Agenda
- Projects Overview
- Force Main Construction
- Force Main Alignment
- Construction Plan / Impacts
- Deauville Beach
- Questions
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Ocean Outfall Projects
Outfall Pipe & Diffuser
- 24-inch outfall pipe from the staging area
to the outfall diffuser, 6,000 ft away
- Located at end of outfall pipe, 6,000 ft
- ffshore
Force Main
- Force main from the RBWWTP to the
- utfall staging area (approximately 11,400
ft)
Pump Station
- New pump station located at the
RBWWTP
WWTP Reliability Upgrades
- Various upgrades at the Rehoboth WWTP
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Force Main
Proposed Force Main Alignment
- 11,400 linear feet long, 24-
inch diameter PVC pipe.
- Will predominately follow
existing utilities and right of ways
Construction Methods
- Combination of open cut
excavation and jack and bore
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
WWTP / Roosevelt Street
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
State Road / Canal Street
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Canal Street / Rehoboth Avenue
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Grove Park
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Henlopen Avenue
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Henlopen Avenue
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Construction Plan
- Working hours are 7:30 am to 6:00 pm, Monday thru Friday
- Installation expected to be 50 to 80 LF per day
- Trench width will be ~6 ft
- Depth of pipe varies
- Contractor will be limited to ~200 LF of open-cut trench at any time
- Traffic control will extend on 200 ft on each side
- Various road closures are expected - Henlopen
- Parking gravel/grass areas along northside of roadway will be impacted
- Paving will be completed at end of project
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Deauville Beach
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Deauville Beach
City of Rehoboth Beach Town Hall Workshop – September 16, 2017
Outfall