fry creek restoration flood reduction
play

Fry Creek Restoration & Flood Reduction City of Aberdeen - PowerPoint PPT Presentation

Fry Creek Restoration & Flood Reduction City of Aberdeen Project Partner: City of Hoquiam Funding: Chehalis River Basin Flood Authority Washington Coast Restoration Initiative Design Team: Maul, Foster, & Alongi


  1. Fry Creek Restoration & Flood Reduction City of Aberdeen Project Partner: City of Hoquiam • Funding: Chehalis River Basin Flood Authority • Washington Coast Restoration Initiative • Design Team: Maul, Foster, & Alongi • Forterra • KPFF Consulting Engineers • Watershed Science & Engineering •

  2. HOQUIAM ABERDEEN

  3. FRY CREEK HOQUIAM ABERDEEN

  4. Fry Creek Basin • Fry Creek • Duffy Creek via piped connection • City stormwater system

  5. Conditions in 1893…

  6. Conditions in 1962…

  7. Conditions in 2017…

  8. 1962 2017

  9. TimberWorks Master Plan

  10. The Vision • Reduce flooding • Restore habitat • Improve public open space

  11. Fry Creek Project History • Early 2016 Identified in the early stages of the TimberWorks Master Plan • 4/2016 Awarded $150K by Flood Authority for design • 4/2016 Met Garrett Dalan (The Nature Conservancy) at CBP meeting, learned about WCRI • 5/2016 Applied for WCRI funding • 9/2016 Ranked by WCRI for 2017-2019 funding • 10/2016 Awarded additional $350K by Flood Authority for design • 12/2016 Surveying and design began • Present Design underway, $2.215 million in WCRI funding pending passage of a capital budget

  12. Fry Creek Corridor • Urban environment • Constricted channel • Culvert constrictions • Degraded habitat

  13. Fr Fry Creek I Issue ues: C Constric icted c cha hann nnel, l, c cul ulvert c cons nstric ictio ions ns, de degraded ha habi bitat

  14. Design Process 1. Surveying & Modeling 2. Advisory Committee & Public Outreach 3. Identification of Options, Preliminary Design, & Phasing Decision 4. Final Design 5. Construct First Phase 6. Construct Future Phases

  15. Design Process 1. Surveying & Modeling 2. Advisory Committee & Public Outreach 3. Identification of Options, Preliminary Design, & Phasing Decision 4. Final Design We are here. 5. Construct First Phase 6. Construct Future Phases

  16. 1. Surveying & Modeling

  17. 1. Surveying & Modeling

  18. 2. Stakeholder & Public Outreach • Advisory Committee • Grays Harbor PUD • WDFW • Grays Harbor College Fisheries • Grays Harbor Conservation District • Property Owner Kathi Hoder • Port of Grays Harbor • 4/2017 – Initial advisory committee meeting & public open house • 7/2017 – Follow-up advisory committee meeting & public open house

  19. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  20. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  21. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  22. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  23. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  24. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  25. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  26. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  27. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion

  28. 3. I Iden entific ificatio ion o of Optio ions, P Prelim elimin inary D Des esig ign, & & Phasin ing D g Dec ecis isio ion BEST OPTION TO: 1. SIGNIFICANTLY REDUCE FLOODING 2. IMPROVE HABITAT 3. IMPROVE PUBLIC SPACE PLUS IT FITS OUR CONSTRUCTION BUDGET!

  29. North Shore Levee Coordination: Future Pump Station

  30. Thank You Kris Koski, PE City Engineer City of Aberdeen (360) 537-3218 kkoski@aberdeenwa.gov

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.