Energy Outlook and Government Policy for Alternative Fuel CBG as Alternative Fuel for NGV CBG Business Chain CBG Project in Remote Area Conclusion 2 Energy Outlook and Government Policy for Alternative Fuel 3 Oil & Gas Balance
Conclusion CBG Project in Remote Area Energy Outlook and Government Policy for Alternative Fuel
2
CBG as Alternative Fuel for NGV CBG Business Chain
3
Energy Outlook and Government Policy for Alternative Fuel
Indigenous (20%) Imported Refined Petroleum Products 76 KBD 859 KBD (**)
Source: PTIT
Remark : (*)Refined product from refineries= 1000 KBD, including domestic supply of LPG from GSPs and Petrochemical Plants = 103 KBD (**) Not included Inventory KBD = Thousand Barrels per day
Import (80%)
Crude/ Condensate 872 KBD Refined Products 1000 KBD*
Domestic
Crude/ Condensate 211 KBD
Supply Production Sales
Export 235 KBD
948 KBD 238 KBD
Total Refining Capacity in Thailand: 1,087 KBD
PTT’s Associated Refineries : 910 KBD (TOP, PTTGC, SPRC, IRPC, BCP)
Other Refineries : 177 KBD (ESSO)
Refined Products 208 KBD 4
Oil & Gas Balance Operational Results Financial Performance Economic & Market Outlook
Crude Export 27 KBD
6
25,000 ktoe or 25% replacement of total energy demand in 2021
Source: Department of Alternative Energy Development and Efficiency ktoe
Alternative Energy Development Plan (AEDP: 2012 – 2021) Target 25% of RE in Total Energy Consumption By 2021
Electricity Sector (KTOE)
Wind Solar Hydro Bio Mass Bio Gas Garb age
202 336 85 2508 2060 180
5,370 KTOE Thermal Sector (KTOE)
Solar Bio Mass Bio Gas Garbage
100 8500 1000 200
9,800 KTOE Transportation Sector (KTOE)
Ethanol Bio- diesel CBG BHD 2447 2265 3807 944
9,463 KTOE
Government Funding On R & D Activities Private-Led Investment
Committed to the development
- f low-carbon society
Source: Department of Alternative Energy Development and Efficiency
Transportation Electricity Generation Thermal Target: 2,060 Ktoe Target: 1,000 Ktoe Target: 3,807 ktoe
Biogas
(6,867 Ktoe)
10
CBG as Alternative Fuel for NGV
NGV World Review
100,000 200,000 300,000 400,000 500,000 600,000
1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000
ม.ค. 50 เม.ย. 50 ก.ค. 50 ต.ค. 50 ม.ค. 51 เม.ย. 51 ก.ค. 51 ต.ค. 51 ม.ค.52 เม.ย.52 ก.ค. 52 ต.ค. 52 ม.ค. 53 เม.ย. 53 ก.ค. 53 ต.ค. 53 ม.ค. 54 เม.ย. 54 ก.ค.-54 ต.ค.-54 ม.ค.-55 เม.ย.-55 ก.ค.-55 ต.ค.-55 ม.ค.-56 เม.ย.-56 ก.ค.-56 ต.ค.-56 ม.ค.-57
2007 2008 2009 2010 2011 2012 2013
1,016 2,910 4,217 5,872 6,767 7,998 8,434
55,86 8
127,735 162,023 225,668 300,581 374,857 438,821
- No. of NGVs (Vehicles)
CNG Volume (ton/day)
11 55,868 9,056
Number of NGV stations 167 303 391 428 469 483 490 491
443,595 Feb,2014 11
PTT NGV Business :
Natural Gas Transmission Pipeline
Compressor Compressor NGV Trailer Dispenser Dispenser Dispenser NGV Trailer Compressor
Three Types of NGV Station 1. Mother Station (M) 2. Daughter Station (D) 3. Conventional Station (C)
NGV Stations in Thailand*
- Mother: 20 stations
- Conventional: 119 stations
- Daughter: 355 stations
M-D Distance (km) Transportation Cost** (Baht/kg) 250 3.88 300 4.65 350 5.43 400 6.20 450 6.98 500 7.75 * 15 may 2014 ** At diesel price = 29 Baht/Liter
Mother Station (M) Daughter Station (D) Conventional Station (C)
- 3. Reduce loss burden by
managing NGV Cost
- 2. Direct sale from
natural gas pipelines
- 1. Reflect NGV price at
the actual cost
- 2 small LNG
plants in Thailand
- 1st LCNG station
in Chiangmai
- Carrying more gas per
round of transportation
PAST
Multi Tank Trailer (20, 40 Feet) Capacity 2 – 3 Tons
PRESENT
- Jumbo Tube: 5.4 Tons
- Neo Gas: 4 Tons
- Long Tube: 4.3 Tons
Northern Line to Nakhon Sawan: 250 km North Eastern Line to Nakhon Ratchasima: 170 km
Solution to high CNG transportation cost
New CNG Trailer
LNG CBG
Expanding NG pipeline
- Develop CBG Project
from livestock in Northern
- f Thailand to reduce cost
- f transportation
Support Government Policy
- n Alternative Energy
Value added to Biogas Application Reduce Transportation Cost of NGV to Remote Area
Remote NGV Daughter Station
NGV Mother Station
CBG Produced near by
300 – 400 km 30 – 40 km
PTT : TAGNOC
Technologically Advanced and Green National Oil Company
16
CBG Business Chain
Swine Cattle Palm Oil Starch Waste Water 0.2 m3 Waste Water 0.06 m3 Waste Water 0.17 m3 Waste Water 0.2 m3
1 Nm3 of Raw Biogas @ 55% CH4 0.5 kg of CBG @ 88% CH4
Biogas 1 Nm3
Source: Department of Alternative Energy Development and Efficiency
1 Nm3 >>> 0.5 kg CBG Potential
- Biogas 2,935 mil Nm3
≈ CBG 1.463 mil tons Existing
- Biogas 577 mil Nm3
≈ CBG 0.288 mil tons
Source: Journal of Sustainable Energy & Environment Special Issue (2011) p.63-65
- At least 35 Biogas Plants were identified as a high potential source for CBG
- With a production of more than 12,000 Nm3 of raw biogas/day
- Mainly in Palm Oil and Tapioca Starch Industry
Source: Energy Research Institute Chulalongkorn University
1.5 MHA 0.72 MHA
Upgrader & Compressor Processing Plant CBG Cost Element
6.43 6.85-7.10
0.04-1.17 2.29+Vat7%
Reactor
- Upgrading Technology with
compressor 5MB, invest WS 75 MB : 3.89b/kg, O&M 3MB/y: 3.37b/kg
- Exclude municipal tax, Margin
- New daughter 2.29 baht/kg
- Biogas cost compare with profit from
selling electricity
- Biogas 12,000 m3/d Electricity 1 MW
- Generator Investment 30 MB
- O&M 0.35 baht/kWh
- Project Life 15 Years
CNG Station Agricultural Waste Assump tion Digester Raw Material
Size based
- n volume
to supply electricity 1MW
RTI CU
CBG Transport +0.0167 x Km
Supplier/CU
16.70-18.18
+0.018 x Km
- Can be pipeline :
0.8MB/1km and truck : 1.17b/kg +0.0167xkm
20
Processing Plant with comp. Processing Plant w/o comp. P/L transport Truck transport
7.10 6.85 0.04 1.17 2.29 + vat 2.29 + vat
1.38
Diff
CU
6.43
Water Scrubber Chemical Scrubber Membrane Contactor
- Quick win! With some
- ptimization on
- perating condition
,based on existing technology, to match with Thailand’s NG specification
- Easy to operate with no
chemical required
- Basic fundamental of
Absorption
- Higher selectivity
- Preparation for future regulation which
might be more stringent on both product specification and emission
- New reactor type to replace
conventional packed column
- Reduce the size 1/3
- Design of Biogas Upgrading Unit based on “Water Scrubber
Technology” has been developed
- FEED Study has been done to estimate the cost (plant capacity, 3
Tons of CBG/day)
- Issuing equipment specification & vendor list
- Develop operating manual
Section Cost (Million Baht) TOTAL DIRECT COST 15.61 Overhead & Profit (10%) 1.56 TOTAL DIRECT + INDIRECT COST 17.18 VAT (7%) 1.20 GRAND TOTAL 18.38 NPV
- 41.47 Million Baht
PMT
- 5.45 Million Baht
Processing Cost 6.06 Baht/kg CBG
CBG Project in Remote Area
Objectives:
1. Introducing Compressed Bio-methane Gas (CBG) as Alternative Fuel to Remote Area 2. Reducing NGV Operating Cost
26
- Collaborates with UAC Global (Public)
Co., Ltd.
- Raw Materials
- 34,000 Swine Farm Wet Swine
Manure 65 TPD
- Crushed Fresh Napier Grass 6-15
TPD
- Amount of Raw Biogas Produced 11,000
Nm3/d
- Amount of CBG Produced 6.5 TPD
- Project Duration 15 Years
- Start Commercial Phase: August 2013
27
- Business Model
High Pressure Compressor (200-250 bar) Biogas Upgrading Unit Anaerobic Digester Raw Material CBG / CNG Truck Trailer NGV Service Station
PTT UAC Global (Public) Co., Ltd.
CBG Ground Storage
380 km 50 km
CBG Plant Lankrabue NGV Mother Station
- Current Project Status
- Accumulated 29,480 kg of CBG Transported to NGV Service Station
until Now
- The Quality of CBG Produced has been Complied with Natural Gas
Vehicle (NGV) Specification for NGV, issued by Department of Energy Business, Ministry of Energy
- Main Problem/Obstacle
- Waste management
- Raw material supply shortage
- Equipment breakdown (Anaerobic Digester Tanks)
30
Project Overview :
- TRC proposed to sell CBG that will be produced from palm
- il mill plant waste water to PTT at minimum amount of
6.25 TPD, 300 days per year.
- Palm oil mill plant owned by Palm Power Green Co., Ltd.
located in Prachuap Khiri Khan Province.
- CBG plant will be constructed, operated and maintenance
by TRC and located the area of palm oil mill plant.
- Treated biogas will be compressed to PTT’s truck trailer and
transported to NGV station located in the area nearby the CBG plant.
- Project purpose :
- Increasing NGV supply and Introducing CBG as
Alternative Fuel to Remote Area
- Reducing NGV Operating Cost, Especially Transportation
Cost
- At Present, CBG Sales Agreement have been being
developed by PTT together with TRC.
Palm Oil Mill Plant
Palm Power Green Co., Ltd.
Anaerobic Digester Palm Oil Plantation Palm Oil Mill Plant Palm Oil Product
waste water
Palm Power Green Co., Ltd.
Anaerobic Digester Biogas upgrading CBG compressor
TRC Engineering & Construction Co., Ltd.
Palm Oil Plantation Palm Oil Mill Plant Palm Oil Product
waste water
Raw Biogas
Palm Power Green Co., Ltd.
Anaerobic Digester Biogas upgrading CBG compressor
TRC Engineering & Construction Co., Ltd. PTT
CNG Trailer NGV Station Palm Oil Plantation Palm Oil Mill Plant Palm Oil Product
waste water
Raw Biogas
CBG
35
Ratchaburi Mother Station
2nd NGV Station 1st NGV Station
Palm Oil Mill Plant Palm Power Green Co. Ltd. (CBG Plant)
2nd NGV Station 1st NGV Station
NGV Station Plam Power Green Co. Ltd.
Ratchaburi NGV Mother Station CBG Plant NGV Service Station
in Prachaup Khiri Khan Province Cost Elements :
- CBG Price
- Transportation Cost
Cost Elements :
- Natural Gas Cost
- Mother Station Investment & Operating Cost
- Transportation Cost
Local Benefit
- Encourage local cooperative and increase self-sufficiency for local consumption
- Have option for alternative fuel
- Encourage local awareness of renewable energy
- Reflect realistic cost enable project feasibility (competitive market)
- Private sector has opportunity to invest in CBG business chain
- Opportunity for potential local to reduce their cost of fuel
Country Benefit
- Support growing demand for renewable energy for
- National security of supply
Gov’t Support
- Issue financial privileges for private sector (e.g. tax incentive, subsidy, and etc)
- Agricultural land mgt. / crop for energy & food mgt.
- Provide educational and technical support
- R&D in CBG to accomplish most efficient methodology
38
Conclusion
39
CBG is potential product but it can’t compete with other conventional transportation fuels (Diesel and NGV) . To promote CBG, government shall support in both policy and funding. R&D of biogas upgrading technology should be promoted to reduce the upgrading cost. CBG plant should be located next to the NGV/CBG service station or public highway to reduce the transportation cost. Seasoning of the agricultural product will threatening CBG business.
41
CBG Quality Compared with CNG and European Bio-methane Specs.
No Parameter CBG Compliance CNG Spec. Sweden Spec. Netherland Spec. Sample1 Sample2 Sample3 average 1 Wobbe Index (MJ/m3) 39.89 39.30 40.15 39.78
37-42 2 Hydrocarbon dew point @4,500 kpa (C)
-
< 15.5 3 Water dew point @20,000 kpa (C)
- 10.7
- 10.7
- 10.7
- 10.7
< 9.2
4
Methane Number 108.4 108.4 108.4 108.4
≥ 65 5 CO2 (%vol) 7.84 10.30 7.48 8.54
≤ 18 6 H2S (mg/m3) < 0.4 < 0.4 < 0.4 < 0.4
≤ 23 < 5 7 Total sulfur (mg/m3) <1 ppmv <1 ppmv <1 ppmv <1 ppmv
≤ 50 < 23 < 45 8 H2 (%vol) < 0.01 < 0.01 < 0.01 < 0.01
≤ 0.1
- < 12
9 O2 (%vol) 0.45 0.31 0.45 0.40
≤ 1 < 1 < 0.5 10 NH3 (mg/m3) < 0.14 < 0.14 < 0.14 < 0.14
< 20 < 3 11 Total Cl (mg/m3) < 3 < 3 < 3 < 3
< 50 12 Total F (mg/m3) < 3 < 3 < 3 < 3
< 25 13 Mercaptan Sulfur(mg/m3) < 1.5 < 1.5 < 1.5 < 1.5
- < 10
14 Total Si (ppmv) <1 mg/m3 <1 mg/m3 <1 mg/m3 < 1 mg/m3
- < 5
15 Hg (µg/m3) 0.0078 0.0139 0.0102 0.0106
16 VOCs (ppmv) <1 <1 <1 <1
< 500 17 Dust (mg/m3) < 2 < 2 < 2 < 2
Supply Application
Source : Energy Statistics, Energy Planning and Office, Ministry of Energy, Thailand
Production/ Transportation
5,082 MMSCFD
43
Gulf of Thailand (76%)
On-shore fields (4%)
- 1. Domestic
80%
LNG (2%)
- 2. Import
Myanmar (18%)
20%
- 3. Industry
(14%)
- 2. Petrochemical
& LPG
(20%)
- 1. Electricity
(59%)
- 4. Transportation /NGV
(7%)
Natural Gas Pipeline System
(As of Sept, 2013)
Ratchaburi NGV Mother Station CBG Plant NGV Service Station
in Prachaup Khiri Khan Province Cost Elements :
- CBG Price
- Transportation Cost
“ Cost Saving 2-3 Baht/kg or 3.6 – 5.4 Million Baht/Year ”
Cost Elements :
- Natural Gas Cost
- Mother Station Investment & Operating Cost
- Transportation Cost
45
“Opportunity cost of biogas is the selling electricity produced from biogas”
NPV of electricity selling Net Profit = NPV of Raw Biogas Selling
Raw Biogas 1Nm3
Generator
(η 38%)
Electricity 2.027 kW
Raw Biogas 1Nm3
NPV Biogas Price Need to be competitive
Pre Economic Assessment
Assumption
- Project Life: 15 years
- Discount Rate: 10 %
- Plant Availability: 300 days/year
- Electricity Cost: 3.5 Baht/kWh
- Water Cost: 10 Baht/Nm3
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Investment 18.38 Operating Expense 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 2.43 Maintenance 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 TOTAL
- 18.38 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03 -3.03
NPV
- 41.47 Million Baht
PMT
- 5.45 Million Baht
Processing Cost 6.06 Baht/kg CBG
CBG is potential product but its cost is still high and difficult to compete with other conventional transportation fuels (Diesel and NGV) that the price have been regulated. To promote CBG as an Alternative Fuel in transportation sector, government shall support in both policy making and funding such as lower tax or tax exemption, financial support in investment and adder etc. Local research and development of biogas upgrading technology should be promoted to reduce the upgrading cost. Source of raw materials and CBG plant should be located next to the NGV/CBG service station or public highway to reduce the transportation cost. Main obstacle in biogas from agricultural waste development to CBG is agricultural products such as palm, tapioca, sugar cane
- etc. have the harvesting season.