ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR - - PowerPoint PPT Presentation

itu r wp5d imt2020 developing countries discussion
SMART_READER_LITE
LIVE PREVIEW

ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR - - PowerPoint PPT Presentation

ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR JAN 28, 2020 AGEN GENDA What has happened so far What is the way forward DISTRIBUTION OF THE DISTANCE BETWEEN VILLAGES AND THEIR CLOSEST GRAM PANCHAYAT The GP and


slide-1
SLIDE 1

PAMELA KUMAR JAN 28, 2020

ITU-R WP5D : IMT2020 Developing Countries discussion

slide-2
SLIDE 2

AGEN GENDA

  • What has happened so far
  • What is the way forward
slide-3
SLIDE 3

DISTRIBUTION OF THE DISTANCE BETWEEN VILLAGES AND THEIR CLOSEST GRAM PANCHAYAT

The GP and village list was obtained from the government website http://lgdirectory.gov.in/. ISD: Inter Site Distance, R: Radius

slide-4
SLIDE 4

ITU-R Test Configuration: LOW MOBILITY LARGE CELL (LMLC) proposal for Rural Broadband proposed in Oct 2016

Gram Panchayat

Village Village Village

Village

BS at the GP should serve the nearby villages

Village Village Village

slide-5
SLIDE 5

eMBB mMTC URLLC

Indoor Hotspot eMBB

Dense Urban eMBB

Rural eMBB

IMT2020 Usage Scenarios (M.2083) – LMLC is mandatory

June 2017

Urban macro mMTC

Urban macro URLLC Test Environments

Config A 4 GHz Config B 30 GHz Config C 70 GHz Config A 4 GHz (1 layer) Config B 30 GHz (1 layer) Config C 4/30 GHz (2 layer) Config A 700 MHz, 120/500 km/h ISD 1.732km Config B 4 GHz, 120/500 km/h ISD 1.732km LMLC 700 MHz, 30 km/h ISD 6km Config A ISD 500m Config B ISD 1.732 km Config A 4 GHz Config B 700 MHz

Test Configurations

TPR are defined for the Test Environments

In addition, for Rural-eMBB test environment, average spectral efficiency value should meet the threshold values for LMLC evaluation configuration with ISD of 6000m and either evaluation configuration with ISD of 1732m

slide-6
SLIDE 6
  • 1. Pi/2 BPSK with spectrum shaping and non-precoded DMRS.
  • 2. Intelligent BWP configurations for resource block group (RBG)

based scheduling.

  • 3. Low latency sounding reference signal (SRS) precoder update.
  • 4. Intelligent PTRS threshold parameters.

ITU-R WP5D #31 (Feb 2019)

  • Interim submission at ITU

ITU-R WP5D #32,33 (July, Dec 19)

  • RIT submission at ITU – STEP 3

DOT/TEC deliberations for making it a national standard

Highlights of some of the Major Changes

IMT 2020 – RIT proposal

ITU Meeting #34 - #37 (Feb, June, Oct, Nov, Dec 20)

  • Step 4 to 8 (Evaluation & Harmonisation)
  • Final Approval at ITU
slide-7
SLIDE 7

June 2017

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
  • :

11

  • Capacity & Coverage enhancements(wrt Rel16)
  • In-Band Full-Duplex Study Proposal
  • IAB enhancement
  • MBMS support for 5G NR
  • Support for SA Deployment Option-6
  • Consider DU&RU split options 3,6&7

TSDSI Proposal for 3GPP Release 17

TSDSI entrusted with the role to “ track in a horizontal umbrella fashion the progress made on sub topics, within the different Work Areas (for 3GPP Release 17), that are important for NR deployment in developing countries and report status to TSG RAN”