ieee pes substations committee annual meeting montreal
play

IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - - PowerPoint PPT Presentation

IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010 2010 Substations Committee Status Report 1 SUBSTATIONS COMMITTEE OFFICERS (2009 2010) Chair Hermann J. Koch Siemens Vice Chair John D. Randolph Pacific


  1. IEEE PES SUBSTATIONS COMMITTEE ANNUAL MEETING MONTREAL May 17 - 20, 2010 2010 Substations Committee Status Report 1

  2. SUBSTATIONS COMMITTEE OFFICERS (2009 – 2010) � Chair Hermann J. Koch Siemens � Vice Chair John D. Randolph Pacific Gas and Electric � Secretary Mike Dood Schweitzer Engineering Laboratories These are the only persons who have to respond to IEEE regarding the L50-S annual financial report. 2010 Substations Committee Status Report 2

  3. NEW SUBSTATIONS COMMITTEE OFFICER in 2010 Secretary for 2011-2012 � Mark Etter ABB Inc. 3 Independence Way Suite 206 Princeton, NJ 08540 tel (732) 932-6250 fax (732) 932-6272 markus.etter@us.abb.com 2010 Substations Committee Status Report 3

  4. SUBSTATIONS COMMITTEE PAST CHAIRMEN � Past Chair R. S. (Bob) Nowell Georgia Power Company � Past 2 Chair Hanna E. Abdalla Power Engineers � Past 3 Chair A. P. (Sakis) Meliopoulos Georgia Tech � Past 4 Chair John D. McDonald GE Energy (IEEE Division VII Director) 2010 Substations Committee Status Report 4

  5. POWER & ENERGY SOCIETY COMMITTEE REPRESENTATION John McDonald Power & Energy Editorial Board R. S. (Bob) Nowell Technical Council Organization and Procedures Committee George Karady Transactions on Power Delivery Editorial Board John Randolph Technical Council Technical Sessions Committee Hubert Bilodeau Technical Council Awards Committee PES Awards Committee 2010 Substations Committee Status Report 5

  6. POWER & ENERGY SOCIETY COMMITTEE REPRESENTATION .... continued Hamid Sharifnia Technical Council Standards Coordinating Committee Wayne Litzenberger Representation to Emerging Technologies Jack Christofersen Gary Engmann Bruce Dietzman Ken White C2 National Electrical Safety Code Subcommittee 3 - Electric Supply Stations Hanna E. Abdallah US National Committee of CIGRE Study Committee B3- Substations 2010 Substations Committee Status Report 6

  7. 2010 IEEE-SA APPOINTMENTS � IEEE-SA Review Committee (Rev Com) � IEEE-SA Audit Committee (Aud Com) � IEEE Standards Board Sam Sciacca CEO CG Automation 92 Cogwheel Lane Seymour, CT 06483 203-888-3002 ext 301 203-888-7640 (fax) samuel.sciacca@cgglobal.com 2010 Substations Committee Status Report 7

  8. WEB SITE http://ewh.ieee.org/cmte/substations/ Webmaster: Chuck Haahr chaahr@segainc.com 2010 Substations Committee Status Report 8

  9. SUBSTATIONS SUBCOMMITTEE BROCHURE Updated Status 2010-05-06 2010 Substations Committee Status Report 9

  10. SUBSTATIONS COMMITTEE ORGANIZATION & PROCEDURE MANUAL Content IEEE POWER AND ENERGY SOCIETY 1. INTRODUCTION 2. PURPOSE OF THE ORGANIZATION SUBSTATIONS COMMITTEE AND PROCEDURES MANUAL 3. SCOPE ORGANIZATION AND PROCEDURES MANUAL 4. ORGANIZATION 5. RESPONSIBILITIES Revision: April 2009 6. OFFICERS 7. MEMBERSHIP 8. TRANSACTIONS EDITOR 9. SUBCOMMITTEES 10. WORKING GROUPS 11. MEETINGS 12. VOTE 13. PROCEDURES 14. GENERATION OF IEEE STANDARDS 15. BALLOTING GROUP FOR A STANDARD Has been revised by Bob Nowell and 16. COMMUNICATIONS 17. TASK FORCE, WORKING GROUP, AND will be voted by B0 this meeting! SUBCOMMITTEE PUBLICATIONS 18. INTERPRETATIONS 19. APPEAL 2010 Substations Committee Status Report 10

  11. SUBSTATIONS ORGANIZATION Chair Chair Chair Administrative Administrative Administrative Substations Substations Substations Subcommittee - B0 Subcommittee - B0 Subcommittee - B0 Committee - A0 Committee - A0 Committee - A0 Vice Chair Vice Chair Vice Chair Standards Standards Standards + TCPC + TCPC + TCPC Secretary Secretary Secretary Subcommittee - S0 Subcommittee - S0 Subcommittee - S0 Past Chairs Past Chairs Past Chairs Transaction Transaction Transaction Recognition & Recognition & Recognition & Meetings Meetings Editor Editor Editor Awards Awards Awards Subcommittee - M0 Subcommittee - M0 Subcommittee - H0 Subcommittee - H0 Subcommittee - H0 Data Acquisition, Data Acquisition, Data Acquisition, Data Acquisition, Transmission and Transmission and Transmission and Transmission and Transmission and Transmission and Transmission and Transmission and High Voltage Power High Voltage Power High Voltage Power High Voltage Power Gas Insulated Gas Insulated Gas Insulated Gas Insulated Processing, and Processing, and Processing, and Processing, and Distribution Distribution Distribution Distribution Distribution Distribution Distribution Distribution Electronics Electronics Electronics Electronics Substations Substations Substations Substations Control Systems Control Systems Control Systems Control Systems Substations Substations Substations Substations Stations Stations Stations Stations Subcommittee - K0 Subcommittee - K0 Subcommittee - K0 Subcommittee - K0 Substations Design Substations Design Substations Design Substations Design Subcommittee - C0 Subcommittee - C0 Subcommittee - C0 Subcommittee - C0 Operations Operations Operations Operations Subcommittee - I0 Subcommittee - I0 Subcommittee - I0 Subcommittee - I0 Subcommittee - D0 Subcommittee - D0 Subcommittee - D0 Subcommittee - D0 Subcommittee - E0 Subcommittee - E0 Subcommittee - E0 Subcommittee - E0 Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups Groups 2010 Substations Committee Status Report 11

  12. SUBSTATIONS ADMINISTRATIVE SUBCOMMITTEES Chair B0 - ADMINISTRATIVE SUBCOMMITTEE Hermann Koch � H0 - RECOGNITION & AWARDS Hubert Bilodeau � SUBCOMMITTEE M0 - MEETINGS SUBCOMMITTEE Diane Watkins � S0 - STANDARDS SUBCOMMITTEE Hamid Sharifnia � 2010 Substations Committee Status Report 12

  13. SUBSTATIONS SUBCOMMITTEES Chair C0 - DATA ACQUISITION, PROCESSING, AND Craig Preuss � CONTROL SYSTEMS SUBCOMMITTEE D0 - TRANSMISSION AND DISTRIBUTION Rich Keil � SUBSTATIONS DESIGN SUBCOMMITTEE E0 - TRANSMISSION AND DISTRIBUTION Randy Clelland � SUBSTATIONS OPERATIONS SUBCOMMITTEe I0 - HIGH VOLTAGE POWER ELECTRONICS Chris Horwill � STATIONS SUBCOMMITTEE K0 - GAS INSULATED SUBSTATIONS Arun Arora � SUBCOMMITTEE 2010 Substations Committee Status Report 13

  14. ADMINISTRATIVE SUBCOMMITTEE - B0 WG B2 – LIAISON Arun Arora Report about � C0 to PSCC � I0 to T&D Committee � K0 to Switchgear Committee WG B4 - FELLOW John Tengdin Promote and support nominations for Substations Engineers for IEEE Fellow Member Status 2010 Substations Committee Status Report 14

  15. DATA ACQUISITION, PROCESSING, AND CONTROL SYSTEMS SUBCOMMITTEE - C0 WORKING GROUP C1 - SUBSTATION INTELLIGENT ELECTRONIC Sam Sciacca DEVICES (IED) CYBER SECURITY STANDARDS WORKING GROUP C2 - STANDARD ENVIRON & TESTING John Tengdin REQUIREMENTS FOR COMMUNICATIONS NETWORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C3 - STANDARD FOR SCADA AND AUTOMATION Craig Preuss SYSTEMS WORKING GROUP C4 - TRIAL USE STANDARD FOR CYBER John Tengdin SECURITY OF SERIAL SCADA LINKS AND IEC REMOTE ACCESS WORKING GROUP C5 - STANDARD ELECTRICAL POWER SYSTEM John Tengdin DEVICE FUNCTION NUMBERS AND CONTACT DESIGNATIONS WORKING GROUP C6 - TRIAL USE STANDARD FOR A CRYPTO- Dave Whitehead GRAPHIC PROTOCOL FOR CYBER SECURITY OF SUBSTATION SERIAL LINKS WORKING GROUP C7 - PROFILE FOR PROTECTION AND Tim Tibbals AUTOMATION IEDs 2010 Substations Committee Status Report 15

  16. DATA ACQUISITION, PROCESSING, AND CONTROL SYSTEMS SUBCOMMITTEE - C0 WORKING GROUP C8 - RECOMMENDED PRACTICES FOR Michael Thesing NETWORK COMMUNICATIONS IN A SUBSTATION WORKING GROUP C9 - STANDARD COMMUNICATION DELIVERY John Tengdin TIME PERFORMANCE REQUIREMENTS FOR ELECTRIC POWER SUBSTATION AUTOMATION WORKING GROUP C10 - JOINT C10 AND PSRC H13 WG ON Sam Sciacca REQUIREMENT AND APPLICATION OF THE SUBSTATION CYBER SECURITY WORKING GROUP C11 - RECOMMENDED PRACTICE FOR DATA Lee Smith COMMUNICATIONS BETWEEN RTUs & IEDs IN A SUBSTATION WORKING GROUP C12 - DNP 3.0 STANDARD ENVIRONMENTAL Lee Smith AND TESTING REQUIREMENTS FOR COM-MUNI-CATION NET- WORKING DEVICES IN ELECTRIC POWER SUBSTATIONS WORKING GROUP C13 - STANDARD TEST METHOD OF USE IN THE NN EVALUATION OF MESSAGE COMMUNI-CATIONS BETWEEN INTELLIGENT ELECTRONIC DEVICES IN AN INTEGRATED SUBSTA- TION PROTECTION CONTROL, AND DATA ACQUISITION SYSTEM 2010 Substations Committee Status Report 16

  17. TRANSMISSION AND DISTRIBUTION SUB- STATIONS DESIGN SUBCOMMITTEE - D0 WORKING GROUP D1 - GUIDE FOR RECOMMENDED ELECT CLEAR- Hamid Sharifnia ANCES & INSUL LEVELS IN AIR INSULATED ELECTRIC POWER SUBSTATIONS WORKING GROUP D2 (F2) – GUIDE FOR DESIGN & INSTALLATION Debra Longtin IN CABLE SYSTEMS IN SUBSTATIONS WORKING GROUP D3 - GUIDE FOR THE DESIGN OF SUBSTATIONS Hanna Abdallah BUS STRUCTURES WORKING GROUP D4 (F1) - RECOMMENDED PRACTICES FOR Erik Fujisaki SEISMIC DESIGN OF SUBSTATIONS WORKING GROUP D5 - GUIDE FOR DIRECT LIGHTNING STROKE Bob Nowell SHIELDING OF SUBSTATIONS WORKING GROUP D6 (F0b) – RECOMMENDED PRACTICE FOR THE Jean-B. Dastous DESIGN OF FLEXIBLE BUSWORK LOCATED IN SEISMICALLY ACTIVE AREAS WORKING GROUP D7 - GUIDE FOR SAFETY IN AC SUBSTATION Richard Keil GROUNDING WORKING GROUP D8 - GUIDE FOR DEVELOPMENT OF Arun Arora SPECIFICATIONS FOR TURNKEY SUBSTATION PROJECTS WORKING GROUP D9 - AC/DC SYSTEMS Hanna Abdallah 2010 Substations Committee Status Report 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend