Drilling to Profit with Extended Reach Drilling Technologies Iain - - PowerPoint PPT Presentation

drilling to profit
SMART_READER_LITE
LIVE PREVIEW

Drilling to Profit with Extended Reach Drilling Technologies Iain - - PowerPoint PPT Presentation

Drilling to Profit with Extended Reach Drilling Technologies Iain Hutchison CEng MIMechE www.MerlinERD.com Todays Talk Merlin ERD ERD: Unlocking Opportunities Industry Achievements Fundamentals Hole Cleaning Drilling


slide-1
SLIDE 1

www.MerlinERD.com

Drilling to Profit

with

Extended Reach Drilling Technologies

Iain Hutchison CEng MIMechE

slide-2
SLIDE 2

www.MerlinERD.com

Todays Talk

  • Merlin ERD
  • ERD: Unlocking Opportunities
  • Industry Achievements
  • Fundamentals
  • Hole Cleaning
  • Drilling Loads: Origin & Managing
  • Soft Issues
  • Critical Success Factors
slide-3
SLIDE 3

www.MerlinERD.com

Who is Iain Hutchison?

  • HWU: Mech Eng, CEng (IMechE)
  • 25 yr Drilling Engineer
  • Aberdeen, London, Algeria, Australia
  • Founder & Principle of Merlin
  • Spitfire Pilot

Tell ‘em what it’ll take, not why it won’t work

slide-4
SLIDE 4

www.MerlinERD.com

Who are Merlin ERD?

World Leaders in ERD Engineering Support

  • Independent (no 3rd party revenue)
  • Measured by Results
  • Sakhalin/Qatar/Wytch Farm/Patagonia/ etc
  • 34 personnel (engineers, associates, rig site support, trainers)

Proudly British, Patriotically Scottish, Globally engaged Head office Perth, Scotland Operations worldwide:

(Caribbean to Australasia)

slide-5
SLIDE 5

www.MerlinERD.com

With Who?

slide-6
SLIDE 6

www.MerlinERD.com

Where?

slide-7
SLIDE 7

www.MerlinERD.com

ERD: What Value?

  • 1. Marginal Field Development
slide-8
SLIDE 8

www.MerlinERD.com

Industry Achievements

slide-9
SLIDE 9

www.MerlinERD.com

Industry Achievements

  • ExxonMobil Chayvo & Odoptu Fields, Sakhalin Island

– Z42: 12,700m MD, 2,344m tvd, 11,732m departure, 73 days – Z43: 12,450m MD, – Z44: 12,376m MD – OP11: 12,345m MD, 11,475m departure, 60 days

  • Maersk, Al Shaheen, Qatar :

– BD04A: 36,768 ft (11,207m) departure, 36 days

  • BP, Wytch Farm

– M16z: 35,197 ft departure, 5370ft tvd

  • Total, Patagonia

– Cullen Norte 1: 34,728ft departure, 5434ft tvd Z42: 38,500’ departure 8 of 10 longest wells in Sakhalin!

slide-10
SLIDE 10

www.MerlinERD.com

Limited Rig

Low rig specs can drill big wells

  • Maersk, Al Shaheen, Qatar – STANDARD MENA JACK-UP:

– BD04A: 36,768 ft (11,207m) departure, 36 days

  • Apache, West Cycad, Australia – STANDARD JACK-UP:

– 22,500 ft md, 5200ft tvd, 29 days D&C

  • Exxon, California

– 18,000 with 800 hp rig, 15 years ago!! You don’t need a big rig!

  • Screen the opportunities
  • Identify constraints
  • Engineer feasibility to spec “What it will take”
  • Latest technological innovations, teamwork
slide-11
SLIDE 11

www.MerlinERD.com

Fundamentals

Hole Cleaning

Hole Cleaning

Hole Cleaning

3 Critical Priorities for High Angle Wells

slide-12
SLIDE 12

www.MerlinERD.com

Hole Cleaning Regimes

slide-13
SLIDE 13

www.MerlinERD.com

Drilling Loads

  • BHA & DP weight = > Drag
  • Stiffness?
  • Contact Area? (think 1st principles)
slide-14
SLIDE 14

www.MerlinERD.com

Critical Success Factors

How close to the edge of the cliff are you? How can you tell? Offset Data What is different Modelling (guess) When are extra actions justified? New team Change in design (DP, fluid, inc, azi) Actions prioritised for risks & consequences – No contingencies?

slide-15
SLIDE 15

www.MerlinERD.com

Hole condition Monitoring

slide-16
SLIDE 16

www.MerlinERD.com

Project Ahead & AVOID Problems

slide-17
SLIDE 17

www.MerlinERD.com

` ` ` ` ` ` ` ` ` ` ` ` ` `` ` ` ` ` ` ` ` ` ` ` ` ``` ```` ` ` ` ` ` ` `` `` `` ` `` ` ` ` `` ` ` ` `

Tripping

Tubulars & Hole Size

12” Hole & 9½” BHA 12¼” Hole & 5” DP 8½” Hole & 5” DP

slide-18
SLIDE 18

www.MerlinERD.com

Soft Issues - Risk

Challenge Identified

  • Planned
  • Practiced/Trained
  • De-Risked
slide-19
SLIDE 19

www.MerlinERD.com

Time

Problem

$

Value Lost Value Lost

Do NOT want to repeat!

Problem Cost

slide-20
SLIDE 20

www.MerlinERD.com

Time

Faster

$

Value Added

Want to repeat!

Performance Value

slide-21
SLIDE 21

www.MerlinERD.com

Stealth Fighter

Technology Gotchas

slide-22
SLIDE 22

www.MerlinERD.com

Todays Talk

  • Leverage Experience to D&C 11km wells in 36 days!
  • Screen Opportunities
  • Identify the cliff edge & uncertainties
  • Offset Data quality
  • Design accuracy (loads)
  • All drilling loads can be reduced
  • Latest Technologies – learn from others
  • Teamwork
  • (SS-Drlg-Prod-Mgmnt)

Ask what it will take, don’t accept why it won’t work!

slide-23
SLIDE 23

www.MerlinERD.com

Merlin ERD

  • IADC Manual Update
  • Government ADT Report
  • 3 Day ERD Training
  • Abu Dhabi 03 – 05 March 2015
  • Aberdeen 12 -14 May 2015
  • London 22 – 24 September 2015

Merlin ERD Limited Perth, UK Tel +44 1738 627922 Email: Dolly.Smith@MerlinERD.com www.MerlinERD.com

If we always do what we’ve always done, we’ll only get what we’ve always had!