crestw ood overview
play

Crestw ood Overview Nationw ide Footprint / Diverse Product Mix - PowerPoint PPT Presentation

Crestw ood Overview Nationw ide Footprint / Diverse Product Mix Asset Map Volum es by Product 3 % 1 5 % Crude 2 0 % Gas NGLs Water 6 2 % Key Statistics 1,350 miles of pipeline 125 MBPD crude oil gathering 2.6 Bcf/ d


  1. Crestw ood Overview Nationw ide Footprint / Diverse Product Mix Asset Map Volum es by Product 3 % 1 5 % Crude 2 0 % Gas NGLs Water 6 2 % Key Statistics • 1,350 miles of pipeline • 125 MBPD crude oil gathering • 2.6 Bcf/ d gathering • 180 MBPD crude oil • 1.4 Bcf/ d transport rail terminalling • 500 MMSCFD • 294 MBPD nationwide processing NGL logistics business, with rail cars • 79 Bcf nat gas storage and trucking units • 4.3 MM barrels crude and NGL storage Crestw ood has a diversified portfolio of assets located in the m ost active dom estic shale plays and w ell balanced across all com m odities ™ ™ ™ Connections for America’s Energy ™ ™ ™ 1

  2. Crestw ood Bakken Asset Overview Arrow Gathering System Assets Map • Arrow gathers crude oil, natural gas, and water covering 150,000 acres on the Fort Berthold Indian Reservation in TESORO PIPELINE McKenzie & Dunn counties, North Dakota MEADOWLARK COLT HUB GATHERING SYSTEM • Over 550 miles of pipe and growing with new expansion projects ENBRIDGE PIPELINE • Strong well economics through enhanced completions driving increased producer activity HILAND • Arrow connects to DAPL, Hiland, Tesoro, and Bakkenlink PIPELINE TESORO PIPELINE pipelines offering producer’s premium market access COLT Hub ( Epping, ND) ARROW • COLT Hub is a leading Bakken terminalling facility in Epping, North Dakota – 160 MBbls/ d crude oil rail loading capacity (BNSF) BAKKENLINK – 1.2 MMBls crude oil storage capacity – > 10 MBbls/ d NGL transloading capacity • COLT Hub connects to multiple downstream crude oil pipelines/ markets and provides raw mix and purity product NGL throughput and marketing services ™ ™ ™ Connections for America’s Energy ™ ™ ™ 2

  3. Arrow – 2 0 1 7 Expansion Projects Capex Project Existing Gathering Existing Facility ( $ MM) New Gas Gathering New Facility Project Gas Projects $140 New Oil Gathering Oil Projects $13 New Water Gathering Water Projects $12 DAPL SW D Bear Den I Connection Expansion Plant Bear Den W est Pipeline NGL/ Gas I nterconnects ™ ™ ™ Connections for America’s Energy ™ ™ ™ 3

  4. Bear Den I & I I • NDIC flaring limits have resulted in significant reduction in flared gas leading to an increase in natural gas production • Future flaring limits expected to become more stringent going forward • Crestwood commitment to reduce flaring evident upon acquisition and current investments – Bear Den I & II • NGL take-away is the next challenge the basin faces – Colt Hub expansion Bakken Future Flaring Historical Arrow Gas Flaring & Bear Den I I Lim its Bear Den I Tim ing Ground Breaking 16% 1 5 % Until Oct-1 8 15% 14% 1 2 % from 13% Nov-1 8 -Oct-2 0 12% 11% 9 % After Nov-2 0 10% 9% 8% May-17 Mar-18 Dec-18 Sep-19 Jun-20 Mar-21 Dec-21 Bear Den I 3 0 ,0 0 0 MCFD Construction 1 Q1 7 Com m issioned Late Nov-1 7 Sources: NDPA. ™ ™ ™ Connections for America’s Energy ™ ™ ™ 4

  5. Leading Bakken Liquids Term inal Crestwood’s COLT Hub links Bakken Shale liquids to prime markets NGL Term inal Overview Crude Term inal Overview • > 290 MBbls/ d of crude oil sourcing capacity • > 10 MBbls/ d of raw mix and purity products transloading capacity • 1.2 MMBbls of crude oil storage • Extensive marketing services to downstream • > 350 MBbls/ d of crude oil take-away capacity rail markets (Midwest, Gulf, East, & West Coast) • NGL trucking services allows for service flexiblity (processing plants, MRUs, etc.) ™ ™ ™ Connections for America’s Energy ™ ™ ™ 5 5

  6. Right of W ay Process Tim e Line Title 5/27/2018 - 6/3/2018 Appraisal 5/27/2018 - 7/27/2018 (Delays / Reroute) Permission 5/27/2018 - 8/27/2018 Land Survey 8/28/2018 - 9/4/2018 Preliminary Route Data Distributed 9/5/2018 - 9/11/2018 NEPA Scoping 9/12/2018 - 10/12/2018 NEPA Onsite Field Surveys 10/13/2018 - 10/27/2018 NEPA Onsite Visit 10/21/2018 - 10/27/2018 NEPA Survey Drafting 10/21/2018 - 11/3/2018 NEPA Reports Completed 11/4/2018 - 11/17/2018 Cultural Reports Submitted 11/18/2018 - 12/18/2018 Final Plats Completed 11/18/2018 - 12/18/2018 NEPA Submitted & FONSI Issued 11/18/2018 - 1/17/2019 (Delays / Reroute) TAT/Allotees/Fee Surface Owner Consents Obtained 1/18/2019 - 5/17/2019 BIA Application 5/18/2019 - 5/24/2019 5/25/2019 - BIA Approval 8/24/2019 455 Days 2018 2019 Day 1 66 131 196 261 326 391 ™ ™ ™ Connections for America’s Energy ™ ™ ™ 9

  7. Crestw ood’s Com m unity I nvolvem ent Crestw ood’s Bakken Success Starts w ith it’s Relationship w ith Crestw ood’s the MHA Nation Operating Principles Tribal Relations • MHA Nation is Crestwood’s largest Landowner • Industry’s relationship with government and SAFE landowner’s are critical to infrastructure success Crestw ood Nursing Station • Donated Nursing Station wing of new hospital in Watford City, set to open in 2018 RESPONSI BLE The Crestw ood Mahgiddashda Center • Pledged $1 million to launch a capital campaign for a new Head Start facility in Mandaree, North Dakota • Broke ground fall of 2017 with plans to open for students by fall 2018 GOOD NEI GHBOR I nvolvem ent w ith industry organizations, local governm ent, and the com m unity are vital to Crestw ood’s Bakken operations ™ ™ ™ Connections for America’s Energy ™ ™ ™ 7

  8. Produced W ater Gathering & Disposal 3 5 0 T R 2 6 2 U C E K A 1 7 7 S C H 1 3 9 R E D M A O Y V E D Year 2 0 1 6 2 0 1 7 2 0 1 8 * 2 0 1 9 * BBLs 10,156,000 12,940,000 19,126,000 25,550,000 Miles 1,767,000 2,252,000 3,328,000 4,445,000 CO2 Tons 10,480 13,350 19,735 26,365 Positive Com m unity I m pact on Safety, Environm ent, and Roads * Estimates based on capacity ™ ™ ™ Connections for America’s Energy ™ ™ ™ 8

  9. Arrow – 2 0 1 8 Expansion Projects Capex Project Existing Gathering Existing Facility ( $ MM) New Gas Gathering New Facility Project Gas Projects $108 New Oil Gathering Oil Projects $10 New Water Gathering Water Projects $75 SW D Station 1 Pum ps Expansions & Com pression Station 6 Pum ps Com pressor Station 8 Section 1 4 -1 7 Pum p Station ™ ™ ™ Connections for America’s Energy ™ ™ ™ 9

  10. Arrow – 2 0 1 9 Expansion Projects Capex Project Existing Gathering Existing Facility ( $ MM) New Gas Gathering New Facility Project Gas Projects $172 New Oil Gathering Oil Projects $4 New Water Gathering Water Projects $50 Bear Den I I Plant Station 5 Com pression Station 4 Com pression ™ ™ ™ Connections for America’s Energy ™ ™ ™ 10

  11. Sum m ary Bakken producers continue to accelerate their drilling activity, creating a need for increased gathering capacity, processing, and NGL take-aw ay system s The com pany has com m itted over $ 5 5 0 m illion in capital to Bakken projects Crestw ood’s Bear Den plants w ill reduce flaring, enhance producer net backs and provide greater flow assurance Expansion projects w ill be part of the solution to relieve flaring and increase productivity Crestw ood’s Operating Principle’s are a critical keystone in key com m unity relationships and Crestw ood’s future success ™ ™ ™ Connections for America’s Energy ™ ™ ™ 11 CONFI DENTIAL - NOT FOR DI STRIBUTION

  12. ™ ™ ™ Connections for America’s Energy ™ ™ ™ 12 CONFI DENTIAL - NOT FOR DI STRIBUTION

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend