  1. Central District Retail Phase I Site Plan #90 SPRC 3 December 14, 2017 12/14/2017 0

  2. Agenda Follow Up Items • Garage Volumes • Parking Circulation • Public Art & Sculpture: Potential Locations • North South Connection • Theater Architecture • Grocer Architecture • Potential Existing 1550 Treatment • Square Footage Calculations: Green & Impervious New Items • Street & Sidewalk Sections • Block Sizing • Underground Network GFA • Community Benefits • Construction 12/14/2017 1

  3. Follow-Up Items 12/14/2017 2

  4. 12/14/2017 3

  5. Public Art & Sculpture: Potential Locations 12/14/2017 4

  6. North South Connection 12/14/2017 5

  7. North South Connection 12/14/2017 6

  8. Theater Architecture 7

  9. Theater Architecture 8

  10. Theater Architecture 9

  11. Theater Architecture 12/14/2017 10

  12. Theater Architecture 11

  13. Grocer Architecture 12/14/2017 12

  14. Grocer Architecture 13

  15. Grocer Architecture 14

  16. Grocer Architecture 15

  17. Potential Existing 1550 Treatment 12/14/2017 16

  18. SF Calculations – Green vs. Hardscape Full Block Existing Public SF Private SF Total Existing Ground Level Green 6,865 62,910 69,775 Ground Level Impervious 34,435 99,670 134,105 Rooftop Level Green 0 0 0 Rooftop Level Impervious 0 58,030 58,030 Total 41,300 220,610 261,910 Full Block Proposed Public SF Private SF Total Ground Level Green 34,725 24,040 58,765 Proposed Ground Level Impervious 54,325 35,900 90,225 Rooftop Level Green 0 26,970 26,970 Rooftop Level Impervious 0 85,950 85,950 Total 89,050 172,860 261,910 Adding 47,750 SF total of Public Space; 28,000 SF is Green 12/14/2017 17

  19. New Items 18 12/14/2017 18

  20. Street & Sidewalk Sections 12/14/2017 19

  21. Street & Sidewalk Sections 12/14/2017 20

  22. Street & Sidewalk Sections 12/14/2017 21

  23. Block Sizing 250’ 830’ 300’ 240’ 250’ 500’ 500’ 345’ 350’ 300’ Crystal City – Del Rey Old Town Clarendon Georgetown Central District Retail Phase I 12/14/2017 22

  24. Block Sizing 1 1 Existing Metro Entrance 2 Proposed Metro Entrance 3 Underground 4 Mt. Vernon Trail Water Park 5 VRE Station 6 3 2 ~256’ Water Park 6 ~192’ 12/14/2017 23 4 5

  25. Underground GFA Calculation Underground Network ~110,000 SF “Recognizing the value of this existing system, it is recommended to preserve its connectivity over- time with the understanding that the current layout may need to be modified to support the area’s redevelopment.” – Crystal City Sector Plan Section 3.6.4, Page 52 12/14/2017 24

  26. Community Benefits • Provision of Grocer • Provision of Theater • Crystal Drive and 15th Street Streetscape Improvements • Street Dedications to Arlington County • Public Art • TDM 12/14/2017 25

  27. Construction Phasing Area B Area A 12/14/2017 26

  28. Site Circulation – G4 Level 12/14/2017 39

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.