Currie Park Concepts February 7, 2017 Current Layout CRA concept - - PowerPoint PPT Presentation

currie park concepts
SMART_READER_LITE
LIVE PREVIEW

Currie Park Concepts February 7, 2017 Current Layout CRA concept - - PowerPoint PPT Presentation

Currie Park Concepts February 7, 2017 Current Layout CRA concept 2015 2015 Private Sector Concept Carlo Ratti Associati 2016 Green parking garage over boat Northwood Rambla ramps Tennis courts Amphitheater Water access


slide-1
SLIDE 1

Currie Park Concepts

February 7, 2017

slide-2
SLIDE 2

Current Layout

slide-3
SLIDE 3

CRA concept 2015

slide-4
SLIDE 4

2015 Private Sector Concept

slide-5
SLIDE 5

Carlo Ratti Associati 2016

  • Green parking garage over boat

ramps

  • Amphitheater
  • Interactive floating pavilion
  • Northwood Rambla
  • Tennis courts
  • Water access
  • Waterfront restaurants
slide-6
SLIDE 6

Access to the water

slide-7
SLIDE 7

Waterfront

The waterfront design is based on the 3 main elements: the park, the walkways and the water.

slide-8
SLIDE 8
slide-9
SLIDE 9

The Floating Pavilion

slide-10
SLIDE 10

The Floating Pavilion

The Water Rings Pavilion is composed of three key components: a responsive floating platform, a canopy and a Water Fly sensing drone fleet system. Using a responsive floatation system, we can bring people to the level of the water, immersing them in a brand new water experience

slide-11
SLIDE 11

The Floating Pavilion

slide-12
SLIDE 12

Other Design Factors

Parking MIT’s research depicts a future city which needs just 30 percent of its existing vehicles. Moreover, smart parking systems could be implemented, whereby driverless vehicles drop their passengers off, find a parking space and park closely to each other.

slide-13
SLIDE 13

Parking

By lifting the landscape to conceal covered parking

  • n the north end of the

site, a new façade on the water is created. In tandem with the proposed marina and floating pier a the extension of Northwood Road, this new frontage brings an increase of foot traffic to the waterfront boulevard.

slide-14
SLIDE 14
slide-15
SLIDE 15

New Northwood Road

slide-16
SLIDE 16

Building Massing

slide-17
SLIDE 17

Towers Taxonomy

The tower typology will adapt to accommodate a range of architectural features with the same size and height.

slide-18
SLIDE 18

The Residences

The podium of the new blocks is a porous border where retail activities take place and create a hub for people all around the site. A longitudinal Market will front Flagler Dr. and connect the pedestrians and the residents to the park.

slide-19
SLIDE 19

Residence First Floor

slide-20
SLIDE 20

View from Residences

  • Infinity pool overlooking water and Palm Beach
  • 4th Floor
slide-21
SLIDE 21

Thank You Questions?

slide-22
SLIDE 22

Original and fill lands

slide-23
SLIDE 23

Governor’s Island, NYC

slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29

London

slide-30
SLIDE 30
slide-31
SLIDE 31

Gas Works Park-Seattle

slide-32
SLIDE 32
slide-33
SLIDE 33