Fall 2019 Capital Improvement Program (CIP) Worksessions Public Facilities and IT Infrastructure November 11, 2019 A GENDA Public Facilities IT Infrastructure 2 N EXT S TEPS This worksession focuses on the State of Good Repair and


slide-1
SLIDE 1

Fall 2019 Capital Improvement Program (CIP) Worksessions

Public Facilities and IT Infrastructure November 11, 2019

slide-2
SLIDE 2

AGENDA

  • Public Facilities
  • IT Infrastructure

2

slide-3
SLIDE 3

NEXT STEPS

  • This worksession focuses on the State of Good

Repair and major projects underway or proposed for Public Facilities and IT Infrastructure

  • During this worksession, consider the following:
  • The capital projects discussed, relative to the overall

affordability of the CIP

  • Alignment of these projects with City Council’s

priorities

3

slide-4
SLIDE 4

IDENTIFIED CITY CAPITAL NEEDS

SUMMARY OF FY 2021 – FY 2030 PROJECT SUBMISSIONS

4

$- $50 $100 $150 $200 $250 $300 $350 $400 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030

Millions

Approved Requests

FY 2021 – FY 2029 Gap between funding requests and funding planned in Approved CIP for City and Schools: $646.7 M

slide-5
SLIDE 5

CIP BUDGET WORK SESSION

Department of General Services November 11, 2019

slide-6
SLIDE 6

City of Alexandria

Strategic Facilities Plan Progress Update

  • Action Items Update
  • State of Good Repair
  • DCHS/Health Consolidation
  • Witter/Wheeler Master Plan
  • City Hall Renovation
  • Fire Station Relocations
slide-7
SLIDE 7

Strategic Plan Action Items

Presented and Approved by Council on December 11, 2018 # Action Item Action Update 1

Collocate DCHS / Health Department / Neighborhood Health locations Identified space at 4850 Mark Center Drive. LOI approved by Council and signed by City

  • Manager. Lease negotiations in process. Awaiting programming/design costs from A/E firms.

2

Develop Witter/Wheeler campus plan Awaiting results from concurrent studies prior to finalization of the Master Plan.

3

Identify & evaluate optimal Fire Station sites Site being identified and vetted by City departments for Fire Stations 205, 207, and for a west end first station (FS 208 now added to list).

4

Evaluate public serving facilities to better align with population growth Develop a high-level strategic plan and location study for the City’s Recreation Centers and Libraries (similar to the Fire Station Optimal Location Study)

5

Explore partnerships with private sector and regional partners Engage the private sector utilizing the PPEA legislation, other public solicitations and through negotiated potentially development partnerships.; Identify community partners (Affordable Housing, Campagna Center)

6

Engage with neighboring jurisdictions Schedule meeting with regional partners to discuss joint facility needs, challenges and best practices

7

Increase City/ACPS dialog regarding facility needs Joint Capital Council created. Joint Facilities Master Planning in process.

8

Develop off-site city-wide storage plan City storage needs being evaluated and identified as feasibility studies are being completed.

9

Continue to evaluate and fund CFMP programs 99% of facility assessments completed. FY 2021 submitted CIP budget to reflect the City’s Strategic goal of State of Good Repair to maintain City facilities at an average 0.40 FCI.

10

Continue evaluation of utilization of City-owned sites Space utilization is being evaluated and addressed as feasibility studies are occurring.

11

Develop short-term and long-term parking solutions Additional Old Town employee parking acquired at Tavern Square. Other parking solutions are being evaluated and identified as projects are developed.

12

Identify additional facilities to offer City services and transactions commonly used that are currently only offered at City Hall. City Hall services are being analyzed as part of the City Hall Visioning Study. Information is being gathered from staff and citizens through focus groups, online questionnaires, and community meetings.

slide-8
SLIDE 8

State of Good Repair

Facility Condition Index (FCI) Deferred Maintenance + Five Years of Future Maintenance Capital Replacement Value (CRV)

4

slide-9
SLIDE 9

State of Good Repair – As of July 30, 2019

Grade F 12% of Facilities Grade D 25% of Facilities Grade C 34% of Facilities Grade B 17% of Facilities Grade A 14% of Facilities

APD Headquarters Duncan Library Chinquapin Rec Center Courthouse City Hall

5

slide-10
SLIDE 10

FY 2021 – FY 2030 Budget Submission

$450.2 Million

Capital Facility Maintenance Projects (CFMPs) $151.8 34% Major Capital Projects $298.4 66%

6

slide-11
SLIDE 11

State of Good Repair

10-Year Funding Level Scenarios

SFP Action Item #9 - Continue to evaluate and fund CFMP programs*

7 $205.5 $238.9 $73.4 $143.5 $157.3 0.32 C 0.28 C 0.49 D 0.40 C 0.38 C 0.1 0.2 0.3 0.4 0.5 0.6 0.7 $0.0 $50.0 $100.0 $150.0 $200.0 $250.0 $300.0 Maintain Current FCI 3% of Current Replacement Value FY2020 Approved Budget FY2021 Submitted Budget Reduce FCI to 40% (Grade C)

Facility Condition Index (FCI) Funding Needed (in Millions) In todays dollars, no inflation

Funding (In Millions) FCI

*Does not include funding for major capital projects or energy.

slide-12
SLIDE 12

FY 2021 – FY 2030 General Services Budget Submission

10-Year CFMP Funding

$28.2 $27.5 $24.6 $16.1 $15.5 $12.4 $10.4 $8.3 $5.0 $3.8 $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 Libraries City Historic Facilities Other Facilities* Recreation Centers Office of the Sheriff Mental Health Facilities Fire & Rescue Energy Courthouse Flora Casey Clinic

Budget Submission (in Millions)

8 *Other facilities include Alexandria Police Department, DASH, Parking Garages, Roofs, and Animal Shelter

slide-13
SLIDE 13

DCHS/Health Consolidation

SFP ACTION ITEM # 1 - COLLOCATE DCHS / HEALTH DEPARTMENT / NEIGHBORHOOD HEALTH LOCATIONS

9

Submitted Budget - $69.2M 4850 50 Ma Mark rk Center er Drive e (I (IDA A Fac acility) ility) sele lect cted ed as as site for co consol nsolidation idation Lett etter er of f Intent ent to le lease ase nego egotiat tiated ed an and sig igned ned Current rrent DCHS CHS le leas ases es renego egotiat tiated ed Pr Project ject Mi Milest lestones

  • nes

➢Programming/Design

  • Spring 2019 – Fall 2021

➢Construction

  • Spring 2022 – Spring 2023

➢Move

  • Summer 2023
slide-14
SLIDE 14

WITTER/WHEELER MASTER PLAN

SFP ACTION ITEM # 2 - DEVELOP WITTER/WHEELER CAMPUS PLAN

slide-15
SLIDE 15

Goals and Initial Findings

  • Many departments can share space
  • Some departments have space that cannot be shared
  • Shared spaces for storage, parking, and training facilities

Maximize sharing of facilities between departments

  • Sites only vehicular connection to the City is Duke Street
  • Additional connections to Witter/Wheeler would increase

efficiency of services and emergency response

  • Opportunities exist to reintroduce the grid and optimize

multi-modal transportation routes Improve inter– and intra-site circulation

  • Some functions need easy public access while other may

need to be restricted

  • Protect City property and equipment from theft and

vandalism Improve security and safety

11

slide-16
SLIDE 16
slide-17
SLIDE 17

Next Steps

Identify Projects

Develop Project Identification Report – Fall 2020

  • Feasibility
  • Cost
  • Operations

Finalize

Finalize Master Plan – Winter 2019/2020 Presentation of findings to City Council – Spring 2020

Master Plan

Incorporate the recommendations from the concurrent studies – Fall/Winter 2019

13

slide-18
SLIDE 18

City Hall Renovation

SFP Action Item #12 - Identify additional facilities to

  • ffer City services and transactions commonly used

that are currently only offered at City Hall.

14

Submitted Budget

  • City Hall Construction - $88.1M
  • City Hall Swing Space - $18.9M
  • Market Square Plaza/Garage - $9M

Visioning Study – Fall/Winter 2019

  • Employee and Community questionnaire completed
  • Two community meetings conducted
  • Refine & Analyze list of possible occupants and uses
  • Draft visioning study report
  • Report findings

Immediate Exterior Repairs – Spring 2020 Programming/Design – Fall 2019 – Summer 2021

  • Develop/Finalize space programming
  • Study and develop swing space
  • Produce design and construction documents
  • Project review and approval

Construction/Building Occupancy – Fall 2021 – Summer 2025

  • Relocate staff to swing space
  • City Hall construction
  • Market Square Garage structural repairs
  • Move staff back to City Hall
slide-19
SLIDE 19

Fire Station Location Study – April 2017

SFP ACTION ITEM # 3 - IDENTIFY & EVALUATE OPTIMAL FIRE STATION SITES

15

slide-20
SLIDE 20

Fire Station Major Capital Projects

16

Fire Station 205 FY 2021 – FY 2023 $23.9M Fire Station 207 FY 2023 – FY 2025 $21.2M West End Fire Station (FS206/FS208) FY 2027 – FY 2029 $30.8M

slide-21
SLIDE 21

Information Technology Services

Council Work Session November 11, 2019 Technology Infrastructure

slide-22
SLIDE 22

ITS Vision and Mission

We are a strategic partner in innovation and continuous improvement through information and technology advancements.

ITS VISION

We enable our partners to better serve the community through meaningful collaboration, communication and information while providing a reliable and secure environment.

ITS MISSION

2

slide-23
SLIDE 23

ITS Core Services

Information Security (Cybersecurity)

3

Infrastructure

Networks (Wired and Wireless) Communications & Collaboration Tools Storage

Data

Enterprise Business Applications Spatial Analysis (GIS) Website

Services

Fiscal/Vendor Management Technical Support (Service Desk) Project Management

slide-24
SLIDE 24

State of Good Repair

4 70% 30% New Initiatives

“Keep the Lights On Activities”

Industry average suggests that 70% of staff time is dedicated to sustainment of current services while 30% is spent delivering new or enhanced services.

Operations

Performing the most value added work that will benefit the City.

slide-25
SLIDE 25

Modernization

5

Stable At Risk

Replacing legacy systems allows the City to stay current with the vendors’ lifecycle and reduces risks. Vendor Supported

High LOW

Enterprise Resource Planning Computerized Maintenance Management System Recreation Database

Time and Attendance

Custom Applications

Courts

Maintenance Cost

Enterprise Applications & Infrastructure

Legacy Infrastructure

slide-26
SLIDE 26

Information Security

6 National Institute of Standards and Technology

slide-27
SLIDE 27

IT/CIP Investments – FY 2020 to FY 2029

7

slide-28
SLIDE 28

Alexandria Justice Integrated System (AJIS)

8

AJIS

Judge’s Chambers Clerk of the Court Common- wealth Attorney Sheriff Police ITS Other Judicial Partners DCHS

slide-29
SLIDE 29

9

Current status

  • Completed third-party

assessment

  • Redesigned web portal
  • Decision to proceed

with Commonwealth of Virginia Case Management System

Alexandria Justice Integrated System (AJIS)

slide-30
SLIDE 30

Next steps are the procurement of

  • Jail Management System
  • Warrant Management System
  • Commonwealth Attorney System
  • Data migration services to State Courts Case

Management System

  • Data warehouse
  • Estimated cost of systems investment and

implementation $12M - $14M

  • 2-3 years replacement process after vendor selection

10

Alexandria Justice Integrated System (AJIS)

slide-31
SLIDE 31

Proposed Municipal Fiber Design

11

slide-32
SLIDE 32

Municipal Fiber Network

12

  • Foundation for future initiatives
  • Connectivity for government

services

  • Potential partnerships with service

providers

  • $10M-$12M to construct (2) 2-inch

conduits

slide-33
SLIDE 33

Digital Government

13

slide-34
SLIDE 34

WRAP-UP

  • What Have We Discussed?
  • Drivers of CIP Investments in Schools, Public

Infrastructure, Public Facilities, and IT Infrastructure

  • Financial Impacts of Supporting Current Level of CIP

Investment

  • Project Submissions for FY 2021 – FY 2030 are

significantly higher than last year’s Approved CIP

  • Were the Capital Investments Outlined by

Departments aligned with City Council’s Priorities?

1

slide-35
SLIDE 35

WRAP-UP

  • Project Submissions for FY 2021 – FY 2030 are

significantly higher than last year’s Approved CIP

  • Gap during FY 2021 – FY 2029, is $646.7 M
  • Proposed CIP will address this gap through a

combination of:

  • Increases in capital investment,
  • Reduction in project submissions, and
  • Changes in project timing and scope.

2

slide-36
SLIDE 36

GUIDING PRINCIPLES FOR PRIORITIZATION

  • Proposed CIP will not be able to fund all project requests,

but will strive to accomplish the following:

  • Address identified Health & Safety Issues
  • Meet capacity needs and maintenance needs of Schools
  • Meet our required contributions to WMATA capital

investment

  • Protect City’s existing assets (State of Good Repair)
  • Invest in service expansions that have an economic

development impact

  • Within these broad categories, urgency and readiness of

projects will also be considered in determining funding levels

3

slide-37
SLIDE 37

NEXT STEPS

  • Staff will continue to refine CIP Project

Submissions for FY 2021 – FY 2030

  • CIP Steering Committee will develop a

recommendation for the FY 2021 – FY 2030 CIP and present to the City Manager

  • City Manager Proposed FY 2021 – FY 2030 CIP

presented to City Council on February 18, 2019

4