GAGAN FOR BOBASIO STATES AIRPORTS AUTHORITY OF INDIA GAGAN - - PowerPoint PPT Presentation

gagan for bobasio states
SMART_READER_LITE
LIVE PREVIEW

GAGAN FOR BOBASIO STATES AIRPORTS AUTHORITY OF INDIA GAGAN - - PowerPoint PPT Presentation

GAGAN FOR BOBASIO STATES AIRPORTS AUTHORITY OF INDIA GAGAN DEVELOPMENT Required Navigation Performance (RNP) 0.1 Nautical Mile (RNP 0.1) achieved 14 February 2014 Approach Path with Vertical guidance (APV) 1 is expected soon . GAGAN


slide-1
SLIDE 1

GAGAN FOR BOBASIO STATES

AIRPORTS AUTHORITY OF INDIA

slide-2
SLIDE 2

GAGAN DEVELOPMENT

Required Navigation Performance (RNP) 0.1 Nautical Mile (RNP 0.1) achieved 14 February 2014 Approach Path with Vertical guidance (APV) 1 is expected soon

slide-3
SLIDE 3

.GAGAN DEVELOPMENT

slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
  • Consider the implementation of GAGAN within states of

the Asia Pacific Region where both footprint and service volume can be made available for mutual benefit.

  • Indicate the willingness of the states to use GAGAN

signal-in-space within their area through appropriate study and ensuring installation of basic required ground systems for operations, monitoring and management