FLORIDA COMMERCE PARK A Golden Opportunity Zone Project PROJECT SUMMARY Florida Commerce Park is a one-hundred acre, fully approved Build-Ready industrial campus strategically located in Southeast Floridas newly incorporated Village of


slide-1
SLIDE 1

FLORIDA COMMERCE PARK

A Golden Opportunity Zone Project

slide-2
SLIDE 2

PROJECT SUMMARY

Florida Commerce Park is a one-hundred acre, fully approved “Build-Ready” industrial campus strategically located in Southeast Florida’s newly incorporated Village of Indiantown.

11/16/2018 **CONFIDENTIAL**

slide-3
SLIDE 3

PHASE ONE

  • Completed October 2018
  • Land acquisition
  • Engineering & design
  • Site plan & platting
  • Entitlements perfected per Planned Unit Development Agreement (PUD)
  • Installed infrastructure includes:
  • Roads

Conservation set-asides

  • Water, sewer, re-use water

Fiber optic & electrical service

  • Master drainage system

Grading and landscaping

  • All municipal, county, and environmental requirements satisfied and certified as

complete

  • Water and sewer infrastructure conveyed to local utility

11/16/2018 **CONFIDENTIAL**

slide-4
SLIDE 4

PHASE TWO

  • Commenced November 2018
  • Design Phase
  • Marketing & tenant acquisition
  • Architectural & engineering for vertical build-out
  • Rail spur engineering and installation
  • Fire flow equipment installation
  • Design of solar roof installation
  • Sequenced vertical construction of 1,261,800 ft2 over 7 structures

11/16/2018 **CONFIDENTIAL**

slide-5
SLIDE 5

OPPORTUNITY ZONE

  • Florida Commerce Park is located wholly within Florida Opportunity Zone Census Tract No. 18.01.
  • Based on available guidance, developer believes acquisition of the project by a Qualified Opportunity

Fund prior to commencement of vertical development constitutes “Original Use” property.

  • Developer is ready and able to consummate a transaction promptly. The property is unencumbered and

all approvals and permits are current.

11/16/2018 **CONFIDENTIAL**

TIMELINE

  • Vertical development can commence approximately 30 days from the date of building permit application

submission to the Village of Indiantown.

  • First occupancy by September 2019.
  • 30 months total time from initial building commencement to final building completion.
slide-6
SLIDE 6

WHY INDIANTOWN?

  • At the crossroads of South Florida, Indiantown is located on State Highway 710 (The

Beeline Highway), a recently improved four lane highway direct to Port of Palm Beach and component of Florida’s Strategic Intermodal System (SIS).

  • 20 minute drive from Indiantown to either Interstate 95 or the Florida Turnpike.
  • 30 minute drive to the Port of Palm Beach.
  • Ft. Lauderdale and Miami are 60 and 90 minutes away, respectively.
  • Three major natural gas pipelines serving the state of Florida converge in Indiantown.
  • Fiber optic regional trunk runs through Indiantown providing high speed data transfer and

communications.

  • Situated inland and insulated from all major coastal weather events.
  • Elevations in Indiantown and at Florida Commerce Park exceed 30’ msl and substantially

eliminate site flooding risk.

  • Major amenities and community services are found in Indiantown.
  • Local workforce is in place.
  • Newly incorporated Village of Indiantown is business-forward and development friendly.

11/16/2018 **CONFIDENTIAL**

slide-7
SLIDE 7

Florida Commerce Park Drivers and Advantages

  • The south Florida industrial real estate market is in severe imbalance as evidenced

by soaring land & lease pricing, historic low vacancy rates and worsening commercial traffic/congestion statistics.

  • A major improvement project currently underway to widen the Panama Canal is

projected to substantially increase ocean cargo traffic to Florida ports, already

  • perating under constrained conditions. Florida Commerce Park’s strategic location,

connected by CSX rail and highway (28 min to Port of Palm Beach, 80 min to Port Everglades and 130 min to Port of Miami, by road) is perfectly situated to address increased warehouse and logistics demand.

  • All infrastructure, site work, and approvals are in place resulting in a development

timeline advantage of between 18 and 24 months compared to other sites.

  • The campus is rail-served by 4,000’ CSX siding. Developers are in active discussion

with CSX and the company is a valuable user referral source.

  • Included in the federally designated Foreign Trade Zone FTZ 135.
  • Included in SBA Qualified HUBZone, census tract ID 12085001802.

11/16/2018 **CONFIDENTIAL**

slide-8
SLIDE 8

Robust pipeline of prospective tenants-prior to the commencement of developer’s marketing initiative

  • Company PIM in design stage discussions for three buildings on Parcels D, E & F totaling ~

700,000 ft2

  • Company UFP in early stage discussions for three buildings on Parcels D, E & F totaling ~

700,000 ft2

  • Company IMP in early stage discussions for one building on Parcels A & B totaling 267,000 ft2
  • Company NXE in continuing discussions for one building on Parcel C totaling 126,000 ft2

11/16/2018 **CONFIDENTIAL**

slide-9
SLIDE 9

TRANSACTION STRUCTURE OPTIONS

  • Option One
  • Developer sells to Op Fund and exits. Op Fund assumes full control over Phase Two & all aspects
  • f future park management.
  • Deliverables include:
  • Completed Phase One
  • All pipeline deals, resources & conversations
  • Transition consulting
  • Option Two
  • Developer sells to Op Fund and remains as Owner’s Representative/Fee Developer/Property

Manager

  • Assumes responsibility and oversite for Phase Two development
  • Oversite of park marketing function and leasing activities
  • Provides full service, ongoing park management
  • Option Three
  • Developer will consider alternative models proposed by Op Fund

11/16/2018 **CONFIDENTIAL**

slide-10
SLIDE 10

ECONOMIC SYNOPSIS

  • Completed Value of Phase One:

$36.0mm

  • Includes land, entitlements, all horizontal development & Infrastructure
  • Projected Cost of Phase Two:

$118.0mm

  • 1,261,800 ft2 over 7 buildings @ $90 psf (36’ Clear construction standards)
  • Includes provisions for i) CSX rail spur extension, ii) impact fees & iii) private fire flow

system

  • Projected Revenue Model
  • Standard 10 year “NNN” lease
  • Penetration pricing offered in years 1 & 2; market rate in years 3 - 10
  • 2.75% annual escalator
  • CAMS
  • Higher of $2.50 psf or ‘Actual’
  • 2.75% annual escalator

11/16/2018 **CONFIDENTIAL**

slide-11
SLIDE 11

Pro Forma Revenue and Absorption Model

Gross Revenues 2019 2020 2021 2022 2023 2024 2025 2026 Parcel Ft2

(stabilized) (normalized)

Tenant1

F 265,000

574,166.67 $ 1,732,216.67 $ 1,926,191.15 $ 2,293,093.65 $ 2,356,153.73 $ 2,419,301.00 $ 2,485,831.77 $ 2,554,192.15 $

E 229,500

124,312.50 $ 1,495,168.59 $ 1,570,270.38 $ 1,987,283.93 $ 2,041,934.24 $ 2,098,087.43 $ 2,155,784.83 $ 2,215,068.91 $

D 200,700

1,087,125.00 $ 1,334,445.94 $ 1,668,342.27 $ 1,773,661.50 $ 1,822,437.19 $ 1,872,554.21 $ 1,924,049.45 $ Tenant2

A & B 267,000

  • $

1,301,625.00 $ 1,771,294.69 $ 2,175,844.54 $ 2,354,293.34 $ 2,419,036.41 $ 2,485,559.91 $ 2,553,912.81 $ Tenant3

C 126,000

  • $

409,500.00 $ 830,261.25 $ 965,042.86 $ 1,103,530.96 $ 1,133,878.06 $ 1,165,059.71 $ 1,197,098.85 $ Tenant4

G12 & G13 107,500

  • $

174,687.50 $ 703,553.91 $ 770,657.84 $ 935,119.54 $ 960,835.33 $ 987,258.30 $ 1,014,407.90 $ Tenant5

G14 66,100

  • $
  • $

393,845.83 $ 440,480.76 $ 560,263.86 $ 585,459.28 $ 601,559.42 $ 618,102.30 $ Total 698,479.17 $ 6,200,322.76 $ 8,529,863.14 $ 10,300,745.85 $ 11,124,957.16 $ 11,439,034.70 $ 11,753,608.15 $ 12,076,832.38 $

11/16/2018 **CONFIDENTIAL**

slide-12
SLIDE 12

APPENDICES

11/16/2018 **CONFIDENTIAL**

slide-13
SLIDE 13

11/16/2018 **CONFIDENTIAL**

Major Highways Airports

Interstate 95 13 Miles Indiantown Airport 5 Miles Florida Turnpike 14 Miles

  • N. Palm Beach County

10 Miles Highway 70 28 Miles Stuart Airport 25 Miles

Ports

PBI 35 Miles Port of Palm Beach 30 Miles

  • Ft. Lauderdale

80 Miles Port Everglades 80 Miles Miami International 100 Miles Port of Miami 100 Miles Orlando International 140 Miles Tampa International 190 Miles

slide-14
SLIDE 14

11/16/2018 **CONFIDENTIAL**

slide-15
SLIDE 15

11/16/2018 **CONFIDENTIAL**

slide-16
SLIDE 16

FLORIDA COMMERCE PARK IS A DEVELOPMENT PROJECT OF SKYFARM STRATEGIC CAPITAL LLC. ENGINEERING SERVICES ARE PROVIDED BY MELISSA CORBETT P.E. OF THE MILCOR GROUP. THE PROJECT GENERAL CONTRACTOR IS RICK MANCIL, MANCIL’S TRACTOR SERVICE AND THE MARKETING PARTNER IS INDIANTOWN REALTY. THE GUNSTER LAW FIRM SERVES AS LAND USE COUNSEL.

11/16/2018 **CONFIDENTIAL**

Contact: Indiantown Realty 15328 SW Warfield Blvd. Indiantown, FL 34956

772-597-3355

David Powers david@indiantownrealty.com

772-260-0932 (cell)

Kevin Powers kevin@indiantownrealty.com

772-260-6898 (cell) www.floridacommercepark.com