dumbo
play

DUMBO 5 0 W a s h i n g t o n S t r e e t , B r o o k l y n , N - PowerPoint PPT Presentation

LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017 DUMBO 5 0 W a s h i n g t o n S t r e e t , B r o o k l y n , N Y 1 1 2 0 1 50 WASHINGTON ST - AERIAL PLAN - SATELLITE 50 WASHINGTON ST - AERIAL PLAN ADDRESS: 50 WASHINGTON STREET BROOKLYN,


  1. LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017 DUMBO 5 0 W a s h i n g t o n S t r e e t , B r o o k l y n , N Y 1 1 2 0 1

  2. 50 WASHINGTON ST - AERIAL PLAN - SATELLITE 50 WASHINGTON ST - AERIAL PLAN ADDRESS: 50 WASHINGTON STREET BROOKLYN, NY 11201 BLOCK: 37 LOT: 1 MAP #: 12D ZONING: M1-2/R8A BLDG NAME: GAIR NO. 6 STYLE: INDUSTRIAL NEO-CLASSICAL CONSTRUCTION: REINFORCED CONCRETE NW CORNER FROM WATER & MAIN NE CORNER FROM WASHINGTON & WATER (NYC DEPARTMENT OF TAXES - 1939) DUMBO L O C A T I O N A N D S I T E C O N T E X T LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  3. EXISTING STOREFRONT - SCOPE OF WORK 1. REMOVE EXISTING SIGNAGE OVER ENTRY DOOR -PATCH AND REPAIR EXISTING STOREFRONT AS REQUIRED DURING REMOVAL 2. REMOVE EXISTING (2) BLADE SIGNS ON EXISTING BUILDING FACADE -PATCH AND REPAIR BUILDING FACADE AS REQUIRED DURING REMOVAL TO MATCH EXISTING CONDITION 3. REMOVE EXISTING SIGNAGE OVER DELIVERY DOOR -PATCH AND REPAIR TRANSOME TO MATCH EXISTING ADJACENT BUILDING FACADE AS REQUIRED. 3 2 2 1 DUMBO E X I S T I N G S T O R E F R O N T - S C O P E O F W O R K LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  4. PROPOSED STOREFRONT - SCOPE OF WORK 1. NEW “FAUX” LOUVER PANEL INSTALLED OVER EXISTING STOREFRONT. -FABRICATED TO MATCH ADJACENT EXISTING LOUVER PROFILE AND COLOR 2. NEW ALUMINUM SIGN BAND WITH HALO-LIT PIN LETTERS. INSTALLED OVER EXISTING STOREFRONT SYSTEM. -FABRICATED TO MATCH EXISTING STOREFRONT FINISH AND COLOR. 3. NEW ILLUMINATED PROJECTING BLADE SIGN. INSTALLED ON EXISTING BULDING FACADE. -PATCH AND REPAIR FACADE AS NECCESSARY TO MATCH EXISTING CONDITION 1 3 2 DUMBO P R O P O S E D S T O R E F R O N T - S C O P E O F W O R K LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  5. A T N I G H T S I G N A G E D U R I N G D A Y DUMBO D E T A I L S : S I G N B A N D + H A L O - L I T L E T T E R S LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  6. A T N I G H T S I G N A G E D U R I N G D A Y DUMBO D E T A I L S : I L L U M I N A T E D B L A D E S I G N LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  7. 5 0 W A S H I N G T O N S T 6 0 W A T E R S T 5 5 W A T E R S T N E O F M A I N S T & F R O N T S T 4 5 W A T E R S T 1 1 7 F R O N T S T DUMBO S I M I L A R S I G N A G E A R O U N D D U M B O LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

  8. DUMBO S W E E T G R E E N S I G N A G E E X A M P L E S LANDMARKS PRESENTATION SET | FEBRUARY 21, 2017

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend