integrated green infrastructure
play

INTEGRATED GREEN INFRASTRUCTURE Landscape Urbanism Design - PowerPoint PPT Presentation

INTEGRATED GREEN INFRASTRUCTURE Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE WHY? Landscape Urbanism Design Strategy THE WORLD IS MADE UP OF INTERCONNECTED SYSTEMS Landscape Urbanism Design Strategy Landscape


  1. INTEGRATED GREEN INFRASTRUCTURE Landscape Urbanism Design Strategy

  2. INTEGRATED GREEN INFRASTRUCTURE WHY? Landscape Urbanism Design Strategy

  3. THE WORLD IS MADE UP OF INTERCONNECTED SYSTEMS Landscape Urbanism Design Strategy

  4. Landscape Urbanism Design Strategy

  5. HABITAT NETWORKS ACCESS NETWORKS GREEN / OPEN SPACE WATER MANAGEMENT ROADS / TRANSPORT BUILT DEVELOPMENT Strategy Design Urbanism Landscape

  6. HABITAT NETWORKS ACCESS NETWORKS GREEN / OPEN SPACE WATER MANAGEMENT ROADS / TRANSPORT BUILT DEVELOPMENT Strategy Design Urbanism Landscape

  7. Habitat Networks Water Management hydrology - catchments & hydrology - fmooding neutral grassland fen marsh swamp former John’s Burn Green and Open Spaces Stewardship over Time Integrated Green Infrastructure Strategy existing green network: south-west Glasgow undefjned amenity space landscape management plan Access Networks Landscape Urbanism Design Strategy barriers to movement: subdivision of urban area crossing points

  8. INTEGRATED GREEN INFRASTRUCTURE POLICY DELIVERY Landscape Urbanism Design Strategy

  9. INTEGRATED GREEN INFRASTRUCTURE STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK Landscape Urbanism Design Strategy

  10. INTEGRATED GREEN INFRASTRUCTURE STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK Landscape Urbanism Design Strategy

  11. SOUTH-WEST GLASGOW / NITSHILL IGI Water Management Habitat Networks hydrology - catchments & hydrology - fmooding neutral grassland fen marsh swamp former John’s Burn Green and Open Spaces Stewardship over Time Integrated Green Infrastructure Strategy existing green network: south-west Glasgow undefjned amenity space landscape management plan Access Networks Landscape Urbanism client: Glasgow & Clyde Valley Green Network Partnership / GCC barriers to movement: subdivision of urban area Design crossing points team: ERZ & Enviro-centre (ecology / hydrology) Strategy

  12. HYDROLOGY: CATCHMENTS River Clyde White Cart Water Levern Water Brock Burn Landscape Urbanism Design Strategy

  13. HYDROLOGY: FLOODING 200 year pluvial fmood 30 year pluvial fmood 1984 fmood event Landscape Urbanism Design Strategy

  14. URBAN STRUCTURE: BARRIERS Landscape Urbanism Design Strategy

  15. URBAN STRUCTURE: BARRIERS Landscape Urbanism Design Strategy

  16. URBAN STRUCTURE: DESTINATIONS 800m = 10 min walk 400m = 5 min walk Landscape Urbanism Design Strategy

  17. URBAN STRUCTURE: DENSITY Landscape Urbanism Design Strategy

  18. WIDER GREEN NETWORK: GAPS Pollok Country Park Dams to Darnley Country Park Rouken Glen Park Landscape Urbanism Design Strategy

  19. STRATEGY: GREEN NETWORK green network that functions on both a local and citywide level centre of Nitshill becomes a hub of the green network & a key point of arrival to Dams to Darnley Country Park and wider network make the green network accessible & visible & redefjne the character / identity of the area Landscape Urbanism Design Strategy

  20. STRATEGY: WATER Peat Road corridor redesigned to manage surface water thro’ SUDs features such as: swales, linear wetland, tree planting etc. SUDs features associated with adjacent residential development site incorporated into linear park SUDs feature created as terminus to boulevard on cleared site: addressing water management requirements of surrounding development sites linear swale/wetland SUDs features incorporated into design of green link: management of surface water in upper portion of catchment (south of rail line) Landscape Urbanism Design Strategy

  21. STRATEGY: OVERVIEW Landscape Urbanism Design Strategy

  22. DETAIL AREAS: Landscape Urbanism Design Strategy

  23. GREATER EASTERHOUSE IGI Landscape Urbanism Design client: Glasgow City Council / GCVGNP Strategy team: ERZ & Enviro-centre (ecology / hydrology)

  24. HYDROLOGY: CATCHMENTS Landscape Urbanism Design Strategy

  25. GREEN NETWORK: BREAKS Landscape Urbanism Design Strategy

  26. WIDER GREEN NETWORK: Glasgow Strathkelvin Railway Path to Kirkintilloch Bishopbriggs Glasgow to Cumbernauld Glenboig Gartcosh Ruchazie Cranhill Airdire Blairtummock NCR 75 Bargeddie Rutherglen 5 R 7 C N 1km Coatbridge 7 Lochs Cycle Link Glasgow Coatbridge 0km 16km Glasgow Coatbridge NCR 75 Landscape Urbanism 0km 24km Design Strategy

  27. STRATEGY: Landscape Urbanism Design Strategy

  28. DETAIL AREAS: Landscape Urbanism Design Strategy

  29. INTEGRATED GREEN INFRASTRUCTURE STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI IN AREAS OF ANTICIPATED CHANGE PLANNING / DESIGN GUIDANCE CREATES COMMON PLATFORM OF UNDERSTANDING FOR ALL PARTIES NEED TO EMBED IN STATUTORY PROCESSES Landscape Urbanism Design Strategy

  30. INTEGRATED GREEN INFRASTRUCTURE MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK Landscape Urbanism Design Strategy

  31. FORESTERHILL CAMPUS Landscape Urbanism Design client: NHS Grampian / Green Exercise Partnership Strategy team: ERZ & Enviro-centre (ecology / hydrology)

  32. FORESTERHILL: 1944 Landscape Urbanism Design Strategy

  33. EXISTING: ROADS / PARKING Landscape Urbanism Design Strategy

  34. FORESTERHILL GI MASTER PLAN Landscape Urbanism Design Strategy

  35. FORESTERHILL CAMPUS Landscape Urbanism Design Strategy

  36. FORESTERHILL CAMPUS Landscape Urbanism Design Strategy

  37. HALFWAY PARK Landscape Urbanism Design Strategy client: Southside Housing Association

  38. HALFWAY PARK All dimensions are to be verified on Landscape Urbanism Design Strategy

  39. MGP 2014: CAMLACHIE Landscape Urbanism client: Design West of Scotland Housing Association / Strategy Glasgow City Council / CSGN

  40. MGP 2014: CAMLACHIE Landscape Urbanism Design Strategy

  41. MGP 2014: CAMLACHIE Landscape Urbanism Design Strategy

  42. MGP 2014: CAMLACHIE Landscape Urbanism Design Strategy

  43. MGP 2014: CAMLACHIE Landscape Urbanism Design Strategy

  44. INTEGRATED GREEN INFRASTRUCTURE MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK PROBLEM SOLVING INTERVENTIONS DRIVEN BY NEED FOR CHANGE SEEK BETTER BALANCE OF ‘SYSTEMS’ IN BUILT ENVIRONMENT Landscape Urbanism Design Strategy

  45. HABITAT NETWORKS ACCESS NETWORKS GREEN / OPEN SPACE WATER MANAGEMENT ROADS / TRANSPORT BUILT DEVELOPMENT Strategy Design Urbanism Landscape

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend