A u g u s t , 2 0 1 8
DEVELOPING GOLD PROJECTS DEVELOPING GOLD PROJECTS IN THE PROLIFIC - - PowerPoint PPT Presentation
DEVELOPING GOLD PROJECTS DEVELOPING GOLD PROJECTS IN THE PROLIFIC - - PowerPoint PPT Presentation
T SX Ven t ur e - C BI A u g u s t , 2 0 1 8 DEVELOPING GOLD PROJECTS DEVELOPING GOLD PROJECTS IN THE PROLIFIC SONORA GOLD BELT - ME XICO IN THE PROLIFIC SONORA GOLD BELT - ME XICO Forward Looking Statements Forward Looking Statements This
Forward Looking Statements Forward Looking Statements
This presentation is strictly confidential and must not be copied, distributed, circulated or disseminated without the express written consent of the Corporation. This presentation does not constitute an “offering memorandum” as such term is defined under Canadian securities legislation and confers no statutory, contractual or other similar rights of rescission or other action or remedy to any recipient under securities legislation in Canada, the United States or other jurisdiction for misrepresentation or otherwise. No securities are being offered for sale hereunder. This document does not provide full disclosure of all material facts relating to the securities offered. Readers must conduct their own analysis and review of the Corporation and of the information contained in this presentation and must contact their own professional advisors. This presentation contains “forward-looking information”. Forward-looking information includes, without limitation, statements regarding macroeconomic factors, future demand and supply dynamics for lithium, production and development forecasts and timelines, mineral resource estimates, future lithium prices, solutions to past problems, valuations, capital and operating expenditures, ability to obtain financing, currency exchange rates, government regulation of mining
- perations, and environmental risks. In general, forward-looking information can be identified by the use of forward-looking terminology such as “plans”,
“expects” or “does not expect”, “projects”, “forecasts”, “budget”, “estimates”, “schedule”, “intends”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Some of the specific forward-looking information herein includes <>. The forward-looking information is based upon factors and assumptions the Company believes is reasonable based on information currently available to them. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance of the Corporation to differ from forward-looking information. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Corporation does not undertake to update any forward-looking information, except as required under applicable securities laws. These materials may contain inaccuracies or typographical errors. The Corporation shall not be responsible for any errors or omissions contained in these materials and do not guarantee the accuracy, completeness or timeliness of the information contained herein. Jamie Lavigne, M.Sc. P.Geo.., who is a qualified person under National Instrument 43-101 and is independent of the Corporation, has reviewed the scientific and technical information related to geology and exploration in this presentation.
2
Leadership Team Leadership Team
3
Management experienced in Sonora, epithermal gold deposits and putting mines into production. Ronald Goguen, Sr.
Chairman/CEO/ President Founder and Former Chairman of both Major Drilling International (TSX: MDI) and the Beaver Brook Antimony Mine
Brian Crawford, CPA
CFO 30 Years Experience as Financial Officer of Public and Private Corporations
Ian McGavney
COO Founder & Past President of Skye Capital Corporation and Northern Lorena Resources. More than a decade of experience in junior Resource Company finance and marketing
Ed Stringer
Director 50 Years in the Mineral Exploration Business; Exploration Driller. Former CEO of Britannia Mine (sold to Hudbay Minerals)
Paul Bartos, Ph.D
Director Noted Authority on Epithermal Gold Deposits; Vice President and Chief Geologist, Anglo Gold; Extensive Experience in Latin America
Roger Doucet
Director Former Director of Exploration for Agnico-Eagle Mines Mexico; Quebec Prospector of the year 1978
Jacques Monette
Director 40 Years Experience as an Underground Miner
William MacDonald
Director Retired; Former Director of Logistics for a Drilling Company in Mexico
T S X Ve n t u r e - C B I
Colibri Resource Corporation at a Glance Colibri Resource Corporation at a Glance
4 QUICK FACTS
- Trades: TSX.V: CBI | FSE: 2CO
- Property Portfolio Focused on Sonora, Mexico
- Led by an experienced Management Team and Board who have Found, Developed, and
Managed Producing Mines
CORPORATE STRUCTURE
- 52.9 million shares outstanding
- 77.5 million shares fully diluted
- Based in Moncton, New Brunswick
KEY PROJECTS
Flagship Project: The Pilar Gold Property (Advanced Stage Exploration) Joint Venture Project: The Pitaya Gold Property (Advanced Stage Exploration) Early Stage Project: The Evelyn Gold Property (Early Stage Exploration)
Flagship Property: The Pilar Gold Project Flagship Property: The Pilar Gold Project
5 Acquisition Structure (TSX-V Approved on July 25, 2017)
- Colibri issued 24,242,424 shares at $0.165 per share to purchase project ($4,000,000)
- Asset held in wholly own Mexican subsidiary company
- 12 km NE of Suaqui Grande, Sonora, Mexico
- 100% owned (no royalties)
- Near Surface Mineralization
Focus Property The Pilar Gold Property Location Near Suaqui Grande, Mexico Closest large center - Hermosillo, Sonora (2.5 Hour Driving Distance) Development Stage Advanced Exploration Metals Gold with Silver Credit Deposit Type Low sulfidation, Epithermal, Volcanic host, Highly Fractured, Oxidized, Altered Going Forward
- Resource Calculation Drilling
- Exploration Drilling
- Preliminary Economic Assessment
- Potential Open Pit Heap Leach Operation
T S X Ve n t u r e - C B I
Pilar Gold Property
6
- 105 hectares
- 100% Ownership, No NSR
- Mineralized zone 1,200m x 625m
- 3 Mineralized Zones drill tested and remain open in several directions
- Main Zone, North Hill, 4-Trench
- Several untested targets
- Average recovery: 92% (3 x 72 hour bottle roll)
- Previous Optionees:
- Santa Catalina Mining - Lundin Group (1995-1998)
- Santa Fe Mining (2009-2010)
- Canadian Gold Resources (2010-2017)
- Extensive Drilling, Trenching, Geophysics, Sampling
- Open Pit Potential, Oxidized, Heap Leach Potential, Low Sulfidation, Highly
Fractured, Epithermal Mineralization
North Hill Main Zone
Trench work Trench work Fault
Highly Fractured Rock
Pilar Gold Property – Work Completed to Date
7 Significant Amount of Data Collected on Pilar Property)
- 17,700m Drilling (Core & RC)
- 2650m of Channel/Trench Sampling/Mapping
- 739 Rock-chip Samples & 87 Soil Samples (mapped)
- Standard Cyanide Bottle Roll Testing Completed
- 3 tests – Avg. recovery 92% over 72 hours
Main Zone Block Model Vertical Section Looking NW Pre 2018 Drilling Au g/t 3D – Mineralized Envelope (0.20 g/t Au cut off)– Pre 2018 Drilling
North Hill Main Zone N
Projected Fault
Sweet Spot – Western Side of the Main Zone
8
Hole Q-8b: 13.5m @ 9.64 g/t Au Hole P-9b: 9.0m @ 10.16 g/t Au Hole 13-15: 66.0m @ 0.94 g/t Au Hole JES-12: 41.01m @ 1.31 g/t Au Hole J-7: 2.55m @ 7.91 g/t Au Hole JESP-12-4: 21.30m @ 0.84 g/t Au; AND 3.00m @ 3.44 g/t Au
T S X Ve n t u r e - C B I
Main Zone
North Hill
4 Trench Zone
(Looking East)
Channel & Chip Sampling
9
Date Channel Sampling (Meters) Channel Sampling Results Santa Catalina: Channel Sampling Campaign #1 Late 1995-1996 1,980 As high as: 28.0 g/t over 6m 7.72 g/t over 9m 4.4g/t over 12m Santa Catalina: Channel Sampling Campaign #2 January 1997 750 As high as: 55.4 g/t Au over 3m Date Number of Chip Samples Chip Sampling Results Chip Sampling Feb 2009 57 Mapped Chip Sampling May 2009 92 AVG: 1.22 g/t Au Chip Sampling 2009-10 590 50m of 3.39 g/t Au & Four samples over 10g/t Au
Highly Silicified Boulder with Analysis of 6 g/t Au 30+ Major Trenches Spanning 2.7km
Channel Sampling Chip Sampling
T S X Ve n t u r e - C B I
10
Highlighted: Projected Mineralized Structure - 1,200m X 625m
Main Zone 4 Trench Zone North Hill
Gold in Soils (g/t)
Historic shaft – surface sampled 2.48 g/t Au & 1.23 g/t Au 2.09 1.36
1.565
0.869
11
Hole ID From To Length Au (gpt) Ag (gpt) JES-18-12 15.00 16.50 1.50 0.34 13.50 JES-18-12 93.00 94.50 1.50 0.28 0.25 JES-18-13
no significant assays
JES-18-14 30.00 31.50 1.50 0.48 10.30 JES-18-14 91.50 144.00 52.50 0.20 0.84 incl 117.00 129.00 12.00 0.51 0.69 JES-18-15
no significant assays
JES-18-16 73.50 93.00 19.50 0.27 1.01 incl 73.50 75.00 1.50 2.19 1.60 incl 79.50 81.00 1.50 0.52 2.70 JES-18-17 25.50 28.50 3.00 0.28 40.90 JES-18-17 37.50 48.00 10.50 0.33 21.67 incl 37.50 42.00 4.50 0.34 24.17 incl 45.00 48.00 3.00 0.59 32.75 JES-18-18 60.00 61.50 1.50 0.47 24.30 JES-18-19 33.00 73.50 40.50 0.73 1.98 incl 45.00 48.00 3.00 5.37 3.20 JES-18-19 87.00 88.50 1.50 0.39 0.25 JES-18-19 96.00 106.50 10.50 0.20 0.25 JES-18-19 136.50 138.00 1.50 0.20 0.50 JES-18-20 88.50 94.50 6.00 0.24 1.21 incl 90.00 91.50 1.50 0.62 2.40
Hole ID From To Length Au (gpt) Ag (gpt) JES-18-5 6.00 16.50 10.50 0.28 5.82 incl 7.50 9.00 1.50 1.43 28.40 JES-18-5 31.50 34.50 3.00 0.41 8.65 JES-18-5 49.50 51.00 1.50 0.21 5.50 JES-18-5 121.50 126.00 4.50 0.28 0.33 JES-18-6 49.50 72.00 22.50 0.31 4.84 incl 66.00 72.00 6.00 0.73 15.45 JES-18-7 0.00 12.00 12.00 0.52 0.84 incl 0.00 3.00 3.00 1.74 2.30 JES-18-8 21.00 22.50 1.50 0.39 0.70 JES-18-8 85.50 87.00 1.50 0.23 8.90 JES-18-8 93.00 94.50 1.50 0.23 2.50 JES-18-9 6.00 12.00 6.00 0.79 7.50 JES-18-9 51.00 52.50 1.50 0.47 75.70 JES-18-10
no significant assays
JES-18-11
no significant assays Hole-ID From (m) To (m) Length (m) Au (gpt) JES-18-1 133.50 135.00 1.50 0.80 JES-18-2 19.50 52.50 33.00 0.15 incl. 24.00 28.50 4.50 0.65 JES-18-2 72.00 78.00 6.00 0.58 JES-18-3 48.00 52.50 4.50 0.32 JES-18-3 63.00 64.50 1.50 2.25 JES-18-3 117.00 130.50 13.50 5.64 incl. 117.00 126.00 9.00 8.16 incl. 117.00 118.50 1.50 33.40 JES-18-3 139.50 147.00 7.50 0.21 JES-18-4 0.00 15.00 15.00 0.27 incl. 0.00 7.50 7.50 0.39 JES-18-4 34.50 63.00 28.50 0.57 incl. 34.50 39.00 4.50 0.31 incl. 49.50 52.50 3.00 4.24 JES-18-4 97.50 99.00 1.50 1.09 JES-18-4 118.50 120.00 1.50 1.04
Phase 1 - 2018 Drilling Campaign
4 Trench
Red lines indicate 2018 Drill Holes Blue lines indicate Historic holes
27 2
Historic Drilling Campaigns
12
*The above chart is based on Santa Catalina Mining press releases. Core not available
DRILL CAMPAIGN DATE RC DRILLING (METERS) BEST INTERCEPT RESULTS
Santa Catalina: Drill Campaign #1 July 1996 2,900+ S-10: 16.5m of 53.47 g/t Au and 53.4 g/t Ag Q-8b: 13.5m of 9.64 g/t Au and 7.2 g/t Ag S-11: 1.5m of 6.70 g/t Au and 56.6 g/t Ag Santa Catalina: Drill Campaign #2 November 1996 3,200 P-9b: 9.0m of 10.16 g/t Au and 37.8 g/t Ag K-16: 7.5m of 3.30 g/t Au and 31.3 g/t Ag Santa Catalina: Drill Campaign #3 August 1997 1,700 S-13b: 1.5m of 8.58 g/t Au and 1.1 g/t Ag 2010 RC Drill Samples With +2 g/t Au Hole Number From Meters To Meters Au (g/t) J-7 (core) 11.80 14.35 7.950 JESP-10 1.5 3.0 2.330 JESP-10 38.0 39.5 2.650 JESP-12 9.0 10.5 3.563 JESP-15 4.5 6.0 3.950 JESP-15 30.5 32.0 4.590 Drill Campaign Date Drilling (Meters) Best Intercept Results CGR: Drill Campaign #2 May 2012 2,315 RC JESP 12-4: 3m of 3.435 g/t Au – from 57.0m downhole CGR: Drill Campaign #3 Nov 2013 1,566 RC JESP 13-15: 66.0m of 0.94 g/t Au – from 39.0m downhole
Metallurgical Testing
13 Excellent Gold Recoveries
Hermosillo-based Laboratorio Technologico de Metalurgia LTM S.A. de C.V (LTM) Was Commissioned to Complete Three Preliminary Metallurgical Tests
- 7 Samples Taken at 5-7 Meter Intervals Along a 35 Meter Long Section of
the Largest Known Mineralized Structure in the Main Zone.
- Test 1 Head Assay: 1.5 g/t Au and 6.0 g/t Ag
BOTTLE ROLL TEST 1 Test 1 Recovery in 72 Hours: 92.17% Gold and 28.66% Silver
92%
- 5 samples Taken From the Width of the Same Structure as Test 1, at 5
Meter Intervals, 60-100 Meters from Test 1.
- Test Was Run in Duplicate for Greater Accuracy
- Test 2 and Test 3 Head Assay: 0.79 g/t Au and 7.0 g/t Ag
BOTTLE ROLL TESTS 2 AND 3 Test 2 Recovery in 72 Hours: 91.17% Gold and 16.12% Silver
91%
Test 3 Recovery in 72 Hours: 93.88% Gold and 12.09% Silver
93% Highly Oxidized Material is Ideal For Heap Leach Gold Recovery
T S X Ve n t u r e - C B I
Pilar Gold – Path Forward
14 Increased Scale & Fast Track to Production Initiatives Underway. Corporate Objectives
- Raise Drilling Campaign Funds Via Private
Placement for Phase 2 drilling campaign (up to 70 holes)
Technical Objectives
- Verify Lundin’s estimated Mineralized Structured Zone:
1,200m x 625m x 100m
- Preliminary Economic Assessment
2018 Exploration Objectives
- Drill a Total of up to 100 (27 complete as of June)
- Expand on Previous Drilling Success
- Drill for Continuity of Grade, Extension and Depth
- Additional Metallurgical Testing of Material
- Prove up mineralized structure
PHOTO: RC Drill Activity at 4-Trench Prospect (Hole JESP-18)
Pitaya Property (JV Partnership with AEM) Pitaya Property (JV Partnership with AEM)
15
OVERVIEW
Commodity: Gold (Au) Size: 6564 hectares (65.64 Km²) Stage: Advanced Exploration Ownership: 24.45% (JV Partner Agnico Eagle: 75.55%) Location: Sonora State, Mexico Reserves: No calculation Nearby Exploration: Fresnillio - Tajitos Project (>400k oz Au) – 2km (E) Nearby Mines: Fresnillio - La Herradura (>10mm oz Au) – 40km (NW) Fresnillio - Nouche Buena (>1 mm oz Au) – 10km (W) Los Almos - El Chante (>1 mm oz Au) – 30km (SE) Fresnillio - Soledad Dipolos (>400k oz Au) – 25km (NE)
PLIEGUE NORTH ZONE
T S X Ve n t u r e - C B I
Pitaya Property
16 Extensive work completed on Project:
Drilling: 15,322 m Drilling 2017: 7,642 m (27 holes) Chip & Soil Samples: 2,708 + Ground Mag / SRK Mapping & Modelling Total Expenditures: $6.26 million USD Expended in 2017: $1.36 million USD
Pliegue North Pliegue SE SFran Extension Diente Tortuga Pitaya NE Jojoba Castilla TOTAL Meters 2217.3 2238.35 610 564.25 456.4 918.05 436.15 201.3 7641.8 Percentage(%) 29.02 29.29 7.98 7.38 5.97 12.01 5.71 2.63 100% holes 7 7 3 2 2 3 2 1 27
2017 Drilling Allocations
T S X Ve n t u r e - C B I
Regional Prospective
36 30 00 36 40 00 36 50 00 36 60 00 36 70 00 36 80 00
1 K
34 24 00 34 25 00 34 26 00 34 27 00 34 28 00 34 29 00
PTY-17-001 0.5 m @ 56.2 Ag g/t, 1.39 Cu % From 6.2 m 1.5 m @ 22.7 Ag g/t, 0.434 Cu % From 33.2 m PTY-17-004 0.5 m @ 56.2 Ag g/t, 1.39 Cu % From 6.2 1.5 m @ 22.7 Ag g/t, 0.434 Cu % From 33.2 m PTY-17-006 40.0 m @ 0.28 Au g/t, From 1.0 m Inc1.0 m @ 2.37 Au g/t, From 5.0 m Inc1.0 m @ 1.84 Au g/t, From 40 m 1.0 m @ 0.66 Au g/t, From 65 m 0.5 m @ 0.44 Au g/t, From 112 m 1.0 m @ 0.60 Au g/t, From 250 m 1.0 m @ 0.22 Au g/t, From 263 m PTY-17-009 2.0 m @ 0.28 Au g/t, From 147 m 3.0 m @ 0.35 Au g/t, From 154 m 5.0 m @ 0.22 Au g/t, From 166 m| PTY-17-017 2.0 m @ 0.32 Au g/t, From 58 m 1.0 m @ 0.60 Au g/t, From 91 m 9.0 m @ 0.20 Au g/t, From 98 m
0.9 m @ 0.69 Au g/t, From 149.75
PTY-17-012 4.1 m @ 0.20 Au g/t From 0.9 m 2.2 m @ 0.24 Au g/t From 65 m 3.0 m @ 0.18 Au g/t From 112 m PTY-17-014 1.0 m @ 0.24 Au g/t From 18 m 2.0 m @ 0.24 Au g/t From 48 m 2.0 m @ 0.16 Au g/t Frovm 150 m PTY-17-018 15.0 m @ 0.26 Au g/t, From 21.0 m Inc 4.0 m @ 0.43 Au g/t, From 23.0 m 2.0 m @ 0.586 Au g/t, From 31.0 m
25.5 m @ 0.80 Au g/t, From 56.0
Inc 13.6 m @ 1.20 Au g/t, From 56 m Inc 2.0 m @ 1.70 Au g/t,From 79 m 2.0 m @ 0.68 Au g/t, From 170.0 m 3.0 m @ 4.91 Au g/t, From 276.0 m 1.0 m @ 13.90 Au g/t From,276.0 m PTY-17-019
37.1m @ 0.55 Au g/t, From 170.0 m
Inc 4.0 m @ 2.63 Au g/t, From 170.0 m Inc 1.0 m @ 7.92 Au g/t, From 173 m Inc 0.5 m @ 9.39 Au g/t, From 206.6 m 35.3 m @ 0.29 Au g/t, From 213.7 m Inc 3.5 m @ 0.93 Au g/t, From 232.5 m
Inc 7.0 m @ 7.92 Au g/t, From 257 m
4.0 m @ 0.35 Au g/T, From 316 m PTY-17-002 36.2 m @ 0.28 Au g/t, From 2.0 m Inc 23.1 m @ 0.31 Au g/t, From 2.0 m Inc 10.4 m @ 0.41 Au g/t, From 2.0 m Inc 3.60 m @ 0.81 Au g/t, From 2.0 m Inc 14.2 m @ 0.37 Au g/t, From 24.0 m Inc 4.10 m @ 0.67 Au g/t, From 24.0 m Inc 1.10 m @ 2.19 Au g/t, From 24.0 m Inc 2.70 m @ 0.58 Au g/T, From 35.5 m PTY-17-003 6.4 m @ 0.32 Au g/t, From 25 m 2.1 m @ 0.53 Au g/t, From 27.70 m 3.0 m @ 0.43 Au g/t, From 107.1 m 2.2 m @ 20.96 Au g/t, From 181.6 m 20.0 m @ 0.42 Au g/t, From 243.0 m Inc18.10 m @ 0.45 Au g/t, From 244.7 m Inc10.8 m @ 0.63 Au g/t, From 252.2 m 1.0 m @ 0.48 Au g/t, 3.14 % Cu From 300 m PTY-17-020 7.7 m @ 0.21 Au g/t, From 44.3 m PTY-17-016
27.0 m @ 0.37 Au g/t, From 3.1 m Inc 12.0 m @ 0.62 Au g/t, From 7.4 m 3.2 m @ 0.49 Au g/t, From 150.9 m 65.0 m @ 0.30 Au g/t, From 182.0 m Inc 33.2 @ 0.46 Au g/t, From 213.9 m Inc 16.4 @ 0.49 Au g/t, From 230.7 m
PTY-17-011 3.0 m @ 0.47 Au g/t, From 11 m 1.0 m @ 0.81 Au g/t, From 106.5 m Inc 1.2 m @ 1.79 g/t From 124.8 m Inc 2.8 m @ 0.49 g/t From 211.7 m PTY-17-010
19.0 m @ 0.50 Au g/t, From 4.0 m
Inc 1.0 m @ 6.60 Au g/t, From 12.0 m 1.0 m @ 1.79 g/t, From 60.0 m 1.0 m @ 2.00 g/t, From 94.7 m
32.1 m @ 045 g/t, From 107.9 m
Inc 6.1 m @ 1.38 g/t, From 107.9 m Inc 3.0 m @ 0.76 g/t, From 137.0 m 7.0 m @ 0.30 g/t, From 220.0 m PTY-17-027 32.0 m @ 0.22 Au g/t From 98.0 m Inc 7.0 m @ 0.37 Au g/t From 98 m Inc 7.0 m @ 0.52 Au g/t From 122 m PTY-17-023 4.0 m @ 0.68 Au g/t, From 53.0 m
29.0 m @ 0.57 Au g/t, From 139 m
Inc 3.0 m @ 3.06 Au g/t , From 139.0 m Inc 5.0 m @ 1.14 Au g/t, From 155.0 m 0.9 m @ 1.12 Au g/t, From 186.1 m 1.0 m @ 1.28 Au g/t, From 304 m
Fresnillo PLC claims Riverside Resources claims
2017 Pitaya JV Drilling Results
17
17
Pitaya Property – Neighboring Exploration
18
In Fresnillo’s 2017 Annual Report, a resource of 400,000 + oz Au was released with the mineralized zone open along strike. A cut-off grade 0.3 g/t Au was used in the calculation.
- Exploration by Fresnillo PLC – Eastern Border
Regional magnetics depicting the Pitaya project and surrounding properties. Intense drilling by Fresnillo PLC along the eastern border of Pitaya (Tajitos project, >400k Oz Au
Evelyn Gold Property Evelyn Gold Property
19 High Potential Exploration Opportunity
- Acquired in 2008.
- 506 hectares - located in northwest Sonora, Mexico
- Easy access: 150 kilometres northwest of the capital city, Hermosillo
- Heavy artisanal placer mining activity on property
- 30km from La Herradura Gold Mine (Fresnillo PLC)
- FY15 Production: 398,866 Oz Au
- Grade: 0.76 g/t Au & Cost: US $145 per Oz Au
- 9km from Noche Buena Gold Mine (Industrias Penoles)
- FY2015 Production: 158,179 Oz Au
- “On strike” with the El Chanate Gold Mine (Alamos Gold)
- FY2015 Production 79,312 Oz Au
- Initial soil and rock chip sampling work has been completed for the site
- Highlight: Quartz vein in outcrop sampled in excess of 10 g/t Au over 80 m
Path Forward – 2018/2019
20
Corporate Objectives
- Raise capital to drill Phase 2 (7,000 m) at the Pilar Gold Project
- Prepare resource estimate
- Continue to drill and define resource at Pitaya
- Begin systematic exploration of Evelyn Project
Flagship Project: The Pilar Gold Property Joint Venture Project: The Pitaya Gold Property Early Stage Project: The Evelyn Gold Property
- Add resources – 7,000 m drilling
campaign to extend and prove: Main Zone, 4 Trench Zone, and North Hill Zone
- Leave it to JV Partner
- Chip Sampling, Geophysics Survey
and Soil Sampling (Initial focus along the 80 meter quartz vein)
T S X Ve n t u r e - C B I
Pilar Drill Campaign Photos
21
From Surface 41m of 1.31 g/t Au Highly Altered Rock in 4-Trench Area Drilling Activity on Pilar Checking The Dip Ready at the Drill Pad CGR Team at Pilar
T S X Ve n t u r e - C B I
Pilar Drill Campaign Photos
22
Rock Chips Laid Our For Viewing Starting A New Drill Hole Hole 13-5 Bagging a Sample Crew At Work Bagged and Numbered Samples