Green and Smart PLM for Marine and Plant Industry
25th J 2010 25th June 2010 최 연 식 연구소장 AVEVA Solutions 연구소장 – AVEVA Solutions
Green and Smart PLM for Marine and Plant Industry 25 th J 25 th June - - PowerPoint PPT Presentation
Green and Smart PLM for Marine and Plant Industry 25 th J 25 th June 2010 2010 AVEVA Solutions AVEVA Solutions 1 Presentation Topics - About AVEVA - Commitment C it t - AVEVA NET - Operations, EPC,
1
Green and Smart PLM for Marine and Plant Industry
25th J 2010 25th June 2010 최 연 식 연구소장 AVEVA Solutions 연구소장 – AVEVA Solutions
2
Presentation Topics
3
We are the leading supplier of engineering software We are the leading supplier of engineering software Serving the oil & gas, process, power and marine industries Supporting the full asset lifecycle
Design Build Operate
4
Key dates Established 1960’s CADCentre 1976 released PDMS 1990’s Floated on the stock exchange Renamed AVEVA Increased product portfolio 2000
Acquisitive 2005 Acquired Tribon 2006 Acquired VizStream 2009 Acquisitive 2009 Acquired AVEVA Instrumentation 2010 Acquired Logimatic's MARS 2010 Acquired ADB Oil & Gas business
5
A global company
3 G hi Di i i A global company 3 Geographic Divisions EMEA: HQ Frankfurt , Germany Americas: HQ, Houston, USA A i P ifi HQ K l L Asia Pacific: HQ, Kuala Lumpur Corporate Centre: Cambridge, UK 50 offices in 39 countries 800 staff ~worldwide Americas £ 24.4m +37% EMEA £ 72.6m +23% Asia Pacific £67.1m +32% 1233억원 1340억원 450억원 +37% +32% 총 3023억원 총 3023억원
6
AVEVA NET Commitment
Multiple North Sea and Norwegian Oil & Gas facilities
Engineering and Owner Operators Engineering and Owner Operators
ISO-15926, ISO-10303, AP-203, etc. ISO 15926, ISO 10303, AP 203, etc.
industry and the continual development of a Digital Information Hub. C itt d ith 150 d di t d
professionals
7
Key success factor
8
What drives an Owner/Operator?
9
‘The biggest revenue loss in all plants around the world is actually operator error. y p ‘That is not operators making mistakes; it is operators not having the information at hand to make the right decisions at having the information at hand to make the right decisions at the right time.’
Colin Pearson, ABB Automation I tit t f E i i T h l 20 J 2008 Institute of Engineering Technology 20 June 2008
10
AVEVA NET controls and manages the design information flowing between all of the Design, Procurement, Construction, Commissioning and Data Hand-Over processes Commissioning and Data Hand-Over processes.
11
Suppliers Health & Safety Project Managers Owners Senior Management Designers Sub Contractors Construction Environment
AVEVA NET acts as the bridging together the processes, systems, and resources, which are critical to the on time delivery
Safety Managers Management Contractors
Knowledge Mgmt Change Mgmt S li W kfl & Validati D Over
A i l I f ti M t H b C t t O ti
Change Mgmt Workface Planning Configuration Mgmt Suppliers Partners Sub-Con Security Workflow Collaboration Data Doc. Mgmt Hand-O
A single Information Management Hub – Concept to Operations.
12
AVEVA NET
13
One Platform for Information Management
Construction Plant Owner Supply Chain EPC(s)
14
AVEVA NET is: Portal
15
16
17
Data Capture and Validation
18
Data Capture and Validation Automatic association: Gateways
19
Data Capture and Validation
Validation: Validation:
– Inconsistencies – Missing data U k i f d d i i – User makes informed decisions
20
21
Data and Document Control
y
management all in one place
22
Gateways & Connectors: Engineering Design Tools
23
Gateways & Connectors: Engineering Design Tools
AVEVA Plant / Marine Applications
published from AVEVA Plant / Marine.
Design and Lifecycle processes.
Third party engineering / design / authoring tools
create consolidated data model
relationships, hotspots and hyperlinks
24
25
Enterprise Integration Adaptor
Operations Tools
y g
SOA (Service-Oriented Architecture) SOA (Service Oriented Architecture)
including 2D and 3D visualisation including 2D and 3D visualisation
26
27
P j t D hb d f I f ti Sh i Project Dashboard for Information Sharing
across your project processes y p j p Engineering, Data and Document Management
interlinked
in one place
28
29
30
Engineering Change Management Engineering Change Management
sources, e.g. engineering, procurement, construction
Materials Management
management and ERP systems
31
32
Project Creation j
documents, etc..) C l t j t
Document Creation Document Creation
Templates
33
Integrated Engineering & Design
34
AVEVA NET – Design Connectors
Direct interaction with AVEVA NET from inside of PDMS, AVEVA Marine & MS Office
Publish Structures – Publish Structures – My Tasks – Search – Navigation – Visualisation – Documents – Mark-up – Security Retained Vizstream – Vizstream – view versions – Check-in/out
35
36
AVEVA NET Customers
Regions
Americas 7% Unknown 3%
Regions
Asia EMEA 32% Asia Pacific 58%
37
AVEVA NET – References
25th June 2010 최 연 식 연구소장 AVEVA Solutions 연구소장 – AVEVA Solutions