ECE 492 Final Presentation

slide-2
SLIDE 2

Major Highlights

  • Integrated Dynamometer Testing Room using Vehicle Electronics

○ Data Acquisition Software ○ Grounded Low Voltage ■ Breakout Board ■ Safety Loop ○ Tractive System Interface

  • New Motor and Motor Controller

○ Motor: EMRAX 208 ○ Motor Controller: emDrive 500

  • High Voltage Accumulator Management System Prototype

○ Read and record cell voltage and temperature

slide-3
SLIDE 3

Interconnect

  • Mechanical Strain Relief
  • Budget-conscious

connectors

  • High voltage rule compliant

strain relief and grounding

  • Modular panel based wiring

design

  • More standardized wiring

diagrams across subsystems

slide-4
SLIDE 4

Supervisory Control and Data Acquisition (SCADA)

slide-5
SLIDE 5

SCADA Overview

slide-6
SLIDE 6

Grounded Low Voltage (GLV)

Breakout Board (BoB) Safety Loop

slide-7
SLIDE 7

Tractive System Interface (TSI)

  • Pre-Charge / Discharge
  • Firmware

○ Drive states

  • Throttle Plausibility
  • Testing Board
slide-8
SLIDE 8

Tractive System Interface (TSI)

Pre-charge/Discharge Precharge: prevent the system from shoving too much power into the motor at once. Discharge: Discharges the motor controller when TSV is turned off.

slide-9
SLIDE 9

Tractive System Interface (TSI)

Testing Board

  • Throttle plausibility pots
  • Drive states tests
  • Brake Button
slide-10
SLIDE 10

Motor / Motor Controller / Dyno

  • New Motor and Motor Controller
  • Motor: EMRAX 208
  • Motor Controller: emDrive 500
slide-11
SLIDE 11

Cooling

  • Water Cooling the motor controller
  • Quick disconnects added to TSI
  • Sensors

○ Temperature ○ Flow Rate

  • Powered through GLV and TSI
  • VSCADA connectivity
slide-12
SLIDE 12

Cooling

slide-13
SLIDE 13

Tractive System Voltage (TSV)

  • 3 Board Accumulator Management System

○ Cell Manager, Segment Manager, Pack Manager

  • Cell Communication
slide-14
SLIDE 14

Pack Manager

slide-15
SLIDE 15

Budget

slide-16
SLIDE 16

Budget

slide-17
SLIDE 17

Future Project Goals

slide-18
SLIDE 18

Video - https://youtu.be/onvhVwYgqhs

slide-19
SLIDE 19

Questions?