Furness CALC March 2019 Serving the people of Cumbria What We Look After 337Km of Public Highway in Barrow Borough Area 280 linear Km of weed treatment 3 times per year 4000 Street Lights in Barrow Borough Area 13500 Gullies in


  1. Furness CALC March 2019 Serving the people of Cumbria

  2. What We Look After • 337Km of Public Highway in Barrow Borough Area • 280 linear Km of weed treatment 3 times per year • 4000 Street Lights in Barrow Borough Area • 13500 Gullies in Barrow Borough Area alone • Winter Treatment (2600km) Countywide for a full Priority 1 and 2 pre salt Serving the people of Cumbria

  3. Local Committee & Working Groups • Barrow Local Committee Report Monitoring • Executive Decisions • • Barrow Highways Advisory Sub Group Recommend to LC • • CRASH Group • Parish Council Meetings Serving the people of Cumbria

  4. Network Management Oversee all key programmes of work and activity within the relevant service area ensuring projects is delivered on time, on budget and to the agreed standard • Delivery of highway maintenance functions • Act as the single point of contact for the LC • Management responsibility for a team of technical staff covering a wide range of statutory highway functions • To coordinate other area based functions such as traffic management, development management, street works and programme management. Serving the people of Cumbria

  5. Highway Operations • 250 staff • 11 Highway Depots across the County • Up to £100m budget spend • 200 fleet vehicles • 53 newly appointed staff • Health and Safety • Customer Facing/Front line service • Highway Network Maintenance • Resilience • RTC • Winter Maintenance Serving the people of Cumbria

  6. St Stre reet et Lig Light hting ing • Currently look after 4000 street lights in the Borough Area • Ongoing Programme of replacement from High Pressure Sodium to LED • Reduced energy costs and better maintenance life • LED Reduces glare and focuses the light directly on the area to be lit. Serving the people of Cumbria

  7. Winter Maintenance • 30 September to 30 April • 38 Dedicated Gritters • £4.1m budget • 28 Weather Stations • 23,000 tonnes of Salt • 4,000 tonnes of Residence Salt Serving the people of Cumbria

  8. Streetworks • Carry out duties associated with the monitoring of highways work on the public network and all relevant activities undertaken on the highway by external parties • Undertake duties set down within the New Roads and Street Works Act 1991, the – Section 184 – Section 171 – Section 169/172 – Section 139 Serving the people of Cumbria

  9. Development Management • Responsible for responding to planning enquiries and planning applications. • Evaluating and assessing applications and enquires which impact on the County’s highways and transport network, provide formal response on behalf of the Highway Authority and negotiate appropriate mitigating measures, such as financial contributions or infrastructure improvements, as part of the planning process. • Link with local officers explore and ensure planning gain Serving the people of Cumbria

  10. Countryside Access • There are over 7400km of Public Rights of Way within Cumbria made up of Public Footpaths, Public Bridleways and Byways Open to All Traffic. • Ensure that all Public Rights of Way remain in a safe and usable condition • Work with partners such as Natrual England e.g Coastal Path • Regular update provided at Highways Working Group Serving the people of Cumbria

  11. Barrow Capital Scheme Values 2019 20 Value SCHEME NAME Comment 1 Named Scheme Drainage Schemes 30,000 4 Beds 85,000 Surface dressing 3 Named Schemes 110,000 Resurfacing Not included in Dev DFT pothole fund ** 88,000 Capital total PSDP 35,000 Minor Structural Maint – Cway patching 250,000 95,000 Minor Drainage works Serving the people of Cumbria

  12. Barrow Capital Schemes 2019 20 Cont. Scheme Name Value Comment Minor Footway Patching 200,000 Footway Schemes 200,000 3 Named Schemes Road Lighting Column Replacement 100,000 Minor Improvement Schemes 136,000 Minor Traffic Schemes Capital Total for 2019 20 1,241,000 Serving the people of Cumbria

  13. Barrow Rev 2019 20 SCHEME NAME Value Comment Better Highways 370,000 Gully Cleansing 30,000 Verge Maintenance 25,000 Weed Spraying 30,000 Carriageway Markings 10,000 Lighting and Illuminated Signs 199,220 Traffic Signals 50,000 Jubilee Bridge Operations and Maintenance 40,000 Revenue total 754,220 Serving the people of Cumbria

  14. Barrow PRN 2019 20 Value Comment SCHEME NAME Yet to be PRN Surface Dressing Finalised ?????? ????? PRN TOTAL UNKNOWN Serving the people of Cumbria

  15. Barrow Bridges 2019 20 Value Comment SCHEME NAME Jubilee Bridge Maintenance Assumed based on previous years 20,000 Jubilee Bridge, Waterproofing and Spread over 2 years 4,000,000 Painting Project Ph 2 Approx Value Barrow Sea Walls Assumed based on previous years 12,000 Bridges Total 4,032,000 Serving the people of Cumbria

  16. Barrow Totals 19/20 Value Comment Revenue 754,220 NPRN Capital 1,241,000 Bridges and Structures 4,032,000*** PRN Capital TBC TBC TOTAL 6,027,220 Serving the people of Cumbria

  17. Support - HIMS Serving the people of Cumbria

  18. Support Serving the people of Cumbria • HIMS online reporting System • WWW.Cumbria.gov.uk/roads-transport • Cumbria Highways – 0300 303 2992 • Betterhighways.Barrow@cumbria.gov.uk Serving the people of Cumbria

  19. Thank You Serving the people of Cumbria

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.