FY 2016-2017 COMMUNITY IMPROVEMENT PROGRAM TASK FORCE
JANUARY 23, 2017
NAOMI NARVAIZ, COMMITTEE CHAIR ARTHUR TAYLOR, COMMITTEE CO-CHAIR
FY 2016-2017 C OMMUNITY I MPROVEMENT P ROGRAM T ASK F ORCE J ANUARY - - PowerPoint PPT Presentation
FY 2016-2017 C OMMUNITY I MPROVEMENT P ROGRAM T ASK F ORCE J ANUARY 23, 2017 N AOMI N ARVAIZ , C OMMITTEE C HAIR A RTHUR T AYLOR , C OMMITTEE C O -C HAIR Topics of Discussion History of Facility Needs Timeline Update on the Community
NAOMI NARVAIZ, COMMITTEE CHAIR ARTHUR TAYLOR, COMMITTEE CO-CHAIR
Consultants provided data on existing and future space needs
Report noted that existing City facilities, not including fire and police facilities, were undersized for the current staffing level by 21,000 square feet
26 voting members 4 ex-officio, non-voting members Geographically and demographically representative of San Marcos
Reviewed potential projects Reviewed needs and cost of projects Toured facilities Educated on City’s finances, bond issuance process, and possible
Project Name Capital Costs Ongoing Operating Costs Projected Project Years
Police Facility Renovations $ 5M Possible savings 2017 Public/Community Services Facility Total Cost-$18M , GF portion-$6M TBD-minimal 2017-2018 City Hall Reconstruction Or City Hall Annex Total Cost-$30M, GF portion-$15M Total Cost-$16M, GF portion-$8M Possible savings 2018-2019 Fire Department #2 Relocation from Holland $4.75M TBD-minimal 2018 Fire Training Field $ 2M $50,000 annually 2018 Fire Department Station #8 New Highpointe Trace Subdivision $ 4.5M
Partially funded by developer
$1.4M annually 2021-2022 Fire Department Station #11 New HWY 80 &21 $ 7.1M $1.4M annually TBD Library Expansion $14.5M $500,000 annually 2019-2020 River Ridge Extension to Post Road Total Cost-$10.5M, GF portion-$9.5M None 2020-2022 Victory Gardens Neighborhood Improvement Phase II Total Cost-$10.8M, GF portion-$3.4M None 2020-2022
Project Estimated Total Project Cost Current Estimated General Fund Cost Estimated Annual Operating Expense
Police Facility Renovation $ 5.5M $ 5.5M Public/Community Services Facility $18.0M $ 6.0M City Hall Reconstruction $30.0M $15.0M Fire Station #2 $ 5.2M $ 5.2M Fire Training Field $ 2.0M $ 2.0M $50,000 Fire Station #8 $ 4.5M $ 4.5M $1.4M Library $14.5M $14.5M $500,000
Addition of SWAT storage facility separate from main building
911 Dispatch Center remodel
Perimeter security fencing
New public access point to increase security
Parking lot improvements including drainage improvements and expansion of current lot
HVAC replacement
Additional office and meeting rooms including a larger briefing room and consolidation of functional areas
SWAT vehicles with ballistic resistant glass should not be stored in sunlight
Engine must be special ordered as a low profile vehicle
Engine must have a full water tank to park in station due to clearance limitations
Two additional stations have been recommended on the East side of IH35 for many years
Council negotiated an agreement with the Highpointe/Trace development to fund $2.5M of the cost of a new fire station which includes $500,000 in land
City is required to build the new station within 4 years of the first certificate of
issued by the end of 2017
Station costs include the purchase of an apparatus
Cost also includes annual operating expenses of $1.4M
Residential/high rise live fire training
Rope & trench rescue
Propane props
Vehicle extrication/fire training
Confined space rescue
Apparatus Driver/Operator Course
Fire prevention & education programs
Fire, Police, & EMS integrated response
Project Estimated Total Project Cost Current Estimated General Fund Cost Annual General Fund Debt Service
Police Facility Renovation $ 5.5M $ 5.5M $412,500 Public/Community Services Facility $18.0M $ 6.0M $450,000 City Hall Reconstruction $30.0M $15.0M $1,125,000 Fire Station #2 $ 5.2M $ 5.2M $393,750 Fire Training Field $ 2.0M $ 2.0M $150,000 Fire Station #8 $ 4.5M $ 4.5M $337,500 Library $14.5M $14.5M $1,087,500
Full rate-tax rate increase fully supports the costs of the proposed
Use of Capacity-cost of the debt service and operational cost of the
Project Debt Service- Cents on the Tax Rate FY2018 Operations- Cents on the Tax Rate FY2018 Full Tax Rate Impact Public/Community Services Facility 1.02 1.02 City Hall Reconstruction 2.55 2.55 Police Facility Renovation 0.94 0.94 Fire Station #2 0.90 0.90 Fire Training Field 0.34 0.11 0.45 Fire Station #8 0.77 3.18 3.95 Library 2.47 1.14 3.61
Public/Community Services Facility
Facility would be relocated to a new site outside of downtown
Facility would be funded via existing GF bonding capacity along with funding from the Electric and Water Utilities
Facility would not be part of the May 6, 2017 Bond Election
Existing facility needs are too desperate to risk the failure of a bond election
New City Hall Facility
Facility would be relocated within the existing City Hall site
Facility would be funded via existing GF bonding capacity along with funding from the Electric and Water Utilities
Facility would not be part of the May 6, 2017 Bond Election
Existing facility needs are too desperate to risk the failure of a bond election
Propose Two Bond Propositions for
City Hall Reconstruction and
Pay debt service with existing general
Public Safety Projects and Library 15% of debt service and operating
Project Tax Rate Impact (cents) Proposal Public/Community Services Facility Pay debt service with existing capacity Not Included In Bond Election City Hall Reconstruction Pay debt service with existing capacity Not included in Bond Election Police Facility Renovation 0.80 Proposition #1 Fire Station #2 0.77 Proposition #1 Fire Training Field 0.38 Proposition #1 Fire Station #8 3.35 Proposition #1 Library 3.07 Proposition #2
Election ordinance would be brought back to City Council on