grunen unenwa wald ld science cience
play

Grunen unenwa wald ld Science cience Pres esen enta tatio - PowerPoint PPT Presentation

Grunen unenwa wald ld Science cience Pres esen enta tatio tion O Over erview Building Overview Existing Mechanical System and T d Techno chnolog logy y Geothermal Heat Pump Analysis Sizing Geothermal Wells


  1. Grunen unenwa wald ld Science cience Pres esen enta tatio tion O Over erview � Building Overview � Existing Mechanical System and T d Techno chnolog logy y � Geothermal Heat Pump Analysis � Sizing Geothermal Wells � Construction Bu Building ng � Energy Consumption &Payback � DOAS with Parallel System Analysis � Sizing System Sh Shane ane H Helm � Energy Consumption & Payback � Recommendations Mechanical O Me Option **Architectural Breadth Covered Only in Final Report 1

  2. Ener Energy U Used Pie Charts to Show Geothermal hermal Heat Pum Pumps vs. V s vs. VAV wi V with th � Total Energy Savings were energy was saved � High Efficiency Saves 562,120 kWh each year Chille Ch illers � Regular Efficiency Saves 516,811 kWh each year per specific parts of the Original Design Geothermal High Geothermal Regular � Calculated Payback Periods (VAV) Efficiency Efficiency � High Efficiency- 27.23 years Energy Consumption energy model (Such as 2,962,304 2,400,184 2,445,493 (kWh) � Regular Efficiency- 29.67 years Electricity Cost $138,141 $111,158.38 $113,333.77 Total Saving (Energy) 562,120 kWh 516,811 kWh Pumps, Fans, Cooling, Total Cost Saving per Year $26,982.62 $24,807.23 Payback Period (years) 27.28 29.67 Heating, etc.) 2

  3. Schedule a and Lo Loca cati tion Op Opti timi miza zati tion Heritage Hall Cons nstruction on of of G Geot othermal System Length # of Bore Location of (ft) Bores Depth ft/day day/Bore Days Weeks Drilling Cost Site � Schedule 87458 170 514 900 0.572 97.2 19.4 $329,619.48 N Quad � Dependent on the Bore Hole Depth 87458 210 416 900 0.463 97.2 19.4 $329,619.48 N Quad 87458 250 350 900 0.389 97.2 19.4 $329,619.48 N Quad � Installation of Pipes & Grout 1 week after Drilling 87458 270 324 1200 0.270 72.9 14.6 $216,312.79 N Quad � Not on Critical Path 87458 310 282 1200 0.235 72.9 14.6 $216,312.79 N&S Quad 87458 350 250 1200 0.208 72.9 14.6 $216,312.79 N&S Quad � Total: 15.6 weeks, over Summer Semesters(14 weeks) 87458 380 230 1200 0.192 72.9 14.6 $216,312.79 N&S Quad 87458 390 224 1800 0.125 48.6 9.7 $118,457.00 N&S Quad � Increased Initial Cost by $ 736,019 87458 430 203 1800 0.113 48.6 9.7 $118,457.00 N&S Quad In Initial C Cost Equipment/Material Cost for Location Equipment Cost for Location � Location of Wells Drilling $216,312.79 (2) Centrifugal Chillers $209,244.00 � Lowest Impact on Student Life Grunenwald Science Grout $196,019.48 Cooling Tower $54,000.00 � North Quad and Technology Heat Pumps $448,800.00 Building Piping $78,967.52 Pumps (Hydraulic) $55,389.50 Welding $3,774.10 Initial Cost Increased by $736,019.37 3

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.