DFL INTERNATIONAL CONTRACTING AND CONSUL TING L TD
2015 Presentation
DFL INTERNATIONAL CONTRACTING AND CONSUL TING L TD 2015 - - PowerPoint PPT Presentation
DFL INTERNATIONAL CONTRACTING AND CONSUL TING L TD 2015 Presentation Introduction Safety Moment Company is a consortium of multiple consulting companies with experts in the fields. Major Shareholders are active and on the projects
2015 Presentation
with experts in the fields.
Procurement, Construction, Commissioning, and Maintenance
corporate tools and procedures tailored and scaled accordingly
personnel
available to shift projects into the right track
Team is experience in executing:
required
specific activities and conditions
requirements part of the execution plan
Procedures, Safety Plans and Other Guides for success
Controls
implemented in the work-face planning guaranteeing success
procedures and processes are tailored and implemented for the project
the project tools and systems to ensure alignment
ensuring alignment with expectations at all times
procedures to ensure successful criteria are achieved weekly
and client priorities for efficient cost, schedule and turn-over
Functional Module
Cost Capture Document Control Estimates and Budgeting Progressing Planning Safety Module Quality Module Material Management Equipment Management Client management System Turnover
completion
be aligned with any project
Level 0 Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7 Level 8
Project #
Project Phase Client Code Execution Phase Site Area Site Sub-Area Discipline FIWP Activity
3 Digits
3 Digits 2 Digits 3 Digits 3 Digits 2 Digits 2 Digits 4 Digits 4 Digits
project easily accessible and organized
basis for Estimation procedures- Estimate Classes as follow
Field Installation work Packages (FIWP)
Area or Scopes aligned with the project objectives
sign-off sheets
stages:
specific CPM method and baseline is set once approved
each activity prior to approval
Progress
improvement targets set weekly
analysis and improvement planning
key successes / lessons learned for continuous improvement
systems
Engineering issues, RFIs, Decision Logs, Commodity Curves and other tools required by the project to ensure clear understanding of project development
control process
early in the project
identified
(FIWPs, RFIs, TDRs, etc…)
conducted weekly to ensure change risk is mitigated
and templates are part of DFL’s standard processes
Trades and CLAC contractors
have specific team members for every position
as part of DFL’s partnership with www.tradescraft.com
a button
foreign workers if needed (following the government rules)
efficient workers are on-boarded
benchmarking using historical figures)
Baselines using MPS and Primavera P6
claims