City of Rehoboth Beach Ocean Outfall Project Town Hall Q&A - - PowerPoint PPT Presentation

city of rehoboth beach ocean outfall project
SMART_READER_LITE
LIVE PREVIEW

City of Rehoboth Beach Ocean Outfall Project Town Hall Q&A - - PowerPoint PPT Presentation

City of Rehoboth Beach Ocean Outfall Project Town Hall Q&A Workshop September 16, 2017 City of Rehoboth Beach Town Hall Workshop September 16, 2017 Agenda Projects Overview Force Main Construction Force Main Alignment


slide-1
SLIDE 1

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

City of Rehoboth Beach Ocean Outfall Project

Town Hall Q&A Workshop

September 16, 2017

slide-2
SLIDE 2

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Agenda

  • Projects Overview
  • Force Main Construction
  • Force Main Alignment
  • Construction Plan / Impacts
  • Deauville Beach
  • Questions
slide-3
SLIDE 3

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Ocean Outfall Projects

Outfall Pipe & Diffuser

  • 24-inch outfall pipe from the staging area

to the outfall diffuser, 6,000 ft away

  • Located at end of outfall pipe, 6,000 ft
  • ffshore

Force Main

  • Force main from the RBWWTP to the
  • utfall staging area (approximately 11,400

ft)

Pump Station

  • New pump station located at the

RBWWTP

WWTP Reliability Upgrades

  • Various upgrades at the Rehoboth WWTP
slide-4
SLIDE 4

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Force Main

Proposed Force Main Alignment

  • 11,400 linear feet long, 24-

inch diameter PVC pipe.

  • Will predominately follow

existing utilities and right of ways

Construction Methods

  • Combination of open cut

excavation and jack and bore

slide-5
SLIDE 5

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

WWTP / Roosevelt Street

slide-6
SLIDE 6

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

State Road / Canal Street

slide-7
SLIDE 7

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Canal Street / Rehoboth Avenue

slide-8
SLIDE 8

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Grove Park

slide-9
SLIDE 9

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Henlopen Avenue

slide-10
SLIDE 10

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Henlopen Avenue

slide-11
SLIDE 11

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

slide-12
SLIDE 12

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Construction Plan

  • Working hours are 7:30 am to 6:00 pm, Monday thru Friday
  • Installation expected to be 50 to 80 LF per day
  • Trench width will be ~6 ft
  • Depth of pipe varies
  • Contractor will be limited to ~200 LF of open-cut trench at any time
  • Traffic control will extend on 200 ft on each side
  • Various road closures are expected - Henlopen
  • Parking gravel/grass areas along northside of roadway will be impacted
  • Paving will be completed at end of project
slide-13
SLIDE 13

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

slide-14
SLIDE 14

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

slide-15
SLIDE 15

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

slide-16
SLIDE 16

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Deauville Beach

slide-17
SLIDE 17

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Deauville Beach

slide-18
SLIDE 18

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Outfall

slide-19
SLIDE 19

City of Rehoboth Beach Town Hall Workshop – September 16, 2017

Questions?