CIPM MRA EURAMETs View CIPM MRA Review Workshop 13 to 14 Oct. - - PowerPoint PPT Presentation

cipm mra euramet s view
SMART_READER_LITE
LIVE PREVIEW

CIPM MRA EURAMETs View CIPM MRA Review Workshop 13 to 14 Oct. - - PowerPoint PPT Presentation

CIPM MRA EURAMETs View CIPM MRA Review Workshop 13 to 14 Oct. 2015, BIPM Beat Jeckelmann, EURAMET Chairperson Introductory Remarks For RMO consensus view see RMO presentation EURAMET contributions to the discussion: Towards


slide-1
SLIDE 1

CIPM MRA EURAMET’s View

CIPM MRA Review Workshop 13 to 14 Oct. 2015, BIPM Beat Jeckelmann, EURAMET Chairperson

slide-2
SLIDE 2
  • For RMO consensus view see RMO

presentation

  • EURAMET contributions to the discussion:

− “Towards a sustainable CIPM MRA”, Working document, 31st JCRB Meeting − “Making the CIPM MRA sustainable: An approach for CIPM MRA Phase II”, report EURAMET project no 1298

Introductory Remarks

14/10/2015 CIPM MRA Workshop 2015, BIPM 2

slide-3
SLIDE 3

EURAMET and the CIPM MRA

  • 50% of CIPM MRA signatories are EURAMET

members or associates (holding 46% of CMC entries).

  • The successful implementation of the CIPM MRA

processes is a strategic objective for EURAMET.

14/10/2015 CIPM MRA Workshop 2015, BIPM 3

slide-4
SLIDE 4

There is not one single “great idea” to improve the system !

  • Streamline the processes
  • Change underlying principles

Towards more sustainability

14/10/2015 CIPM MRA Workshop 2015, BIPM 4

slide-5
SLIDE 5
  • Professionalize the tools

− Improved handling of CMC entries in review phase − Improved presentation of CMCs and search engine in the KCDB

  • Only publish best capability in a service category

(deduced “secondary” capabilities covered by QMS) Improvements CMCs

14/10/2015 CIPM MRA Workshop 2015, BIPM 5

slide-6
SLIDE 6
  • CCs define a set of “core competences” or “anchor

points”, where comparisons are still performed

  • Trust with other measurements within a certain range around

the anchor point

  • Number of participants in KCs is reduced
  • Strict deadlines are set and enforced
  • Consider concept of “on-going comparisons”

Improvements Comparisons

14/10/2015 CIPM MRA Workshop 2015, BIPM 6

slide-7
SLIDE 7
  • We can look back on 15 years of mutual trust

building within the MRA formalism

  • Transition from a system of 100% checking that is

building upon the trust generated in Phase I of the MRA. Change of principles: MRA Phase II

14/10/2015 CIPM MRA Workshop 2015, BIPM 7

slide-8
SLIDE 8
  • New CMC entries are only discussed within RMO of
  • rigin
  • Appeal mechanism open for all RMOs and signatories
  • f the CIPM MRA against CMC entries (special rules

for new participating RMOs/NMIs/DIs possible)

  • Appeal decided by body-to-be-defined (e.g. JCRB)
  • Alerting mechanism “What is new in the KCDB”

MRA Phase II: CMCs

14/10/2015 CIPM MRA Workshop 2015, BIPM 8

slide-9
SLIDE 9

14/10/2015 CIPM MRA Workshop 2015, BIPM 9

Thank you for your attention

www.euramet.org