Fabby Tumiwa Executive Director IESR (Institute for Essential Services Reform) | www.iesr.or.id 175 GW 26.8 GW 4,4 GW 2,720 Installed capacity of solar power plant in Indonesia is Lagging Behind 886 438 150 106 60 Source: IRENA
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Executive Director
Fabby Tumiwa
175 GW 26.8 GW 4,4 GW
Installed capacity of solar power plant in Indonesia is
Lagging Behind
60 106 150 438 886 2,720
Source: IRENA Statistics 2019
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Research Coordinator Renewable Energy and Power System Specialist
Pamela Simamora
IESR (Institute for Essential Services Reform) | www.iesr.or.id
The decline in solar modules’ price has a significant impact on the massive solar deployment globally
Price of solar modules in global market Installed capacity of solar PV in the world
Solar modules
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Indonesia faces challenges to achieve its solar energy target
- RUEN target: 23% renewable energy by 2025,
- ut of which 6.5 GW comes from solar PV
- Solar PV installed capacity in 2018 is still less
than 100 MW (90 MW according to MEMR and 60 MW according to IRENA).
- PLN’s Business Plan (RUPTL) 2019-2018 only
targeted 2 GW solar PV by 2028, lower than RUEN target.
capacity in Indonesia
Solar PV installed
IESR (Institute for Essential Services Reform) | www.iesr.or.id
for solar deployment in Indonesia
High local content requirement Unattractive price BOOT scheme High interest rate Risk allocation
Challenges
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Solar irradiation 6-7 kWh/m2/day Annual energy production 1400-1600 kWh/kWp Total installed capacity 24.2 GW On-going project 17.7 GW
India
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Supporting policies for Solar PV
Reverse auction, Viability Gap Fund (VGF), Renewable Purchase Obligation (RPO), no tax
- n transmission, no local content requirement
Interest rate
9.55-10.75%
Solar irradiation 6-7 kWh/m2/day Annual energy production 1400-1600 kWh/kWp Total installed capacity 24.2 GW On-going project 17.7 GW
India
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Solar irradiation 4.6-6.6 kWh/m2/day Annual energy production 1620 kWh/kWp Total installed capacity 3 GW On-going project 1.8 GW
Mexico
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Supporting policies for Solar PV
Reverse auction, Renewable Purchase Standard (RPS), accelerated depreciation, transmission discount and grid connection, no local content requirement
Interest rate
10-11% (local), 3-5% (foreign)
Solar irradiation 4.6-6.6 kWh/m2/day Annual energy production 1620 kWh/kWp Total installed capacity 3 GW On-going project 1.8 GW
Mexico
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Solar irradiation 6.5 kWh/m2/day Annual energy production 1753–2192 kWh/kWp Total installed capacity 487 MW On-going project 2027 MW
UAE
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Supporting policies for Solar PV
Reverse auction, ease of permit, guarantee of grid connection, no local content requirement, free land
Interest rate
2.6-3.6%
Solar irradiation 6.5 kWh/m2/day Annual energy production 1753–2192 kWh/kWp Total installed capacity 487 MW On-going project 2027 MW
UAE
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Solar irradiation 4.5-6.3 kWh/m2/day Annual energy production 1230 kWh/kWp Total installed capacity 2056 MW On-going project 2728 MW
Brazil
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Supporting policies for Solar PV
Reverse auction, discount on transmission and distribution cost, local content policy with soft loan incentive
Interest rate
0.9% (BNDES)
Solar irradiation 4.5-6.3 kWh/m2/day Annual energy production 1230 kWh/kWp Total installed capacity 2056 MW On-going project 2728 MW
Brazil
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Module price is not the only key factor affecting solar generation costs
Geographical condition
Suitable location, high solar irradiation, ideal temperature and humidity
Technology
Improved efficiency through research and development
Financing scheme and incentives
Supportive financial incentives (low interest rate and long loan tenor) and de-risking fiscal instruments to reduce risk, capital cost, and project financing
Policies and Regulations
Enabling policies and regulations, such as incentives, provision of public land, no or minimum local content requirement, and suitable procurement model (e.g. auction).
Project Scale
Economies of scale matter to reduce unit cost of generation and transaction costs.
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Adakan Auction Besarkan skala proYek
Relaksasikan TKDN
Turunkan suku bUnga
Sediakan lahan
Recommendations for Indonesia
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Hapsari Damayanti
Program Officer Sustainable Energy Access
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Marlistya Citraningrum
Program Manager Sustainable Energy Access
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Agus Tampubolon
Researcher Power System & Energy Management Specialist
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Shopping Mall Ministry Hospital University Government Building
IESR (Institute for Essential Services Reform) | www.iesr.or.id
35.579 kWp
Shopping Mall Hospital University Government Building Hotel School
IESR (Institute for Essential Services Reform) | www.iesr.or.id
sumber: solargis
Rooftop solar potential
IESR (Institute for Essential Services Reform) | www.iesr.or.id
IESR (Institute for Essential Services Reform) | www.iesr.or.id
Rooftop solar
With this big potential, it is possible to electrify cities in Indonesia with rooftop solar.