Inventory of Civil Engineering Equipment Experienced & Stable Management

slide-20
SLIDE 20

Business Strategies

Capitalise On Business Synergies

  • Increase collaboration opportunities amongst various business lines
  • Harness operating synergies and economies of scale amongst various businesses
  • Sharpen the Group’s competitive edge amidst challenging operating environment

Pursue Higher Value Projects

  • Develop real estate projects with unique or innovative features for greater product

differentiation

  • Prudently pursue high-yield projects and tenders
  • Explore growing opportunities in the water and wastewater and hydro-engineering sectors

with enhanced capabilities

Raise Productivity

  • Continue investing in productivity management measures
  • Increase the use of automation and technology
  • Adopt innovative methods to drive productivity and efficiency

Diversify Portfolio

  • Export established brand and niche overseas through JV/strategic partnerships
  • Prudently diversify portfolio geographically and across sectors to gradually reduce

dependency on Singapore market

  • Enhance recurring income streams
slide-21
SLIDE 21

Bu Build ldin ing Ci Citie ies Bu Build ldin ing Drea eams

FINANCIAL HIGHLIGHTS

slide-22
SLIDE 22

Financial Snapshot – Summary ry

Revenue (S$’m)

345.7 .7 403.8 .8 403.6 .6 300.0 320.0 340.0 360.0 380.0 400.0 420.0 FY2 Y2016 FY2 Y2017 FY2 Y2018

S$’m FY2016 FY2017* FY2018 Revenue 345.7 403.8 403.6 Gross Profit 29.0 15.5 21.5 Gross Profit Margin (%) 8.4 3.8 5.3 Profit Before Tax 17.3 26.9 10.2 Net Profit attributable to Equity Holders 13.3 20.6 6.6 Earnings per share (SGD cents) 3.21 4.98 1.60

17.3 .3 26.9 .9 10.2 .2 0.0 5.0 10.0 15.0 20.0 25.0 30.0 FY2016 FY2017 FY2018

Profit Before Tax (S$’m)

*FY2017 results have been restated due to adoption of SFRS(I)

13.3 .3 20.6 .6 6.6 .6 0.0 5.0 10.0 15.0 20.0 25.0 FY2016 FY2017 FY2018

Net P et Prof

  • fit

it attributa ttributable to ble to Equity Holders (S$’m)

slide-23
SLIDE 23

Net Revenue By Business Segments

1.8% 1.8% 0.8% 0.8% 97.4% 97.4% Real Estate Construction & Building Materials Leisure & Hospitality

FY201 FY2017

1.8% 1.8% 0.9% 0.9% 97.3% 97.3%

FY20 FY2016 16

Construction & Building Materials Real Estate Leisure & Hospitality 1.5 1.5% 0.8% 0.8% 97.7% 97.7% Construction & Building Materials Real Estate Leisure & Hospitality

FY2 FY201 018

slide-24
SLIDE 24

Gearing (N (Net Debt to Equity)

S$’m Dec 31, 2016 Dec 31, 2017 Dec 31, 2018 Cash and Bank Balances 43.2 64.8 32.7 Net Debt 96.7 133.3 289.4 Net Debt to Equity (x) 0.37 0.47 1.03

0.37 0.37 0.47 0.47 1.03 1.03

0.00 0.20 0.40 0.60 0.80 1.00 1.20

FY2 FY2016 016 FY2 FY2017 017 FY2 FY2018 018

Net Net De Debt bt to to Equity Equity (x) (x)

slide-25
SLIDE 25

Balance Sheet & Key Ratios

S$’m Dec 31, 2016* Dec 31, 2017* Dec 31, 2018 Current Assets 320.2 363.9 450.7 Current Liabilities 215.1 233.1 227.4 Net Current Assets 105.1 130.8 223.3 Current Ratio (x) 1.49 1.56 1.98 Total Assets 619.3 711.0 799.2 Total liabilities 343.1 405.3 493.7 Net Tangible Assets Attributable to Equity Holders 259.2 278.8 277.1 Net Tangible Assets Per Share (SGD cents) 62.66 67.55 67.19

*FY2016 and FY2017 balance sheets have been restated due to adoption of SFRS(I)

slide-26
SLIDE 26

THANK YOU

Bu Build ildin ing Citi Cities Bu Buil ilding Dr Dreams