Miami-Dade MPO FTAC August 10, 2016 | Miami, FL Carlos A. Castro, District Freight Coordinator Dolphin Truck Travel Center (TTC) PD&E (FM #: 437533-1) FDOT Mission, Vision and Values The Department will provide a safe transportation system


slide-1
SLIDE 1

Dolphin Truck Travel Center (TTC) PD&E (FM #: 437533-1)

Miami-Dade MPO FTAC August 10, 2016 | Miami, FL Carlos A. Castro, District Freight Coordinator

slide-2
SLIDE 2

2

The Department will provide a safe transportation system that ensures the mobility

  • f people and goods,

enhances economic

prosperity and

preserves the quality of our environment and communities.

FDOT Mission, Vision and Values

slide-3
SLIDE 3
  • Site Location & Background

Information

  • 2016 Project Development

and Environment (PD&E) Study

  • Project Delivery Approach
  • Q & A
  • Provide an overview of the

project’s background and history

  • Introduce the latest site

concepts

  • Illustrate the project’s freight

benefits / addressing truck parking shortage

  • Explain the project delivery

approach

3

Agenda Goals

Presentation Agenda & Goals

slide-4
SLIDE 4

4

N

Project Location

slide-5
SLIDE 5

Develop Recommended Alternative Layout Developed Recommended Alternative Layout

5

Identified Truck Parking Shortage

2010

Freight Parking Study Recommended Dolphin Site for Further Study

2012

Development

  • f Truck

Parking Facilities Developed Conceptual Layout for Dolphin TTC

2015

PACE Study

2016

Dolphin Station Park-and-Ride PD&E (PEIR)

Ongoing

Dolphin TTC PD&E (SEIR)

Project History

slide-6
SLIDE 6

6

For a new Truck Parking Facility and Park-and-Ride Facility

  • FDOT Study
  • Selected sites prioritized by MPO Truck

Parking studies

  • Site feasibility
  • Develop and evaluate conceptual

alternatives

  • Recommend layout for facilities
  • Explored potential road connection from

NW 12th St to NW 25th St

Planning And Conceptual Engineering (PACE) Study

A A Pl Plan anning ning Le Level el Assessmen Assessment

PACE Study Conceptual Alternative

N

slide-7
SLIDE 7

Purpose: To advance the development of the

Dolphin Truck Travel Center to support freight movement and improve safety.

Addresses Deficiencies in:

  • Truck Parking Shortfall
  • Safety
  • Operations

Key Stakeholders:

  • Miami-Dade County
  • Miami-Dade MPO
  • Freight & Logistics Community

State Environmental Impact Report (SEIR)

7

Project Development & Environment (PD&E) Study

slide-8
SLIDE 8

PD&E Study

8

  • Builds upon PACE Study conceptual

alternative for truck parking facility

‒ Environmental analysis and concept development

  • Considerations

‒ Neighboring property owners ‒ Adjacent Beacon Lakes DRI development ‒ Dolphin Station Park-and-Ride and Dolphin Station Road ‒ Future NW 122nd Ave

County’s Proposed NW 122nd Ave Roadway Platting/ Alignment DRI - Retail

slide-9
SLIDE 9

9

NW 12th St. DRI - Retail

Dolphin Station Park-and-Ride Dolphin TTC Potential NW 122nd Ave Alignment

PD&E

Preliminary Design Concept

slide-10
SLIDE 10

10

PD&E

Recommended Altern rnative Elements

  • 147 Total Parking Spaces

‒ 124 Truck ‒ 12 Tandem Truck ‒ 9 Regular Vehicles ‒ 2 Handicap

  • Maintenance Facility with Static

Scale

  • Truck Wash with Leaky Load

Containment

  • Truck Electrification System
  • Vehicle and Diesel Fuel Pumps
slide-11
SLIDE 11
  • Preliminary Engineering Report (PER) is almost complete
  • Wetlands

‒ One wetland and one Other Surface Water (OSW) were documented ‒ Estimated functional loss from the proposed Build Alternative totals 8.824 UMAM functional units

  • Endangered Species Biological Assessment

‒ No effect on state listed species ‒ May affect, but not likely to adversely affect, several federally listed species

  • Cultural Resources Assessment Survey (CRAS)

‒ No effect on historic properties listed or eligible for listing in the National Register of Historic Places

  • Contamination Screening Evaluation Report (CSER)

‒ Identified: High ranking for no sites, Medium ranking for 3 sites, Low ranking for 3sites, and No ranking for 2 sites

  • Drainage

‒ Requires extensive onsite retention ponds

11

Project Updates

slide-12
SLIDE 12

12

Enhances Mobility

  • Comfort and

Convenience

  • Safety and Security
  • Capacity

Enhances Economic Development

  • Maximizes economic benefit
  • f improved freight mobility
  • Helps address severe truck

parking shortage

  • Benefits nearby industrial

and warehousing businesses

  • Complements other

investments in freight mobility

Project Benefits

slide-13
SLIDE 13

Project Delivery Approach

13

slide-14
SLIDE 14

14

Project Delivery

Pub Publi lic c Priv Private te Par artne tnership ship Design-Build RFP Development Design-Build-Finance-Operate-Maintain RFP Development

Golden Glades MTF FDOT Effort Golden Glades TTC Dolphin TTC FTE Effort

Operations & Maintenance

DTPW Responsibility through MOA with FDOT

Design - Build

Private Sector Partner – Design & Construct Private Sector Partner – Finance FTE/FDOT will lease land to Private Sector Partner

Design - Build

Private Sector Partner – Design & Construct FDOT – Finance

FDOT to lease land to DTPW

FDOT Effort

Dolphin TTC PD&E (SEIR)

Florida’s Turnpike Enterprise (FTE) / FDOT Effort

Golden Glades TTC + MTF PD&E Reevaluation Operations & Maintenance

Private Sector Partner Responsibility

Private Sector Partner will pay FDOT an agreed upon sum

Advertise & Select Private Sector Partner(s)

slide-15
SLIDE 15
  • Leverage State resources to finance, design and build

facility

  • Operator responsible for operations & maintenance

‒ FDOT established performance standards

  • Upgraded level of architecture and landscaping
  • Multiple TTC profit centers

‒ Flexibility for private sector financial feasibility

15

Public Private Partners rship

Goals Goals

slide-16
SLIDE 16

16 16

Phase Calendar Year 2013 2014 2015 2016 2017 2018 2019

Planning (PACE Study) Dolphin TTC PD&E Request for Proposal Development DBFOM Contractor Procurement Design - Build DBFOM Contract Execution

Project Schedule

Public Hearing Project Advertisement (DBFOM)

DBFOM: Design-Build-Finance-Operate-Maintain

slide-17
SLIDE 17

QUESTIONS ?

slide-18
SLIDE 18

Dolphin Truck Travel Center SEIR – Preliminary Design Concept

8/10/2016 - Miami-Dade MPO FTAC

NW 12th St. NW 25th St.