Fry Creek Restoration & Flood Reduction City of Aberdeen - - PowerPoint PPT Presentation

fry creek restoration flood reduction
SMART_READER_LITE
LIVE PREVIEW

Fry Creek Restoration & Flood Reduction City of Aberdeen - - PowerPoint PPT Presentation

Fry Creek Restoration & Flood Reduction City of Aberdeen Project Partner: City of Hoquiam Funding: Chehalis River Basin Flood Authority Washington Coast Restoration Initiative Design Team: Maul, Foster, & Alongi


slide-1
SLIDE 1

Fry Creek Restoration & Flood Reduction

City of Aberdeen

Project Partner:

  • City of Hoquiam

Funding:

  • Chehalis River Basin Flood Authority
  • Washington Coast Restoration Initiative

Design Team:

  • Maul, Foster, & Alongi
  • Forterra
  • KPFF Consulting Engineers
  • Watershed Science & Engineering
slide-2
SLIDE 2

ABERDEEN HOQUIAM

slide-3
SLIDE 3

ABERDEEN HOQUIAM FRY CREEK

slide-4
SLIDE 4
  • Fry Creek
  • Duffy Creek via piped

connection

  • City stormwater system

Fry Creek Basin

slide-5
SLIDE 5

Conditions in 1893…

slide-6
SLIDE 6

Conditions in 1962…

slide-7
SLIDE 7

Conditions in 2017…

slide-8
SLIDE 8

1962 2017

slide-9
SLIDE 9

TimberWorks Master Plan

slide-10
SLIDE 10

The Vision

  • Reduce

flooding

  • Restore

habitat

  • Improve

public

  • pen space
slide-11
SLIDE 11

Fry Creek Project History

  • Early 2016

Identified in the early stages of the TimberWorks Master Plan

  • 4/2016

Awarded $150K by Flood Authority for design

  • 4/2016

Met Garrett Dalan (The Nature Conservancy) at CBP meeting, learned about WCRI

  • 5/2016

Applied for WCRI funding

  • 9/2016

Ranked by WCRI for 2017-2019 funding

  • 10/2016

Awarded additional $350K by Flood Authority for design

  • 12/2016

Surveying and design began

  • Present

Design underway, $2.215 million in WCRI funding pending passage of a capital budget

slide-12
SLIDE 12

Fry Creek Corridor

  • Urban environment
  • Constricted channel
  • Culvert constrictions
  • Degraded habitat
slide-13
SLIDE 13

Fr Fry Creek I Issue ues: C Constric icted c cha hann nnel, l, c cul ulvert c cons nstric ictio ions ns, de degraded ha habi bitat

slide-14
SLIDE 14

Design Process

  • 1. Surveying & Modeling
  • 2. Advisory Committee & Public Outreach
  • 3. Identification of Options, Preliminary Design, & Phasing Decision
  • 4. Final Design
  • 5. Construct First Phase
  • 6. Construct Future Phases
slide-15
SLIDE 15

Design Process

  • 1. Surveying & Modeling
  • 2. Advisory Committee & Public Outreach
  • 3. Identification of Options, Preliminary Design, & Phasing Decision
  • 4. Final Design

We are here.

  • 5. Construct First Phase
  • 6. Construct Future Phases
slide-16
SLIDE 16
  • 1. Surveying & Modeling
slide-17
SLIDE 17
  • 1. Surveying

& Modeling

slide-18
SLIDE 18
  • 2. Stakeholder & Public Outreach
  • Advisory Committee
  • Grays Harbor PUD
  • WDFW
  • Grays Harbor College Fisheries
  • Grays Harbor Conservation District
  • Property Owner Kathi Hoder
  • Port of Grays Harbor
  • 4/2017 – Initial advisory committee

meeting & public open house

  • 7/2017 – Follow-up advisory

committee meeting & public open house

slide-19
SLIDE 19
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-20
SLIDE 20
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-21
SLIDE 21
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-22
SLIDE 22
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-23
SLIDE 23
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-24
SLIDE 24
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-25
SLIDE 25
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-26
SLIDE 26
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-27
SLIDE 27
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

slide-28
SLIDE 28
  • 3. I

Iden entific ificatio ion o

  • f Optio

ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

BEST OPTION TO:

  • 1. SIGNIFICANTLY REDUCE FLOODING
  • 2. IMPROVE HABITAT
  • 3. IMPROVE PUBLIC SPACE

PLUS IT FITS OUR CONSTRUCTION BUDGET!

slide-29
SLIDE 29

North Shore Levee Coordination: Future Pump Station

slide-30
SLIDE 30

Thank You