Indonesias Preparation for WRC-19 ITU International Satellite - - PowerPoint PPT Presentation

indonesia s preparation for wrc 19
SMART_READER_LITE
LIVE PREVIEW

Indonesias Preparation for WRC-19 ITU International Satellite - - PowerPoint PPT Presentation

Indonesias Preparation for WRC-19 ITU International Satellite Symposium 2016 Bali, Indonesia, 7 September 2016 Ministry of Communication and Information Technology Republic of Indonesia World Radiocommunication Conference (WRC) World


slide-1
SLIDE 1

Indonesia’s Preparation for WRC-19

ITU International Satellite Symposium 2016 Bali, Indonesia, 7 September 2016

Ministry of Communication and Information Technology Republic of Indonesia

slide-2
SLIDE 2

World Radiocommunication Conference (WRC)

  • World Radiocommunication Conference

(WRC) are held every four years.

  • The purpose of WRC are to review, and, if

necessary, revise the Radio Regulations, the international treaty governing the use of the radio-frequency spectrum and the geostationary-satellite and non- geostationary-satellite orbits.

WRC-15 2-27 November 2015 WRC-15 2-27 November 2015 WRC-19 28 October – 22 November 2019 WRC-19 28 October – 22 November 2019

slide-3
SLIDE 3

Agenda Items of WRC-19

Ch 1. Land Mobile and Fixed Services 1.11, 1.12, 1.14, 1.15 Ch 2. Broadband applications in the Mobile service 1.13, 1.16, 9.1.1, 9.1.5, 9.1.8 Ch 3. Satellite services 1.4, 1.5, 1.6, 7, 9.1.2, 9.1.3, 9.1.9 Ch 6. General Issues 2, 4, 9.1.6, 9.1.7, 10 Ch 4. Science Services 1.2, 1.3, 1.7 Ch 5. Maritime, aeronautical and amateur services 1.1, 1.8, 1.9.1, 1.9.2, 1.10, 9.1.4

WRC-19 WRC-19

  • Resolution 809 (WRC-15): Agenda for WRC-19
  • Agenda items of WRC-19

– Specific: 17 agenda (1.1 to 1.16) – Standing: 11 agenda (2 to 10)

  • CPM19-1 (30 Nov-1 Dec 2015) has agreed on the structure of CPM Report
slide-4
SLIDE 4

Timeline toward WRC-19

Jan Feb 10-20 Jun Jul/Aug Sep 21-25 Oct 28 Oct- 22 Nov APG19-4 CPM19-2 Council 2019 APG19-5 3rd ITU RA-19 WRC-19 [before Council] 18-27 Apr Jul/Aug RAG-25 Council 2018 APG19-3 Jul Nov APG19-2 25-27 Apr RAG-24 26-28 Jul APG19-1 2-27 Nov 30 Nov- 1 Dec WRC-15 CPM19-1

2015 2016

Feb-Jun Sep-Nov 1st round of ITU-R Study Groups Meetings 2nd round of ITU-R Study Groups Meetings

2017

Feb-Jun Sep-Nov 1st round of ITU-R Study Groups Meetings 2nd round of ITU-R Study Groups Meetings 1st ITU Inter- regional Workshop on WRC-19 Prep.

2019 2018

Jan-Jul Sep-Nov 1st round of ITU-R Study Groups Meetings 2nd round of ITU-R Study Groups Meetings Oct/Nov/Dec

  • PP-18
  • 2nd ITU Inter-regional Workshop on WRC-19 Prep.

Source: Doc APG19-1/OUT-02 (Rev.1)

slide-5
SLIDE 5

Indonesia’s Considerations on Agenda Item 1.4

to consider the results of studies in accordance with Resolution 557 (WRC-15), and review, and revise if necessary, the limitations mentioned in Annex 7 to Appendix 30 (Rev.WRC-15), while ensuring the protection of, and without imposing additional constraints on, assignments in the Plan and the List and the future development of the broadcasting-satellite service within the Plan, and existing and planned fixed- satellite service networks

  • In accordance with AP30, the BSS

planned allotment for Indonesia are in 80.2E dan 104.0E.

  • Any changes to the Annex 7 of

AP30 shall ensure the protection and without any additional contraint to the existing and future use of planne band

  • In accordance with AP30, the BSS

planned allotment for Indonesia are in 80.2E dan 104.0E.

  • Any changes to the Annex 7 of

AP30 shall ensure the protection and without any additional contraint to the existing and future use of planne band Considerations Considerations

slide-6
SLIDE 6

Indonesia’s Consideration on Agenda Item 1.6

to consider the development of a regulatory framework for non-GSO FSS satellite systems that may operate in the frequency bands 37.5-39.5 GHz (space-to-Earth), 39.5-42.5 GHz (space-to-Earth), 47.2- 50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to- space), in accordance with Resolution 159 (WRC-15)

  • Currently, no Indonesian

satellite networks submitted to ITU in 37.5-39.5 GHz, 39.5- 42.5 GHz, 47.2-50.2 GHz and 50.1-51.4 GHz frequency bands

  • There is plan to use the

frequency band 37-39.5 GHz for microwave link in Indonesia.

  • Indonesia will follow the

development of study in ITU

  • Currently, no Indonesian

satellite networks submitted to ITU in 37.5-39.5 GHz, 39.5- 42.5 GHz, 47.2-50.2 GHz and 50.1-51.4 GHz frequency bands

  • There is plan to use the

frequency band 37-39.5 GHz for microwave link in Indonesia.

  • Indonesia will follow the

development of study in ITU Consideration Consideration

slide-7
SLIDE 7

Indonesia’s Consideration on Agenda Item 9.1 Issue 9.1.3

Study of technical and operational issues and regulatory provisions for new non-geostationary-satellite orbit systems in the 3 700-4 200 MHz, 4 500-4 800 MHz, 5 925-6 425 MHz and 6 725-7 025 MHz frequency bands allocated to the fixed-satellite service

  • In Indonesia, 3700-4200 MHz and 5925-6425 MHz frequency bands are used

for FSS using GSO satellite

  • There is plan to use the 4500-4800 MHz and 6725-7025 MHz frequency bands

for FSS planned band

  • The study shall ensure the protection of the existing and future use of GSO

satellite in C band

  • In Indonesia, 3700-4200 MHz and 5925-6425 MHz frequency bands are used

for FSS using GSO satellite

  • There is plan to use the 4500-4800 MHz and 6725-7025 MHz frequency bands

for FSS planned band

  • The study shall ensure the protection of the existing and future use of GSO

satellite in C band Consideration Consideration

slide-8
SLIDE 8

Lessons learned from WRC-15 for WRC-19 preparation

Following and attending, if possible, all of the WP meetings will help the administrations to understand the development

  • f the study on agenda items

Following and attending, if possible, all of the WP meetings will help the administrations to understand the development

  • f the study on agenda items

Attending the 2nd CPM meeting will give better understanding of the situation during disussion and the content of CPM Report Attending the 2nd CPM meeting will give better understanding of the situation during disussion and the content of CPM Report Submit the proposal for agenda items in WP, the 2nd CPM, and regional group preparation meetings Submit the proposal for agenda items in WP, the 2nd CPM, and regional group preparation meetings Cooperate together with other administrations and stakeholders Cooperate together with other administrations and stakeholders Keep the concensus spirit during the discussion Keep the concensus spirit during the discussion

slide-9
SLIDE 9

Thank you

fahmi@postel.go.id