cadm admium ium le lead ad
play

Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL - PowerPoint PPT Presentation

Spo pokane ane Ri River er Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL Purpo rpose se and nd Ob Obje jectiv ctives es Spok okane e Ri River er Metals als TMDL MDL WAG G meeting ting By: y: Rober


  1. Spo pokane ane Ri River er Cadm admium, ium, Le Lead ad an and d Zi Zinc c TM TMDL DL Purpo rpose se and nd Ob Obje jectiv ctives es Spok okane e Ri River er Metals als TMDL MDL WAG G meeting ting By: y: Rober bert t St Stee eed, IDEQ , Surface ace Water er Ecolo ologi gist st April il 5, 2016

  2. Spokane River Metals TMDL Watershed Advisory Group Meeting • Idaho DEQ Coeur d'Alene Regional Office • 4/5/2016 • 1:00 PM to 3:55 PM • Osprey Conference Room • 2110 Ironwood Parkway • Coeur d'Alene ID 83814 • http://www.deq.idaho.gov/regional-offices- issues/coeur-dalene/basin-watershed-advisory- groups/spokane-river-wag/ 2

  3. What is a TMDL (Total Maximum Daily Load) 3

  4. 4

  5. 5

  6. 6

  7. Idaho Spokane River 303(d) Listing • 1994 303(d) List – MTU (Metals (unknown)) • 2010 Integrated Report – Cadmium, mium, Lead, d, Zi Zinc, Phosphorus (Total) • ID17010305PN003_04 Spokane River - Post Falls Dam to Idaho/Washington border • ID17010305PN004_04 Spokane River - Coeur d'Alene Lake to Post Falls Dam • 2012 Integrated Report (no change from 2010) • Proposed 2014 Integrated Report (no change) 7

  8. TMDL Challenges • In 2000, the Total Maximum Daily Load for dissolved metals in Surface Waters of the Coeur d’Alene Basin was approved by the EPA • In 2000, however, a petition was filed for judicial review and for declaratory judgment claiming the TMDL was invalid for failure to comply with the formal rulemaking requirements under the Idaho Administrative Procedures Act procedure for rulemaking 8

  9. More TMDL Challenges • The district judge ruled the TMDL was invalid for failure to comply with statutory guidelines • According to Idaho Code §39-3611, DEQ must follow rulemaking provisions for any TMDLs for metals in the Coeur d'Alene River Basin, upstream from the headwaters of the Spokane River 9

  10. 10

  11. Idaho Statute 39-3611 11

  12. 12

  13. Existing Data (< 5yrs old) • Idaho DEQ and Coeur d’ Alene Tribe (upstream) – Coeur d’ Alene Lake Management Plan • USGS (upstream) – Coeur d’ Alene Basin Environmental Monitoring Program (BEMP) • WA Dept. of Ecology (downstream) – Water Quality Monitoring State Network • Stormwater and WWTP data 13

  14. Kaizen: 14

  15. Su Suggest est Ana naly lysis sis App pproach • Loa oad d Duration ation Curve e Pro rocess cess – Modified to match hydrograph – 4 day averages for Chronic Criteria – All data compared to Acute Criteria 15

  16. 16

  17. Suggested flow duration breaks ed Draw down ulated Regulat Rain n on Ascen endi ding ng Descending cending Snow

  18. 18

  19. 19

  20. 20

  21. 21

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend