one of the richest gold mines in australia 1 8 million
play

One of the Richest Gold Mines in Australia 1.8 million ounces - PowerPoint PPT Presentation

NQ Minerals Beaconsfield Gold Mine Acquisition BEACONSFIELD GOLD MINE One of the Richest Gold Mines in Australia 1.8 million ounces historic production Beaconsfield Gold Bars Gold Pour at Beaconsfield Beaconsfield Gold Ore March 2020


  1. NQ Minerals – Beaconsfield Gold Mine Acquisition BEACONSFIELD GOLD MINE One of the Richest Gold Mines in Australia 1.8 million ounces historic production Beaconsfield Gold Bars Gold Pour at Beaconsfield Beaconsfield Gold Ore March 2020

  2. Disclaimer The information contained in this presentation is for informational purposes only and is not a recommendation as to whether to invest in NQ Minerals plc shares. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Unless otherwise specified, data and tables set out in this presentation are based on NQ Minerals plc management estimates. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of NQ Minerals plc or, its directors, or any of their employees or agents, nor any other person accepts any liability, including without limitation, any liability arising out of fault or negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, projections, prospects or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies. Past performance is no guarantee of future performance. This presentation includes “forward -looking statements” within the meaning of securities laws of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe”, “continue”, “objectives”, “outlook”, “guidance” or other similar words, and include statements regarding certain plans, strategies and objectives of management and expected financial performance. These forward-looking statements involve known and unknown risks, uncertainties and other factors, many of which are outside the control of NQ Minerals plc, and any of their officers, employees, agents or associates. Actual results, performance or achievements may vary materially from any projections and forward-looking statements and the assumptions on which those statements are based. Readers are cautioned not to place undue reliance on forward-looking statements and NQ Minerals plc assume no obligation to update such information. COMPETENT PERSONS REPORT The Resource information in this report is based on information (third party consultants) compiled by Mr. Roger Jackson who is a 20+ year Member of the Australasian Institute of Mining and Metallurgy and a Member of Australian Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves’ . Mr. Jackson consents to the inclusion of the resource reports referenced in this presentation on the matters, form and context in which the relevant data appears. 2

  3. Beaconsfield Gold Mine One of the Richest Gold Mines in Australia Beaconsfield NQ’s Hellyer Gold Mine Gold Mine 1.8 million ounces of Gold Produc ed Lead/Zinc/Gold/Silver A c q u i s i t i o n & M i n e R e - O p e n i n g • NQ acquiring the High-Grade Beaconsfield Gold Mine in Tasmania, Australia.* • Currently in due diligence and mine re-opening planning phase. • Recalculation of new gold resources underway. H I S T O R Y C O M E S T O L I F E • Significant gold resource potential in line with increased gold price . 3 * See NQ Minerals PLC press release dated February 21, 2020

  4. Period Mined Gold Grade Gold Recovered Million Tonnes (g/t) (koz) 1877-1914 1.1 ~25 854 1999-2012 2.7 11 923 Totals 3.8 ~15 1,777 Beaconsfield Gold Mine J Beaconsfield pre-1914 Old Mine Workings at Surface Jumbo development underground at Beaconsfield H I S T O R Y C O M E S T O L I F E 4 Hart Shaft – currently Heritage Mine Museum Beaconsfield Processing Plant

  5. Beaconsfield Gold Mine Beaconsfield Mine Re-Opening Plan: Re-Opening Plan • Re-commission processing plant. • Cost and develop a new 3km long decline from surface to 400m below surface. W I L L I A M P E N N A D A I R • Commence gold production ASAP. Very ry High Grade Vein Gold fr from 840mL 5 H I S T O R Y C O M E S T O L I F E

  6. The Processing Plant: • Only permitted gold processing plant in North Tasmania. • Plant has proven track record (>90% gold recovery). • Fully permitted tailings dam. • Experienced local workforce. • Early cash flow from plant recommissioning plans with retreatment of surface stockpiles. Beaconsfield Gold Mine Permits in place Early Cash Flow Plans Permitted Tailings Dam at Beacons field Typical mine decline access Portal The Mine: • 593 hectares of mining lease covering the famous Tasmanian Reef, open pit potential, new reef discovery potential and infrastructure. • A new mine access decline is the key to re-opening Beaconsfield and providing for long-term low-cost operations for many years. H I S T O R Y C O M E S T O L I F E 6 • Tasmania Reef drilled to 300m below mine depth. Open to depth.

  7. Beaconsfield Gold Processing Plant: • Constructed 1999. • Processing capacity 350,000 tpa. • Comprises crusher, Ball Mill, Gravity Gold Circuits, Flotation, Beaconsfield Gold Mine Bacterial Oxidation, Cyanide Leaching, Cyanide Detoxification. • Process plant can treat both free milling and refractory material. • Fully permitted. Gold Processing Plant • Replacement value today of over $80 million. Beaconsfield Gold Bars H I S T O R Y C O M E S T O L I F E 7

  8. Beaconsfield Gold Mine Processing Flow Sheet H I S T O R Y C O M E S T O L I F E 8

  9. Beaconsfield Gold Mine Ore Body Open to Depth H I S T O R Y C O M E S T O L I F E 9

  10. Beaconsfield Gold Mine Gold Potential at Depth Drill Hole # Metres (m) Gold (g/t) J17 24.3 8.8 F91 7.0 21.7 Current Bottom of Mine F88 11.0 15.4 J14 6.6 11.3 J10 2.5 32.4 H I S T O R Y C O M E S T O L I F E Note: This Long Section was published by BCD Resources in November 2011. The mine continued operating until June 2012. 10

  11. Beaconsfield Gold Mine New Planned Mine Decline Access New proposed decline in footwall of historic workings at Moonlight-cum- Wonder and Tasmania Reefs H I S T O R Y C O M E S T O L I F E 11

  12. Beaconsfield Gold Mine Gold Strategy Proposed New Processing Decline Portal Plant H I S T O R Y C O M E S T O L I F E 12

  13. For further information, please contact: NQ Minerals PLC David Lenigas Chairman lenigas@nqminerals.com London NEX: NQMI Roger Jackson Executive Director roger.jackson@nqminerals.com www.nqminerals.com Tel: +61 400 408 550 Colin Sutherland Chief Financial Officer colin.sutherland@nqminerals.com Tel: +1 416 452 2166 H I S T O R Y C O M E S T O L I F E

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend