Clarendon Circle Transportation Study

Updated March 2012

Prepared By Toole Design Group and Arlington County DES, Division of Transportation

A Multimodal Study of Clarendon Circle and Surrounding Intersections

slide-2
SLIDE 2

Project Goals

  • Implement the Clarendon Sector Plan
  • Improve pedestrian and bicycle

safety and access

  • Normalize the intersection geometry
  • Maintain or improve traffic flow
  • Reduce pavement area / intersection

size

  • Improve traffic control (signals,

signing, markings) and lighting

slide-3
SLIDE 3

Key Existing Issues

slide-4
SLIDE 4

Sector Plan Analysis

slide-5
SLIDE 5

Existing Traffic Conditions

Analysis for 2015

AM/PM peak Level of Service

slide-6
SLIDE 6

3 Concepts for Lane Configurations

  • Concept 1 (Existing Lanes) – Keep existing lane configuration on

Washington Boulevard: keep existing westbound left turn lane. Level of Service AM/PM = C/C

  • Concept 2 (Four Lanes) – Four lanes on Washington Boulevard: Remove

westbound left turn lane. Level of Service AM/PM = D/D

  • Concept 3 (Five Lanes) – Five lanes on Washington Boulevard: Add

eastbound left turn lane. Level of Service AM/PM = B/C

slide-7
SLIDE 7

Lane Configuration 1 (Existing Lanes)

Existing lanes on Washington Blvd

slide-8
SLIDE 8

Lane Configuration 2 (Four Lanes)

Four lanes on Washington Blvd

(Remove dedicated left lane and create a thru/left lane)

slide-9
SLIDE 9

Lane Configuration 3 (Five Lanes)

Five lanes on Washington Blvd

(add turn lane)

slide-10
SLIDE 10

3 Alternatives to Improve Wilson Blvd Alignment

  • Alternate A– Push towards diner property
  • Alternate B – shift within intersection and

reduce footprint

  • Alternate C – push towards memorial north of

intersection

These alternatives work with the Concepts 1,2, and 3 (previously viewed)

slide-11
SLIDE 11

Wilson Boulevard Alignment Options Alternate A

push towards diner property

slide-12
SLIDE 12

Wilson Boulevard Alignment Options Alternate B

shift within intersection and reduce footprint

slide-13
SLIDE 13

Wilson Boulevard Alignment Options Alternate C

Push towards memorial

slide-14
SLIDE 14

Concepts Comparison Matrix

Which combination of concept and alignment best meet the goals of the project?

slide-15
SLIDE 15

Proposed Design Alternative 2B

  • Tightest intersection geometry
  • Realigns Washington Boulevard and Wilson Boulevard
  • Washington Blvd as a 4-lane cross section (removes the

westbound left turn lane)

  • Widens/adds medians
  • Removes slip lane at the Olmstead Building
  • Closes N. Irving Street north of intersection
  • Adds curb extensions at Liberty Tavern and Sam’s Deli
  • Adds bike lanes to improve bike connections
  • Widens crosswalks and shortens crossing distances
  • Improve sight lines and visibility

Potential best option based on Design Study results and meeting the goals of the project

slide-16
SLIDE 16

Potential best option based on Design Study results and meeting the goals of the project

Proposed Design Alternative 2B

slide-17
SLIDE 17

Future Build-out Opportunities

Add parking Widened sidewalks and bike lanes Potential wider median

slide-18
SLIDE 18

View looking south on Washington Boulevard from NE Corner (old Petco site) Old Petco Building Corner Silver Diner Corner

Illustrations of Proposed Improvements

slide-19
SLIDE 19

View looking south on Washington Boulevard Sam’s Deli Corner Old Petco Building Corner Silver Diner Corner

Illustrations of Proposed Improvements

slide-20
SLIDE 20

Illustrations of Proposed Improvements

View looking West on Wilson Blvd Liberty Tavern Corner Wells Fargo bank Corner Olmstead Building Corner

slide-21
SLIDE 21

View looking west on Wilson Boulevard Liberty Tavern / Sam’s Deli Corner Clarendon Central Park / monument corner

Illustrations of Proposed Improvements

slide-22
SLIDE 22

Encourage westbound Wilson Blvd traffic to use 10th Street Discourage westbound Wilson Blvd traffic from going through Clarendon Circle Lengthen and improve dedicated left turn lane to add capacity and improve flow. Proposed additional changes to improve westbound Wilson Blvd traffic flow through Clarendon

10th Street and Wilson Blvd Intersection Improvements

slide-23
SLIDE 23

10th Street and Wilson Blvd Intersection Improvements

Proposed Additional Changes to Improve West bound Wilson Blvd traffic flow through Clarendon. A longer left turn lane will add capacity and improve flow. Proposed improvements will be coordinated with sidewalk, signal and other pedestrian safety improvements.

slide-24
SLIDE 24

The Development Project Garfield Park will be lengthening the left turn pocket to better accommodate AM peak turns on to 10th Street.

Changes to 10th Street and Washington Blvd Intersection

Left Turn Pocket Extension

slide-25
SLIDE 25

Illustration of extension of left turn pocket

Changes to 10th Street and Washington Blvd Intersection

Left Turn Pocket Extension

slide-26
SLIDE 26

Encourage westbound Washington Blvd traffic to use 10th Street Discourage Washington Blvd traffic from using 9th Street. Potential locations for street improvements. Potential changes to 9th Street could reduce cut through traffic

Lyon Park Neighborhood Streets

slide-27
SLIDE 27

Next Steps:

  • Present Conceptual Design (25% Plans) to Manager’s Office, County Board members

and Commissions.

  • Launch project web page in January 2012.
  • Schedule public forums to include Clarendon Alliance and surrounding civic

associations – January–May 2012.

  • Meet with adjacent business owners.
  • Prepare 50% engineering plans.
  • Begin real estate appraisals/impacts (limited).
  • Schedule second round of public meetings to focus on project details, sidewalk

paving patterns, streetlights, Petco site amenities etc.

  • Provide second update to Manager’s Office, County Board and Commissions with

90% engineering plans.

  • Finalize plans and prepare construction bid package/schedule construction.
  • Goal: Begin construction in 2014 or sooner.
  • Web Page Link:

http://www.arlingtonva.us/departments/environmentalservices/dot/page84699.aspx

End of Presentation