BUREAU OF FACILITIES, ARCHITECTURE DIVIS DEPARTMENT OF PUBLIC WORKS Demolition of the Cowley- Goettman Recreation Center Community Meeting #2 April 10, 2019 Mayor William Peduto Mike Gable, CPRP City of Pittsburgh Department of Public Works
DEPARTMENT OF PUBLIC WORKS BUREAU OF FACILITIES, ARCHITECTURE DIVIS
Demolition of the Cowley- Goettman Recreation Center
Community Meeting #2 April 10, 2019
3 Mayor William Peduto City of Pittsburgh Councilwoman Darlene Harris Pittsburgh’s 1st District Molly Onufer Community Affairs Manager Leah Friedman Community Liaison Mike Gable, CPRP Department of Public Works (DPW) Director Chris Hornstein, RLA DPW Assistant Director – Bureau of Facilities Casimir Pellegrini III, AIA Senior Project Architect Andrea L. Ketzel, RLA Senior Project Landscape Architect Joe Adiutori, Jr., AIA Associate Project Manager Harvey Butts Associate Project Manager
4
- 1. INTRODUCTIONS
- 2. REVIEW BUILDING CONDITION & THE FACILITIES OPTIMIZATION
PLAN
- 3. DISCUSS WHAT SHOULD BE SALVAGED FROM THE BUILDING
- 4. REVIEW DEMOLITION PROCESS
- 5. REVIEW COST ANALYSIS
- 6. Q&A
- 7. CONCLUSIONS
Presentation Outline
5
Cowley-Goettman Recreation Center
6
7
8
9
10
11
12
13
14
Facilities Optimization Plan
15
16
17
Architectural Salvage – Stone Work
18
Architectural Salvage – Gym Flooring
19
Architectural Salvage – Building Signage
20
Architectural Salvage – Wall Mosaic
21
- Misc. Salvage – Basketball Standards & Banner
22
- Misc. Salvage – Warming Table & Billiard Table
23
Miscellaneous Salvage – Frigidaire Fridge
24
Miscellaneous Salvage – Westinghouse Fridge
25
Demolition Process (4 to 6 months)
- 1. Engineering (4 to 6 weeks); currently ongoing
- 2. Permitting & Termination (4 to 8 weeks)
- Will occur after the award, but prior to demolition.
- Utilities to the building will be terminated.
- 3. Building Demolition (12 to 18 weeks)
- The City will work with the community to minimize impact to park usage.
- 4. Mitigation Efforts:
- Noise: Operation times to be specified in order to minimize disturbance.
- Air Quality: Specify dust suppression & haul away all materials by contractors. Note: No
material processing (i.e. brick crushing) will be allowed on-site
- Pest Control: Building to be exterminated prior to demolition.
- Safety: Temporary perimeter fence will be installed around the building.
- Post-Demolition Improvements: Engineered Slope will be required & the installation of a
railing along the sidewalk.
26
Demolition Engineering Proposal
27
28
29
Funding Sources
DEPARTMENT OF PUBLIC WORKS BUREAU OF FACILITIES, ARCHITECTURE DIVIS
Question & Answer Session
31