PAMELA KUMAR JAN 28, 2020
ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR - - PowerPoint PPT Presentation
ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR - - PowerPoint PPT Presentation
ITU-R WP5D : IMT2020 Developing Countries discussion PAMELA KUMAR JAN 28, 2020 AGEN GENDA What has happened so far What is the way forward DISTRIBUTION OF THE DISTANCE BETWEEN VILLAGES AND THEIR CLOSEST GRAM PANCHAYAT The GP and
AGEN GENDA
- What has happened so far
- What is the way forward
DISTRIBUTION OF THE DISTANCE BETWEEN VILLAGES AND THEIR CLOSEST GRAM PANCHAYAT
The GP and village list was obtained from the government website http://lgdirectory.gov.in/. ISD: Inter Site Distance, R: Radius
ITU-R Test Configuration: LOW MOBILITY LARGE CELL (LMLC) proposal for Rural Broadband proposed in Oct 2016
Gram Panchayat
Village Village Village
Village
BS at the GP should serve the nearby villages
Village Village Village
eMBB mMTC URLLC
Indoor Hotspot eMBB
Dense Urban eMBB
Rural eMBB
IMT2020 Usage Scenarios (M.2083) – LMLC is mandatory
June 2017
Urban macro mMTC
Urban macro URLLC Test Environments
Config A 4 GHz Config B 30 GHz Config C 70 GHz Config A 4 GHz (1 layer) Config B 30 GHz (1 layer) Config C 4/30 GHz (2 layer) Config A 700 MHz, 120/500 km/h ISD 1.732km Config B 4 GHz, 120/500 km/h ISD 1.732km LMLC 700 MHz, 30 km/h ISD 6km Config A ISD 500m Config B ISD 1.732 km Config A 4 GHz Config B 700 MHz
Test Configurations
TPR are defined for the Test Environments
In addition, for Rural-eMBB test environment, average spectral efficiency value should meet the threshold values for LMLC evaluation configuration with ISD of 6000m and either evaluation configuration with ISD of 1732m
- 1. Pi/2 BPSK with spectrum shaping and non-precoded DMRS.
- 2. Intelligent BWP configurations for resource block group (RBG)
based scheduling.
- 3. Low latency sounding reference signal (SRS) precoder update.
- 4. Intelligent PTRS threshold parameters.
ITU-R WP5D #31 (Feb 2019)
- Interim submission at ITU
ITU-R WP5D #32,33 (July, Dec 19)
- RIT submission at ITU – STEP 3
DOT/TEC deliberations for making it a national standard
Highlights of some of the Major Changes
IMT 2020 – RIT proposal
ITU Meeting #34 - #37 (Feb, June, Oct, Nov, Dec 20)
- Step 4 to 8 (Evaluation & Harmonisation)
- Final Approval at ITU
June 2017
- :
11
- Capacity & Coverage enhancements(wrt Rel16)
- In-Band Full-Duplex Study Proposal
- IAB enhancement
- MBMS support for 5G NR
- Support for SA Deployment Option-6
- Consider DU&RU split options 3,6&7
TSDSI Proposal for 3GPP Release 17
TSDSI entrusted with the role to “ track in a horizontal umbrella fashion the progress made on sub topics, within the different Work Areas (for 3GPP Release 17), that are important for NR deployment in developing countries and report status to TSG RAN”