fabby tumiwa
play

Fabby Tumiwa Executive Director IESR (Institute for Essential - PowerPoint PPT Presentation

Fabby Tumiwa Executive Director IESR (Institute for Essential Services Reform) | www.iesr.or.id 175 GW 26.8 GW 4,4 GW 2,720 Installed capacity of solar power plant in Indonesia is Lagging Behind 886 438 150 106 60 Source: IRENA


  1. Fabby Tumiwa Executive Director IESR (Institute for Essential Services Reform) | www.iesr.or.id

  2. 175 GW 26.8 GW 4,4 GW

  3. 2,720 Installed capacity of solar power plant in Indonesia is Lagging Behind 886 438 150 106 60 Source: IRENA Statistics 2019

  4. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  5. Pamela Simamora Research Coordinator Renewable Energy and Power System Specialist IESR (Institute for Essential Services Reform) | www.iesr.or.id

  6. Solar modules The decline in solar modules’ price has a significant impact on the massive solar deployment globally Price of solar modules in global market Installed capacity of solar PV in the world IESR (Institute for Essential Services Reform) | www.iesr.or.id

  7. Indonesia faces challenges to achieve its solar energy target • RUEN target: 23% renewable energy by 2025, out of which 6.5 GW comes from solar PV • Solar PV installed capacity in 2018 is still less than 100 MW (90 MW according to MEMR and 60 MW according to IRENA). • PLN’s Business Plan (RUPTL) 2019 -2018 only Solar PV installed targeted 2 GW solar PV by 2028, lower than RUEN target. capacity in Indonesia IESR (Institute for Essential Services Reform) | www.iesr.or.id

  8. Challenges for solar deployment in Indonesia BOOT scheme Risk allocation Unattractive High interest High local content price rate requirement IESR (Institute for Essential Services Reform) | www.iesr.or.id

  9. India Solar irradiation 6-7 kWh/m2/day Annual energy production 1400-1600 kWh/kWp Total installed capacity 24.2 GW On-going project 17.7 GW IESR (Institute for Essential Services Reform) | www.iesr.or.id

  10. India Solar irradiation 6-7 kWh/m2/day Annual energy production 1400-1600 kWh/kWp Total installed capacity 24.2 GW On-going project 17.7 GW Supporting policies for Solar PV Reverse auction, Viability Gap Fund (VGF), Renewable Purchase Obligation (RPO), no tax on transmission, no local content requirement Interest rate 9.55-10.75% IESR (Institute for Essential Services Reform) | www.iesr.or.id

  11. Mexico Solar irradiation 4.6-6.6 kWh/m2/day Annual energy production 1620 kWh/kWp Total installed capacity 3 GW On-going project 1.8 GW IESR (Institute for Essential Services Reform) | www.iesr.or.id

  12. Mexico Solar irradiation 4.6-6.6 kWh/m2/day Annual energy production 1620 kWh/kWp Total installed capacity 3 GW On-going project 1.8 GW Supporting policies for Solar PV Reverse auction, Renewable Purchase Standard (RPS), accelerated depreciation, transmission discount and grid connection, no local content requirement Interest rate 10-11% (local), 3-5% (foreign) IESR (Institute for Essential Services Reform) | www.iesr.or.id

  13. UAE Solar irradiation 6.5 kWh/m2/day Annual energy production 1753 – 2192 kWh/kWp Total installed capacity 487 MW On-going project 2027 MW IESR (Institute for Essential Services Reform) | www.iesr.or.id

  14. UAE Solar irradiation 6.5 kWh/m2/day Annual energy production 1753 – 2192 kWh/kWp Total installed capacity 487 MW On-going project 2027 MW Supporting policies for Solar PV Reverse auction, ease of permit, guarantee of grid connection, no local content requirement, free land Interest rate 2.6-3.6% IESR (Institute for Essential Services Reform) | www.iesr.or.id

  15. Brazil Solar irradiation 4.5-6.3 kWh/m2/day Annual energy production 1230 kWh/kWp Total installed capacity 2056 MW On-going project 2728 MW IESR (Institute for Essential Services Reform) | www.iesr.or.id

  16. Brazil Solar irradiation 4.5-6.3 kWh/m2/day Annual energy production 1230 kWh/kWp Total installed capacity 2056 MW On-going project 2728 MW Supporting policies for Solar PV Reverse auction, discount on transmission and distribution cost, local content policy with soft loan incentive Interest rate 0.9% (BNDES) IESR (Institute for Essential Services Reform) | www.iesr.or.id

  17. Module price is not the only key factor affecting solar generation costs Geographical condition Suitable location, high solar irradiation, ideal temperature and humidity Policies and Regulations Enabling policies and regulations, such as incentives, provision of public land, no or minimum local content Financing scheme and incentives requirement, and suitable procurement model (e.g. auction). Supportive financial incentives (low interest rate and long loan tenor) and de-risking fiscal Project Scale instruments to reduce risk, capital cost, and Economies of scale matter to reduce unit project financing cost of generation and transaction costs. Technology Improved efficiency through research and development IESR (Institute for Essential Services Reform) | www.iesr.or.id

  18. Recommendations for Indonesia S ediakan lahan Adakan A uction Turunkan suku b U nga R elaksasikan TKDN Besarkan skala pro Y ek IESR (Institute for Essential Services Reform) | www.iesr.or.id

  19. Hapsari Damayanti Program Officer Sustainable Energy Access IESR (Institute for Essential Services Reform) | www.iesr.or.id

  20. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  21. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  22. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  23. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  24. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  25. Marlistya Citraningrum Program Manager Sustainable Energy Access IESR (Institute for Essential Services Reform) | www.iesr.or.id

  26. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  27. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  28. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  29. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  30. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  31. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  32. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  33. Agus Tampubolon Researcher Power System & Energy Management Specialist IESR (Institute for Essential Services Reform) | www.iesr.or.id

  34. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  35. Shopping Mall Ministry Hospital University Government Building IESR (Institute for Essential Services Reform) | www.iesr.or.id

  36. 35.579 kWp Shopping Mall Hospital University Government Building Hotel School IESR (Institute for Essential Services Reform) | www.iesr.or.id

  37. Rooftop solar potential sumber: solargis IESR (Institute for Essential Services Reform) | www.iesr.or.id

  38. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  39. Rooftop solar With this big potential, it is possible to electrify cities in Indonesia with rooftop solar. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  40. IESR (Institute for Essential Services Reform) | www.iesr.or.id

  41. IESR (Institute for Essential Services Reform) | www.iesr.or.id

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend