E 86 th Street Safety & Streetscape Improvements/ Madison Avenue - PowerPoint PPT Presentation

E 86 th Street Safety & Streetscape Improvements/ Madison Avenue School Safety Neckdowns Project ID: HWMM008 Community Board 8 Transportation Committee Meeting July 06, 2016 6:30PM Project Data Project ID: HWMM008 Bid Date: April 20,


  1. E 86 th Street Safety & Streetscape Improvements/ Madison Avenue School Safety Neckdowns Project ID: HWMM008 Community Board 8 Transportation Committee Meeting July 06, 2016 6:30PM

  2. Project Data Project ID: HWMM008 Bid Date: April 20, 2015 Registered Date: February 26, 2016 Notice To Proceed: May 16, 2016 Contractor: Triumph Construction Corp. Contract Value: $ 10,556,199.64 Contract Duration: 395 Days Funding sources: Federal/State/NY City Funded Thanksgiving – New Year Holiday Holiday Embargo: 177 E 87 th Street, Suite 300, NY, NY Field Office:

  3. Brief Description of Project • Select Bus Service (M86) Bus Bulbs and Neckdowns • School Safety Neckdowns • Streetscape Improvements • Replacing Water Mains Over 100 Years Old • Utility Upgrades

  4. PROJECT LIMITS E 86 th Street between Park Avenue and 2 nd Avenue • Madison Avenue between E 84 th Street and E 85 th Street •

  5. 12” Water Main Replacement (1 of 3) E 86 th Street between Park Avenue and Lexington Avenue

  6. 12” Water Main Replacement (2 of 3) E 86 th Street between 3 rd Avenue and 2 nd Avenue

  7. 12” Water Main Replacement (3 of 3) Madison Avenue between E 84 th Street and E 85 th Street

  8. Select Bus Service Construction of bus bulbs and neckdowns for M86 bus stops • Reduce pedestrian congestion • Enhance pedestrian safety • Support streetscape improvements

  9. East 86 th Street Bus Bulb and Neckdown Locations

  10. East 86 th Street Bus Bulb and Neckdown Locations

  11. Madison Avenue Neckdown Locations School Safety Measure

  12. Streetscape Improvements

  13. Streetscape Improvements (Typical)

  14. Existing Streetscape (E86 th Street between 3 rd & Lexington Avenues)

  15. Streetscape Improvements (E86 th Street between 3 rd & Lexington Avenues)

  16. Construction Schedule Overview

  17. Phase 1A E 86 th Street between Lexington Avenue & 3 rd Avenue Work Zone

  18. COMMUNITY IMPACTS & WHAT TO EXPECT

  19. COMMUNITY IMPACTS • Pedestrian access will be maintained at all times • Temporary Street closures and/or limited access may be necessary • NYPD traffic agents assigned for traffic control & Uniformed Flag Persons assigned for safe pedestrian movement • R.E. will monitor operations and work within DEP Noise Code regulations • Sidewalk and/or loading dock access from the curb may be temporarily restricted while work is conducted (coordination will be arranged on a case by case basis) • Parking may be temporarily restricted during construction • M86 Select Bus Service Stops may be temporarily relocated • Garbage/Trash pick up may be affected

  20. COMMUNITY IMPACTS CONT’D Water Service Interruptions: • 72-Hour Advance Advisory will be provided, followed by 24 hour confirmation/cancellation notice. • Specific instruction will be provided prior to water shutoff • If your water service is not restored within 3 hours of the indicated time on the Shutoff Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours. • Water Shut-downs are typically scheduled at night. Special Needs: Individuals with special needs should contact the CCL DDC field staff will work specially with those individuals to minimize certain inconveniences Rodent Control: • A rodent survey will be performed prior to construction • Rodent Control Stations will be installed by a professional rodent control contractor

  21. KEEPING YOU INFORMED Amelia Ramos will be the Community Construction Liaison (CCL). She will be responsible for keeping the community informed by: – Being the first point of contact between the project and the community – Identifying, addressing and/or resolving field inquiries & issues as well as any coordination between the project and needs of the affected stakeholders – Providing regular updates/advisories for the community to better plan around construction activities CCL contact information: Name: Amelia Ramos Email: E86StreetCCL@gmail.com 177 E 87 th Street, Suite 300, New York, NY Field Office: Telephone : TBD DDC Website: www.nyc.gov/ddc DDC Video: www.nyc.gov/webuild During Non-Working hours, please call 311 and give the Project ID: HWMM008

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.