Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL - - PowerPoint PPT Presentation

cadm admium ium le lead ad
SMART_READER_LITE
LIVE PREVIEW

Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL - - PowerPoint PPT Presentation

Spo pokane ane Ri River er Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL Purpo rpose se and nd Ob Obje jectiv ctives es Spok okane e Ri River er Metals als TMDL MDL WAG G meeting ting By: y: Rober


slide-1
SLIDE 1

Spo pokane ane Ri River er Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL

Purpo rpose se and nd Ob Obje jectiv ctives es Spok

  • kane

e Ri River er Metals als TMDL MDL WAG G meeting ting By: y: Rober bert t St Stee eed, IDEQ , Surface ace Water er Ecolo

  • logi

gist st April il 5, 2016

slide-2
SLIDE 2

Spokane River Metals TMDL Watershed Advisory Group Meeting

  • Idaho DEQ Coeur d'Alene Regional Office
  • 4/5/2016
  • 1:00 PM to 3:55 PM
  • Osprey Conference Room
  • 2110 Ironwood Parkway
  • Coeur d'Alene ID 83814
  • http://www.deq.idaho.gov/regional-offices-

issues/coeur-dalene/basin-watershed-advisory- groups/spokane-river-wag/

2

slide-3
SLIDE 3

What is a TMDL (Total Maximum Daily Load)

3

slide-4
SLIDE 4

4

slide-5
SLIDE 5

5

slide-6
SLIDE 6

6

slide-7
SLIDE 7

Idaho Spokane River 303(d) Listing

  • 1994 303(d) List

– MTU (Metals (unknown))

  • 2010 Integrated Report

– Cadmium, mium, Lead, d, Zi Zinc, Phosphorus (Total)

  • ID17010305PN003_04 Spokane River -

Post Falls Dam to Idaho/Washington border

  • ID17010305PN004_04 Spokane River -

Coeur d'Alene Lake to Post Falls Dam

  • 2012 Integrated Report (no change

from 2010)

  • Proposed 2014 Integrated Report (no

change)

7

slide-8
SLIDE 8

TMDL Challenges

  • In 2000, the Total Maximum Daily Load for

dissolved metals in Surface Waters of the Coeur d’Alene Basin was approved by the EPA

  • In 2000, however, a petition was filed for

judicial review and for declaratory judgment claiming the TMDL was invalid for failure to comply with the formal rulemaking requirements under the Idaho Administrative Procedures Act procedure for rulemaking

8

slide-9
SLIDE 9

More TMDL Challenges

  • The district judge ruled the TMDL was

invalid for failure to comply with statutory guidelines

  • According to Idaho Code §39-3611, DEQ

must follow rulemaking provisions for any TMDLs for metals in the Coeur d'Alene River Basin, upstream from the headwaters of the Spokane River

9

slide-10
SLIDE 10

10

slide-11
SLIDE 11

Idaho Statute 39-3611

11

slide-12
SLIDE 12

12

slide-13
SLIDE 13

Existing Data (< 5yrs old)

  • Idaho DEQ and Coeur d’ Alene Tribe

(upstream)

– Coeur d’ Alene Lake Management Plan

  • USGS (upstream)

– Coeur d’ Alene Basin Environmental Monitoring Program (BEMP)

  • WA Dept. of Ecology (downstream)

– Water Quality Monitoring State Network

  • Stormwater and WWTP data

13

slide-14
SLIDE 14

Kaizen:

14

slide-15
SLIDE 15

Su Suggest est Ana naly lysis sis App pproach

  • Loa
  • ad

d Duration ation Curve e Pro rocess cess

– Modified to match hydrograph – 4 day averages for Chronic Criteria – All data compared to Acute Criteria

15

slide-16
SLIDE 16

16

slide-17
SLIDE 17

Suggested flow duration breaks

Rain n on Snow Ascen endi ding ng Descending cending Regulat ulated ed Draw down

slide-18
SLIDE 18

18

slide-19
SLIDE 19

19

slide-20
SLIDE 20

20

slide-21
SLIDE 21

21