DUNE timing system
Stoyan Trilov, University of Bristol Upstream DAQ meeting 29/10/2019
1
DUNE timing system Stoyan Trilov, University of Bristol Upstream - - PowerPoint PPT Presentation
DUNE timing system Stoyan Trilov, University of Bristol Upstream DAQ meeting 29/10/2019 1 Outline ProtoDUNE timing system Plans and activities DUNE timing system Requirements Design On-going activities 29/10/2019 2
Stoyan Trilov, University of Bristol Upstream DAQ meeting 29/10/2019
1
§ ProtoDUNE timing system – Plans and activities § DUNE timing system – Requirements – Design – On-going activities
29/10/2019 2
§ Some testing and characterisation
still to be performed
– Clock alignment using signal delay measurement – Clock characterisation § Production of more timing FMC – Will be used in DAQ kits
29/10/2019 3
§ 𝑃(1 𝑜𝑡) synchronisation within detector module § 𝑃(1 𝑛𝑡) synchronisation between detector modules → SNB trigger § 𝑃(1 𝜈𝑡) absolute accuracy → beam instrumentation sync § Fan-out timing signals to SP detector § Provide timing signal to DP detector White Rabbit network § Timestamp beam instrumentation signals on SPTS clock domain
29/10/2019 4
Single Phase Timing System
§ GPS disciplined oscillator provides 10 MHz clock § Based around a master timing card hosted in a
𝜈TCA crate
§ Clock distributed to 12 fan-out cards using 𝜈TCA
backplane (dual-star topology)
§ Each fan-out card hosts 2 timing FMCs § Each FMC has four optical connectors § 12×2×4 = 96 optical outputs
– 1:8 optical splitters → 96×8 = 768 fibres
§ Develop prototype for ProtoDUNE run 2 (2021)
29/10/2019 5
IEEE1588 (White Rabbit) to Dual Phase GPS Receiver + IEE1588 Grand Master NTP DAQ & Run Control 10 MHz IRIG-B Master Timing Card MCH AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Direct Attach Cable Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) AMC Timing FMC (4x SFP) Timing FMC (4x SFP) uTCA Crate 12 full-height double width AMC Each AMC with two FMCs Setup/Control/Monitoring ( 1 GBit/s ) Experiment Network Direct attach cable to hot-swap system Crates in CUC 1000Base-BX single mode fibre Fibre to hot-swap system 1000Base-BX 1:2 Passive Optical Splitter/ Combiner 1:8 Passive Optical Splitter/ Combiner To timing endpoints29/10/2019 6
Optical to RF RF to Optical Single mode fibre GPS Receiver + PTP Grand Master White Rabbit Timing Network (Dual Phase) IEEE1588 1000Base-BX NTP Single mode fibre (calibrate time delay down shaft) Single Phase Timing System NTP IRIG 10MHz Single Phase/ Dual Phase Cross Check Optical to RF RF to Optical Single mode fibre GPS Receiver + PTP Grand Master Single mode fibre (calibrate time delay down shaft) Single Phase Timing System NTP IRIG 10MHz IEEE1588 1000Base-BX Single Phase/Dual Phase Cross Check Passive Splitter/ Combiner Single mode fiber Single mode fiber 1000Base-BX Passive Splitter/ Combiner x 150 Direct Attach (copper) cables Single Phase Readout Components in CUC Surface Single Phase Readout Components§ ProtoDUNE timing system – Continuing support – Testing of previously untested features, auto-delay align – New batch of timing FMCs § DUNE timing system – Purchase 𝜈TCA crate and FMC carried card (AMC module) – Purchase GPS disciplined oscillator – Prepare prototype for ProtoDUNE run 2 (2021)
29/10/2019 7
https://ohwr.org/project/afc ? Quotations from vendors on-going