EMERGING HIGH-GRADE MANGANESE OPPORTUNITY
INVESTOR PRESENTATION – MAY 2018
1
EMERGING HIGH-GRADE MANGANESE OPPORTUNITY INVESTOR PRESENTATION - - PowerPoint PPT Presentation
EMERGING HIGH-GRADE MANGANESE OPPORTUNITY INVESTOR PRESENTATION MAY 2018 1 F O R W A R D L O O K I N G - S T A T E M E N T S This presentation contains forward-looking statements and factual information that are current as of the date
INVESTOR PRESENTATION – MAY 2018
1
2
This presentation contains forward-looking statements and factual information that are current as of the date the presentation was originally delivered. When used in this presentation, words such as “may”, “would”, “could”, “will”, “expect”, “anticipate”, “estimate”, “believe”, “contemplate”, “intend”, “budget” “plan” and
include, but are not limited to, statements with respect to the timing and amount of estimated future exploration, success of exploration activities, expenditures, permitting, and requirements for additional capital and access to data. Forward-looking statements involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of Giyani Metals Corp. (the “Company”) to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; the ability to enter into joint ventures or to acquire or dispose of properties; future prices of commodities; fluctuations in currency markets; operating or technical difficulties in relation to the speculative nature of exploration and development; accidents, employee relations (including labour disputes) and other risks of the gold industry; ability to obtain financing; changes in costs and estimates associated with the Company’s projects; legislative, political or economic developments in the jurisdictions in which the Company carries on business; requirements for additional capital; and regulatory restrictions including delays in obtaining governmental approvals. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or expected. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise except as required by applicable law.
L E A D I N G S U P P L I E R O F L O W - C O S T H I G H - G R A D E F E E D S T O C K M A N G A N E S E F O R T H E B A T T E R Y I N D U S T R Y
8 , 1 3 5 S Q U A R E K I L O M E T E R S W H I C H I S L O C A T E D I N T H E K A N Y E B A S I N , S O U T H E A S T E R N B O T S W A N A , A F R I C A . T H E P R O P E R T Y I N C L U D E S S E V E R A L PA S T P R O D U C I N G M A N G A N E S E M I N E S
G E O P H Y S I C A L A N D D R I L L I N G P R O G R A M U N D E R WA Y I N Q 1 / Q 2 2 0 1 8
H I G H - G R A D E M A N G A N E S E O X I D E ( M N O ) U P T O 7 3 . 4 % A T T H E K . H I L L P R O S P E C T A N D U P T O 6 7 . 4 % A T T H E O T S E P R O S P E C T
P I T M I N E A T T H E K . H I L L A N D O T S E P R O S P E C T S
B E N E FA C T I O N P R O C E S S T O B A T T E R Y G R A D E M A N G A N E S E
3
K I L O M E T E R S I N S O U T H E A S T E R N B O T S W A N A
W I T H A P I P E L I N E O F M U LT I P L E P R O J E C T S T O C O L L E C T I V E LY F O R M A L A R G E S C A L E R E S O U R C E
A C C E S S T O G O O D I N F R A S T R U C T U R E , R A I L A N D R O A D S Y S T E M S , W A T E R A N D E L E C T R I C I T Y
S T R A T E G I C A L LY L O C A T E D F O R C O S T E F F E C T I V E S H I P P I N G T O C H I N A A N D I N D I A
S U P P O R T I N G M I N I N G O P E R A T I O N S W I T H FA V O R A B L E TA X R E G U L A T I O N S A N D E F F I C I E N T G O V E R N M E N T P R O C E S S E S
KANYE PROJECT MANGANESE PROSPECT
4
2.3 million tonnes P/A 37% Manganese 2.9 million tonnes P/A 37-55% Manganese 3.8 million tonnes P/A 37-44% Manganese 1.8 million tonnes P/A 33-44% Manganese 2 million tonnes P/A 35-45% Manganese Private company (unknown production
2.5 million tonnes P/A 40% Manganese
ESTIMATED PRODUCTION AND GRADE LEVELS OF SOUTH AFRICAN KALAHARI MANGANESE MINES
Source: Public companies annual reports and third party research.
5
F O R T H E F I R S T T I M E S I N C E 2 0 1 2 , G L O B A L M N O R E D E M A N D W A S L A R G E R T H A N S U P P L Y I N 2 0 1 6 , A S S T O C K S O F O R E A C C U M U L A T E D A L O N G T H E S U P P L Y C H A I N H A V E B E E N C O N S U M E D . M N O R E S U P P L Y C O N T I N U E D C O N T R A C T I N G F O R A S E C O N D C O N S E C U T I V E Y E A R , B Y - 7 % T O 4 4 . 8 M I L L I O N W E T M T , A S M A N Y M I N E S C L O S E D I N 2 0 1 5 R E M A I N E D I D L E D I N 2 0 1 6 . D E M A N D I N C R E A S E D B Y 2 % I N 2 0 1 6 T O 4 7 M I L L I O N W E T M T , O N R I S I N G M N A L L O Y S P R O D U C T I O N , E S P E C I A L L Y I N C H I N A . 6
U P T O 3 5 G I G A W A T T - H O U R S B A T T E R Y P R O D U C T I O N A N N U A L L Y B Y 2 0 1 8
2 0 1 8
C O M P A N I E S A R E A T W O R K O N P L A N S T O P R O D U C E M O R E T H A N 1 2 0 G I G A W A T T - H O U R S O F B A T T E R I E S A Y E A R B Y 2 0 2 1
$ 4 6 . 2 1 B I L L I O N B Y 2 0 2 2 , W I T H A C A G R O F 1 0 . 8 % F R O M 2 0 1 6 T O 2 0 2 2 ( A L L I E D M A R K E T R E S E A R C H )
I S R E Q U I R E D I N T W O O F T H E M O S T P R O M I N E N T B A T T E R Y C A T H O D E C H E M I S T R I E S , N I C K E L - M A N G A N E S E - C O B A L T ( N M C ) A N D L I T H I U M - M A N G A N E S E - O X I D E ( L M O )
B A S E D B A T T E R Y C A T H O D E C H E M I S T R Y I S T H E S T R O N G E S T V I A B L E A L T E R N A T I V E T O C O B A L T B A S E D C A T H O D E C H E M I S T R Y I N C A S E O F C O B A L T S U P P L Y D I S R U P T I O N O R S H O R T A G E
S H O R T A G E O F H I G H G R A D E M A N G A N E S E P R O J E C T S T H A T C A N P R O V I D E F E E D S T O C K T O T H E B A T T E R Y I N D U S T R Y A T C O M P E T I T I V E P R I C I N G 7
AN INVESTMENT PROGRAM OF € 300 MILLION BETWEEN 2017 AND 2019 TO INCREASE ITS PRODUCTION OF NMC (NICKEL-MANGANESE-COBALT) CATHODE MATERIALS FOR LITHIUM-ION RECHARGEABLE BATTERIES.
RECHARGEABLE BATTERIES USED IN VEHICLE ELECTRIFICATION. THE OTHER ONE IS LMO (LITHIUM MANGANESE OXIDE)
INCREASING FAST AND IS OUTPACING THE MARKET BY A SIGNIFICANT MARGIN
OF MANGANESE TO INCREASE BY 100-FOLD
8
S U R F A C E O U T C R O P S O F U N I Q U E H I G H - G R A D E M A N G A N E S E
M A N G A N E S E M I N E D A T K . H I L L 1 9 5 7 - 1 9 6 7 C O N S I S T E D , A L M O S T E N T I R E L Y, O F H I G H - G R A D E M A N G A N E S E O X I D E N O D U L E S
G I Y A N I G E O L O G I C A L T E A M L O C A T E D M U L T I P L E A R E A S W H E R E T H E S E N O D U L E S A R E S T I L L P R E S E N T T O D A Y
K . H I L L W E R E F O R M E D B Y O X I D A T I O N A N D S U P E R G E N E E N R I C H M E N T R E S U L T I N G I N A V E R Y S T A B L E F O R M O F M A N G A N E S E O X I D E (SOURCE: BOTSWANA NOTES AND RECORDS VOL.30)
S T A B I L I T Y O F K . H I L L M A N G A N E S E O R E M A K E S I T C O S T E F F E C T I V E T O S T O R E , A N D T R A N S P O R T
9
MINRALIZED BODY, AND ESTABLISHING VARIATION IN GRADE
ESTIMATE AT K.HILL
FOR EXTRACTION, PROCESS-ABILITY, AND PRODUCTION OF A BATTERY GRADE PRODUCT
10
11
Summary: 3 - 4 weeks planning, contractors admin, logistics and environmental compliances (February) 3 - 4 weeks of ground geophysics and definition of targets for smaller targeted approach to drilling at K.Hill 6 weeks of drilling at K-Hill and Otse Approximately 3 weeks for final analysis and construction of 3d-model and resource Approximately 4 weeks of regional survey and definition of new targets.
March 10 – 31
Program – Geophysics, Target definition and Drill plan
Oversight
June 01 – 30
Geophysics survey and new target generation
May 15 – 30
Specific Gravity
Modelling and Resource Estimation
April 01– May 15
Program – Drilling
Oversight
Logging, Analysis, SG (Data Capture)
February 01 – 28
Technical Design
logistics and Environmental compliance
March 01 – 10
Inspection
Agreemen ts
SOP`s
Blocks for geophysical surveys at K-Hill and Otse. Gravity used to resolve mineralization and plan targeted
K.Hill Otse
12
D A TA , A T A 2 5 0 - M E T E R L I N E S P A C I N G , W A S F I L T E R E D , I M A G E P R O C E S S E D A N D I N V E R T E D
U S E D I N M A P P I N G T H E L O C A T I O N S O F P R O S P E C T I V E G E O L O G Y
M A P P I N G I D E N T I F I E D P R O S P E C T I V E A R E A S F O R M A N G A N E S E
S U R V E Y S W I L L P R O V I D E V A L U A B L E I N F O R M A T I O N T O I D E N T I F Y S U B T L E M A G N E T I C C O N T A C T S W H I C H W I L L A L L O W F O R D E TA I L E D M A P P I N G O F T H E M A N G A N I F E R O U S S H A L E
13
T I M E K I N E M A T I C ( R T K ) S T A T I O N S A N D 1 3 1 0 G R A V I T Y S T A T I O N S C O M P L E T E D O U T O F A T O T A L O F 2 3 4 3 S TAT I O N S *
. 2 6 K I L O M E T R E S O F M A G N E T I C W A L K
I N E S C O M P L E T E D O U T O F 1 2 8 K I L O M E T R E S *
14
Q2 2018 Q3 2018 Q4 2018 Q1 2019
assessment
proto-typing
15
studies
management plan
estimates
diamond drilling program
gravity geophysics
Botswana Namibia Zambia South Africa Botswana GDP from Mining in Billion BWP
12.5 14.6 11.1 11.7 11.2 13.9
JURISDICTIONS IN SOUTHERN AFRICA WITH POLITICAL STABILITY AND TRANSPARENCY
COUNTRIES WITH ACTIVE BLACK ECONOMIC EMPOWERMENT (BEE) REGULATIONS
BOTSWANA
EXONERATION
Angola Madagascar Zimbabwe DR Congo Mozambique Tanzania
2011 2012 2010 2013 2014 2015
16
GRADE
FOR ALL COMMODITIES, GRADE DRIVES THE ECONOMICS IN MINING
SCALE
L A R G E R E S O U R C E S R E S U LT I N L A R G E PRODUCTION VOLUME AND DRIVES LONG TERM REVENUES AND PROFITS
MANAGEMENT
EXPERIENCED MANAGEMENT TEAM ENSURES FULL POTENTIAL IS REALIZED
JURISDICTION
MATURE MINING CULTURE, STABLE POLITICAL SYSTEM, GOOD INFRASTRUCTURE, AND FAVOURABLE TAX REGULATIONS AND BUSINESS ENVIRONMENT
METALLURGY
HIGH-GRADE AND LOW-IMPURITIES RESULT IN COST- EFFECTIVE PROCESSING AND BENEFICIATION
SCALE MANAGEMENT JURISDICTION METALLURGY GRADE
G I Y A N I ’ S K A N Y E M A N G A N E S E P R O J E C T H A S A L L O F T H E A T T R I B U T E S O F A S U C C E S S F U L M I N E 17
T H E B A T T E R Y I N D U S T R Y
O C C U R R E N C E S T H R O U G H O U T G I YA N I ’ S P R O P E R T Y
TA R G E T W I T H S T E E L A N D M E TA L A L L O Y M A K E R S A S A S E C O N D A R Y M A R K E T F O R E X C E S S P R O D U C T I O N
S O U T H A F R I C A ( ~ $ 2 M ) A N D 2 0 % I N T E R E S T I N C A N O E M I N I N G V E N T U R E S C O R P ( ~ $ 1 . 8 M ) *
* A s o f F e b r u a r y . 1 2 . 2 0 1 8
18
R O B I N B I R C H A L L
t h a n e i g h t e e n y e a r s o f experience in the financing and m a n a g e m e n t o f re s o u rc e companies, most recently as the Executive Chairman of Silver Bear Resources and CEO of a private E&P company as well as V.P . Investment and Corporate Banking with BMO Capital
MBA from the University of Cape Town, a Msc in European and International Politics from Edinburgh University, a Première Degré en Langues Literature et Civilisation, from Stendahl Université and a BA from Queens University. W A J D B O U B O U M r. W a j d B o u b o u i s a n experienced executive with a 26- year history of achievements in t h e O i l & G a s a n d Telecommunications industries. S k i l l e d i n O p e r a t i o n s M a n a g e m e n t , P e o p l e a n d Financial Management, Complex Contract Negotiations, and Business Strategy. Mr. Boubou held various leadership positions in multinational conglomerates, including Schlumberger and Cisco
degree in Electrical Engineering and MBA from the University of Strathclyde in the UK. D A N C R A N D A L L
Manager at Marrelli Support Services Inc. possessing over 10 years of experience working with public companies. He specializes in providing Chief Financial Officer, accounting, regulatory compliance, and management advisory services to numerous issuers on the TSX, TSX-Venture, CSE and other international
has an Honours Bachelor of Accounting (Co-op) degree from Brock University. Previously, he was a Manager at Collins Barrow Toronto LLP , a public accounting firm where he worked for over five years. C E O - D I R E C T O R P R E S I D E N T C F O
19
M I C H A E L J O N E S
Mining Engineer who held various mine management roles for 13 years working at Gencor, De Beers, Debswana and as Consulting Mining Engineer for Iscor. D I R E C T O R
E U G E N E L E E
professional with experience in capital markets, financial reporting, risk management, internal controls and corporate governance.
and global thought leader on energy and sustainability
Executive VP of ePower Engine Systems. J O H N P E T E R S E N
global thought leader on energy and sustainability issues. He currently serves as Executive VP of ePower Engine Systems. S C O T T B R E A R D
professional with significant experience in start-ups and
many Fortune 500 companies. D I R E C T O R D I R E C T O R D I R E C T O R D U A N E P A R N H A M C H A I R M A N
successful track-record of developing companies from start-up to fully permitted
maximum shareholder value through extensive experience in c o r p o r a t e g o v e r n a n c e , stakeholder relations and capital markets.
20
TSXV: WDG $21.26 million Symbol Share Price* Basic Shares W arrants Options FD Shares Market Capitalization $0.26 81,779,628 5,531,541 4,900,000 92,211,169
*share price as of April 12, 2018
21
T S X V : W D G
277 Lakeshore Road East Suite 403 Oakville, Ontario, Canada L6J 6J3 289-837-0066 info@giyanimetals.com
G E R M A N Y : A 2 D U U 8
Giyani is a publicly trading, vertically integrated, well managed junior resource company focused on building a superior hybrid mining company to supply raw materials needed for the fast growing global battery technology industry.
www.giyanimetals.com 22
23
24 MANGANESE (MN) ALLOYS SIMN: USED IN REINFORCEMENT BARS AND WIRE MESH DEMAND: ~ 13.2 MILLION MT, SUPPLY: ~ 12.8 MILLION MT HC FEMN: USED IN FLAT AND LONG STEEL PRODUCTS DEMAND: ~ 4.97 MILLION MT, SUPPLY ~ 4.9 MILLION MT RF FEMN: FLAT STAINLESS STEEL, LOW CARBON CRITICAL SURFACE FLAT STEEL DEMAND ~ 1.86 MILLION MT, SUPPLY ~ 1.84 MILLION MT ELECTROLYTIC FLAKE MANGANESE: BATTERIES DEMAND ~ 300 000 MT SUPPLY ~ 275 000 MT
SiMn HCFeMn RFFeMn Flake
SOUTH AFRICA UKRAINE AUSTRALIA INDIA GABON REST OF WORLD GLOBAL MANGANESE RESERVES
Source: US Geological Survey Source: Manganese Investing News
GLOBAL MANGANESE PRODUCTION SHARE
80% 10% 2% 2% 3% 3%
South Africa China Australia Gabon Brazil India Rest Of World
6% 6% 7% 17% 11% 18% 36%
25
HIGH GRADE SOURCES CAN REPLACE LOW GRADE FEED STOCK
26
T H E R E A R E N U M E R O U S L I - I O N B A T T E R Y C H E M I S T R I E S T H A T U S E VA R I O U S B A T T E R Y M E TA L S . G I YA N I I S F O C U S E D O N D E V E L O P I N G M A N G A N E S E S U P P LY.
Lithium Cobalt Oxide
LiMn2O4 LiCoO2
Lithium Nickel Cobalt Aluminum Oxide Lithium Nickel Manganese Cobalt Oxide Lithium Iron Phosphate Lithium Manganese Oxide Lithium Titanate
LiNiMnCoO2 LiFePO4 LiNiCoAlO2 Li4Ti5O12
27
Lithium Manganese Oxide LiMn2O4 (LMO) Lithium Nickel Manganese Cobalt Oxide (NMC) NMC METAL COMPOSITION
33% 4% 1% 61% MANGANESE COBALT NICKEL LITHIUM OTHER
LMO METAL COMPOSITION
33% 7% 20% 20% 19% MANGANESE COBALT NICKEL LITHIUM OTHER 28
G I YA N I ’ S S T R A T E G Y I S T O B E I N T H E S W E E T S P O T O F B E C O M I N G T H E L E A D I N G F E E D S T O C K M A N G A N E S E S U P P L I E R T O T H E M A K E R S O F T H E H I G H E S T C O S T I T E M I N A L I T H I U M - I O N B A T T E R Y, T H E C A T H O D E .
29
SOURCE: KEMETCO RESEARCH
30
31
32
33
34
H I G H G R A D E M I N E R A L I Z E D S H A L E G R A D I N G U P T O 7 3 % M N O A L O N G 5 0 0 M E T E R S S T R I K E L E N G T H W I T H I N A 1 0 - M E T E R - T H I C K , 1 K M X 1 K M E N V E L O P E
35
36
H I G H G R A D E M A N G A N E S E , U P T O 6 7 . 4 % M N O A T T H E O T S E P R O S P E C T , 4 0 K M E A S T O F T H E K . H I L L P R O S P E C T
0-900MM 0-900MM +900MM 0-250MM 75-250MM <0.5-75MM 6-75MM 0.5-6MM <0.5MM <0.5MM
RUN OF MINE FEED LUMPY PRODUCT STOCKPILES FINES PRODUCT STOCKPILE FINES DISCARD MOBILE ROCK BREAKER SECONDARY SCREENING
PRIMARY CRUSHING SCREENING
FINES DISCARD HANDLING PLANT SERVICES MAKE UP WATER RESERVOIR
37