demolition of the cowley goettman recreation center
play

Demolition of the Cowley- Goettman Recreation Center Community - PowerPoint PPT Presentation

BUREAU OF FACILITIES, ARCHITECTURE DIVIS DEPARTMENT OF PUBLIC WORKS Demolition of the Cowley- Goettman Recreation Center Community Meeting #2 April 10, 2019 Mayor William Peduto Mike Gable, CPRP City of Pittsburgh Department of Public Works


  1. BUREAU OF FACILITIES, ARCHITECTURE DIVIS DEPARTMENT OF PUBLIC WORKS Demolition of the Cowley- Goettman Recreation Center Community Meeting #2 April 10, 2019

  2. Mayor William Peduto Mike Gable, CPRP City of Pittsburgh Department of Public Works (DPW) Director Councilwoman Darlene Harris Pittsburgh’s 1st District Chris Hornstein, RLA DPW Assistant Director – Bureau of Molly Onufer Facilities Community Affairs Manager Casimir Pellegrini III, AIA Leah Friedman Senior Project Architect Community Liaison Andrea L. Ketzel, RLA Senior Project Landscape Architect Joe Adiutori, Jr., AIA Associate Project Manager Harvey Butts Associate Project Manager 3

  3. 1. INTRODUCTIONS 2. REVIEW BUILDING CONDITION & THE FACILITIES OPTIMIZATION PLAN 3. DISCUSS WHAT SHOULD BE SALVAGED FROM THE BUILDING 4. REVIEW DEMOLITION PROCESS 5. REVIEW COST ANALYSIS 6. Q&A 7. CONCLUSIONS Presentation Outline 4

  4. Cowley-Goettman Recreation Center 5

  5. 6

  6. 7

  7. 8

  8. 9

  9. 10

  10. 11

  11. 12

  12. 13

  13. Facilities Optimization Plan 14

  14. 15

  15. 16

  16. Architectural Salvage – Stone Work 17

  17. Architectural Salvage – Gym Flooring 18

  18. Architectural Salvage – Building Signage 19

  19. Architectural Salvage – Wall Mosaic 20

  20. Misc. Salvage – Basketball Standards & Banner 21

  21. Misc. Salvage – Warming Table & Billiard Table 22

  22. Miscellaneous Salvage – Frigidaire Fridge 23

  23. Miscellaneous Salvage – Westinghouse Fridge 24

  24. 1. Engineering (4 to 6 weeks); currently ongoing 2. Permitting & Termination (4 to 8 weeks) Will occur after the award, but prior to demolition. • Utilities to the building will be terminated. • 3. Building Demolition (12 to 18 weeks) The City will work with the community to minimize impact to park usage. • 4. Mitigation Efforts: Noise: Operation times to be specified in order to minimize disturbance. • Air Quality: Specify dust suppression & haul away all materials by contractors. Note: No • material processing (i.e. brick crushing) will be allowed on-site Pest Control: Building to be exterminated prior to demolition. • Safety: Temporary perimeter fence will be installed around the building. • Post-Demolition Improvements: Engineered Slope will be required & the installation of a • railing along the sidewalk. Demolition Process (4 to 6 months) 25

  25. Demolition Engineering Proposal 26

  26. 27

  27. 28

  28. Funding Sources 29

  29. BUREAU OF FACILITIES, ARCHITECTURE DIVIS DEPARTMENT OF PUBLIC WORKS Question & Answer Session

  30. Next Steps 31

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend