  2. Catalyst Metals Ltd Catalyst Metals Ltd Company Objectives Company Objectives To create shareholder value by pursuing  advanced gold and metals projects Goal is to generate cashflows from operations  within 2 years Flagship Four Eagles Gold Project in Victoria  provides potential for early exploration success

  3. Current Projects Current Projects Four Eagles Gold Project (Victoria) Four Eagles Gold Project (Victoria) Joint venture exploration for a potential new of  Bendigo ‐ style goldfield below shallow cover Minnie Springs Project (Western Australia) Minnie Springs Project (Western Australia) Molybdenum and Tungsten mineralisation  in the Gascoyne Mineral Field Everton Project (Victoria) Everton Project (Victoria) Historical high ‐ grade Molybdenum mine 

  4. Four Eagles Gold Project Four Eagles Gold Project Located along major fault  extension from Bendigo goldfield Prospective rocks concealed  by shallow cover Broad spaced Providence  drilling shows high ‐ grade gold in Bendigo sequence rocks Tenements cover  25km strike length of prospective corridor

  5. North Bendigo Tenements North Bendigo Tenements NO R T H 230,000mE 250,000mE 270,000mE 290,000mE V I C T O R I A N S W EL5295 6,000,000mN Echuca Four Eagles Prospective Mitiamo Target EL4525 Lockington T W a n 5,980,000mN h d i a t e r r l a a w Rochester F Tandarra Project F a u l Gold deposit/ t occurrence 5,960,000mN Town / city EL4525 Main Road Raywood Exploration Licence Holding Companies Sebastian Catalyst Drummond / Unity JV 5,940,000mN Castlemaine Fosterville Navarre / Northgate Northgate Bendigo Bendigo Timpetra Goldfield Fosterville Goldfield 5,920,000mN 0 20 kilometres

  6. Bendigo: a world-class gold target Bendigo: a world-class gold target New Chum Line Bendigo Goldfield 7.3mt @14.5g/t Au Nell (3,390,000oz) Gwynne Lines Line Garden Gully Line of Lode 4.6mt @14.1g/t Au e (2,080,000oz) n Zo BENDIGO n o i Hustlers Line t c u 1.6mt @17.6g/t Au r d o (918,000oz) P Total Production URBAN l a (1851 - 1954) oric Deborah Line 0.46mt @14.7g/t Au t s i (217,000oz) H • 18 million ounces Napoleon AREA reef gold (14g/t Au) Line Sheepshead Line 1.7mt @11.7g/t Au • 4 million ounces (634,000oz) alluvial gold • Minimum 200,000 ounces per year for NO R T H 60 years 0 2 kilometres

  7. Quartz Reef Structural Schematic Quartz Reef Structural Schematic Bendigo Goldfield Quartz Reef Structural Schematic Associated with  Modified Saddle Reef False Saddle anticlinal axis with Spurs in footwall Saddle Reef Importance of  slate beds West Dipping Fault Reef with associated S y n c l i n e Spurs in footwall Difficult drilling  A targets n t i c l i n e Leg Reef Saddle Reef with Neck Reef Spurs associated Saddle Reef with Leg Reef Stratabound Spurs associated with Slate beds minor faults

  8. ’ e l a h S e u l B g i B ‘ Sheepshead Anticline ‘Big Blue Shale’ ‘Rowes Shale’ n e l i ’ c e y n S h l a ’ o r a e b D e h l a S h S s e e u w l B o g R i B ‘ ‘ ‘Railway Shale’ Neck e n Reef l i c t i n A h a o r b e D Actual Cross Section Actual Cross Section Laminated quartz 100 Quartz / gold Limb Thrust Axial plane Slate beds vein (LQV) Metres 0 (after Boucher et al) Goldfield Bendigo

  9. Bendigo Target Size Bendigo Target Size Sheepshead Anticline (South) Line of Lode Bendigo S O U T H NO R T H -500RL -1000RL PRODUCTION Approx. 1.4 million tonnes @ 12 g/t Au (550,000 ozs) LEGEND -1500RL Mineralised ribbon Historic Stoping 0 1000 Metres 123500mN 124500mN 125500mN 126500mN

  10. Bendigo Target Size Bendigo Target Size Deborah Anticline Line of Lode Bendigo S O U T H NO R T H Monument North Central Deborah Hill Central Deborah Deborah R e e f N o . 1 R Deborah Fault e e f N o . 5 R e e f N o . 6 Kingsley N o . 7 N o Lode . 8 PRODUCTION LEGEND 460,000tonnes @ 14.7g/t Au Pitch of reef “New Formation” (216,000 ozs) Stoped areas 0 600 Metres Data source: Mines Department unpublished plan by Chambers, 1947 & Deborah manager’s book.

  11. Bendigo Target Size Bendigo Target Size Bendigo Target Size New Chum Line of Reef Bendigo S O U T H 0mRL -500mRL PRODUCTION 7.3 million tonnes @ 14.5 g/t Au (3.4 million ozs) -1000mRL NO R T H 0mRL -500mRL LEGEND 0 500 Historic Stoping Shaft Metres -1000mRL

  12. Four Eagles Gold Project Four Eagles Gold Project 240,000mE 250,000mE Drillhole Intersections 1. FE380 3m @ 9.71g/t Au from 120m EL5295 NO R T H 14 2. FE379 3m @ 0.2g/t Au from 120m 3. FE331 3m @ 0.59g/t Au from 126m 0 4 4. FE297 6m @ 0.45g/t Au from 78m kilometres 5. FE328 6m @ 82.7g/t Au from 123m 5,995,000mN and 6m @ 1.85 g/t Au from 135m 6. FE299 3m @ 0.39g/t Au from 126m 7. FE320 3m @ 0.33g/t Au from 87m 8. FE319 3m @ 0.2g/t Au from 57m 9. FE333 6m @ 0.66g/t Au from 135m 10. FE339 3m @ 0.26g/t Au from 81m 11. FE305 3m @ 0.38g/t Au from 75m 13 12. FE326 13.5m @ 0.45g/t Au from 102m 7 12 11 5,990,000mN 13. FE343 3m @ 3.34g/t Au from 111m 10 9 Mitiamo 14. FE316 3m @ 0.27g/t Au from 102m 3 4 8 Drillholes 1 Four Eagles 0.2 to 0.5 g/t Au 6 2 Cross 0.5 to 1.0 g/t Au Section 5 1.0 to 5.0 g/t Au > 5.0 g/t Au Gold Zone 5,985,000mN Arsenic Zone EL4525 Railway Main Road

  13. Four Eagles Gold Project Four Eagles Gold Project

  14. Four Eagles Gold Project Four Eagles Gold Project No outcrop of prospective rocks No outcrop of prospective rocks   Catalyst drills first ever diamond drillhole drillhole Catalyst drills first ever diamond   on the property in March 2011 on the property in March 2011 Previously only aircore drilling Previously only aircore drilling  

  15. Four Eagles Drill Cross Section Four Eagles Drill Cross Section Four Eagles Cross Section 5988925mN FE300 FE328 FE298 FE329 FE297 FE330 FE296 FE331 FE295 FE299 FE294 0m 3m @ 0.51g/t Au, from 78m 3m @ 1.0g/t Au 3m @ 0.59g/t Au 3m @ 0.29g/t Au from 81m from 126m from 123m 6m @ 82.7g/t Au, from 123m 6m @ 1.9g/t Au, from 135m Clay - Shepparton Fm Sand Carbonaceous Clay -250m 0 250 Saprolite Zone Metres Basement Castlemaine Gp 244000mE 244250mE 244500mE 244750mE

  16. Four Eagles Gold Project Four Eagles Gold Project Drillhole FE328, 123m to 129m depth 5mm

  17. Four Eagles Gold Project Four Eagles Gold Project Proposed Program 2011 Proposed Program 2011  Minimum expenditure $450,000  Further aircore drilling over entire strike length Phase 1: March to April 2011  – 7,913 metres completed Phase 2: September to October 2011   Angled diamond drilling of gold zones and structure Phase 1: March to April 2011  – 867 metres completed

  18. Four Eagles Gold Project Four Eagles Gold Project 240,000mE 250,000mE Drillhole Intersections 1. FE380 3m @ 9.71g/t Au from 120m Phase 1 Aircore EL5295 14 Drilling 2. FE379 3m @ 0.2g/t Au from 120m Phase 2 Aircore 3. FE331 3m @ 0.59g/t Au from 126m Drilling 4. FE297 6m @ 0.45g/t Au from 78m 5. FE328 6m @ 82.7g/t Au from 123m NO R T H 5,995,000mN and 6m @ 1.85 g/t Au from 135m 0 4 6. FE299 3m @ 0.39g/t Au from 126m kilometres 7. FE320 3m @ 0.33g/t Au from 87m 8. FE319 3m @ 0.2g/t Au from 57m 9. FE333 6m @ 0.66g/t Au from 135m 10. FE339 3m @ 0.26g/t Au from 81m 11. FE305 3m @ 0.38g/t Au from 75m 13 12. FE326 13.5m @ 0.45g/t Au from 102m 7 12 11 5,990,000mN 13. FE343 3m @ 3.34g/t Au from 111m 10 9 Mitiamo 14. FE316 3m @ 0.27g/t Au from 102m 3 4 8 Drillholes 1 0.2 to 0.5 g/t Au Four Eagles 6 2 0.5 to 1.0 g/t Au Cross 5 1.0 to 5.0 g/t Au Section > 5.0 g/t Au Gold Zone 5,985,000mN Arsenic Zone EL4525 Railway Main Road

  19. Four Eagles Gold Project Four Eagles Gold Project Drillhole Intersections 14 (3.85km north) 1. FE380 3m @ 9.71g/t Au from 120m FOUR EAGLES 2. FE379 3m @ 0.2g/t Au from 120m 3. FE331 3m @ 0.59g/t Au from 126m 2011 Aircore 4. FE297 6m @ 0.45g/t Au from 78m Drilling 18 5. FE328 6m @ 82.7g/t Au from 123m and 6m @ 1.85 g/t Au from 135m 6. FE299 3m @ 0.39g/t Au from 126m 5,992,000mN 7. FE320 3m @ 0.33g/t Au from 87m Whitelaw 8. FE319 3m @ 0.2g/t Au from 57m Bendigo Pyramid Road 6m @ 0.66g/t Au from 135m 9. FE333 10. FE339 3m @ 0.26g/t Au from 81m 11. FE305 3m @ 0.38g/t Au from 75m 13 F 12. FE326 13.5m @ 0.45g/t Au from 102m a u l 13. FE343 3m @ 3.34g/t Au from 111m t 14. FE316 3m @ 0.27g/t Au from 102m ? 11 19 RECENT INTERSECTIONS 12 10 15. FEDD001 3.7m @ 4.7g/t Au from 170m 5,990,000mN ? inc. 0.8m @ 17.5g/t Au from 173m 16. FE415 6.0m @ 2.4g/t Au from 45m 16 9 and 3.0m @ 14.7g/t Au from 57m 17 17. FE402 3.0m @ 0.9g/t Au from 90m 4 3 6 8 18. FE391 3.0m @ 0.45g/t Au from 66m 15 19. FE399 6.0m @ 1.0g/t Au from 66m 5 y r a m i d R o a d 7 B e n d i g o P ? 2 2011 Aircore program Drillhole grades 0.2 to 0.5 g/t Au Drillholes 1 5,988,000mN 0.5 to 1.0 g/t Au Gold Zone NO R T H 0 1 1.0 to 5.0 g/t Au Arsenic Zone > 5.0 g/t Au Main Road kilometre 244,000mE 242,000mE 246,000mE

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend