SLIDE 10 The Subm bmission ission P Process ss
St Step 3: 3: Attend P Protocol I Impleme mentation ( (PI) I) M Meeting All ll pertin inent s staf aff m mus ust at attend in includ ludin ing L Lab, ab, E Echo, Nut utrit ition, NP, O OP clinic, I , IP clinic, s , study c y coor
rs; I ; Investigator
will ill at attend if if needed. Th The nur urse liais liaison w will ill br brin ing t the comple leted o
to t the meetin ing an and go go o
the flo low s sheets f for f fin inaliz alization. Please b be pr prepa pared to d to pa pay the the CT CTO adm dministrative ve f fee at t the the meet eeting ng.