Bond Farm H Hydrologi gical E Enhancem emen ent

60% 0% De Desi sign R Revi view

9/19/2018 Project Lead: SFWMD and FFWCC Impoundment Design by HDR and A.D.A. Engineering

slide-2
SLIDE 2

Regional Overview

slide-3
SLIDE 3

Project Overview

  • Broadly, the project goals are

to improve hydroperiods and water levels in Cecil Webb and Yucca Pens, which have been historically impaired by roads, farms, and developments.

  • The primary mechanisms for

improvement will be the conversion of the Bond farm and the Southwest Aggregates mine into water storage facilities, or flow equalization basins.

slide-4
SLIDE 4

Project Overview

  • Phase I – consists of the design
  • f the Bond Farm as a stand-

alone component

  • The flow-way toward US41 is

not being designed at this time, but is considered in terms of outfall placement

  • The average elevation is

around 24 ft NAVD. The target water elevation for the Water Storage Area is 28 ft.-NAVD.

2,800 2,600 2,400 2,200 2,000 1,800 1,600 1,400 1,200 1,000 800 600 400 200 28 27 26 25 24 23

slide-5
SLIDE 5

60% Design Presentation

  • Changes since 30% design:
  • Storage capacity revised from 2’ to 4’
  • Berm heights raised from elevation 28 ft.-NAVD to 32 ft.-NAVD.
  • Seepage ditch proposed on outside perimeter of the project
  • Seepage water to be re-circulated back to inflow pump
  • SW Discharge Structure Added (for future use)
  • Culvert proposed at Sal Grade Rd. and Oil Well Road to improve flow to the south
  • Wet well for inflow pump designed; electrical coming from Correctional Institute
  • Omission of emergency overflow spillway
  • SFWMD is performing electronic review of the plans, specifications, modeling
  • 2nd (and 3rd) Pre-application meetings held with FDEP in Ft. Myers and West Palm

Beach (6/28/18 and 7/11/18, respectively).

  • HDR met with Army Corp regarding wildlife impacts (8/16/18).
  • HDR met with Charlotte County 9/18/18 regarding Zoning, Stormwater and Land

Development Permits.

slide-6
SLIDE 6

Overall Plan Changes

slide-7
SLIDE 7
  • East Conveyance – a naturally
  • ccurring low spot will help

drain Cecil Webb into the Bond Farm

  • Northeast Conveyance – an

external ditch will route water toward both inflow locations

  • Northwest Inflow Structure –

this primary inflow location sits inside the existing SAL Grade ditch and will include a pump

Northern Bond Farm FEB

slide-8
SLIDE 8

FEB Cell Connectivity

  • A series of equalizer

culverts will connect the eastern cell with the western cell

  • 4 total equalizer

culverts

slide-9
SLIDE 9

Southern Bond Farm FEB

  • Southeast Conveyance
  • Located within the

existing SAL Grade ditch

  • Will direct flows exiting

Bond Farm south into the I-75 ditch as they do today.

slide-10
SLIDE 10

Proposed Levee

  • External Levee - 10’

wide top at elevation 32 ft.- NAVD

  • Improvements to

SAL Grade Road – 15’ wide top at elevation 30 ft.- NAVD

  • Some areas will

require fill, but most are close to elevation

Revised External Levee Cross-Section Revised Internal Levee Cross-Section

slide-11
SLIDE 11

East Conveyance

  • Inlet and culvert divert

water under the access road from Cecil Webb to an existing canal

  • Culvert under the

proposed levee will direct water from external canal to Bond Farm FEB

  • Flap gate allows one-

directional flow only (east to west)

  • Rip rap outfall will

reduce flow impacts

slide-12
SLIDE 12

Northeast Conveyance

  • Conveyance ditch outside

Bond Farm FEB

  • 15 ft. wide canal bottom
  • 2.5:1 side slopes
  • Bottom elev.: 20 ft.-NAVD
  • Top of Bank elev.: 25 ft.-NAVD
  • Connects existing eastern

canal with existing SAL Grade ditch

slide-13
SLIDE 13

Northwest Inflow Structure

  • 4ft culvert directs flows

from the external conveyance ditch to the internal Sal Grade ditch

  • Flap gate allows one-

directional flow only

  • Rip rap outfall will reduce

flow impacts

  • Submersible pump (10,000

GPM) will allow additional flows when dH is zero or less

slide-14
SLIDE 14

Southeast Conveyance

  • Concrete box culvert

under levee will discharge the Bond Farm FEB

  • 8’x5’
  • 70 linear feet
  • Sluice gate invert at

20.5 ft.-NAVD with 5 ft. max gate opening

slide-15
SLIDE 15

Southwest Discharge Structure

  • 10’x10’ overflow

concrete structure, top elevation 28.0 ft.-NAVD.

  • Twin 36” RCP, 121 LF

@0.15%

  • Capped at 5’ outside

property line

slide-16
SLIDE 16

Equalizer Culverts

  • Connects the SAL Grade

ditch in the eastern cell with the western cell

  • Allows cell water levels

to equalize

  • 4 locations
  • 36” concrete culverts
  • 85 linear feet under SAL

Grade Road

  • Inverts at 20.5 to 21.0 ft.-

NAVD

slide-17
SLIDE 17

Key Points

  • Levee at 32 ft.-NAVD with 10 to 15 foot top width
  • Inflow pump and one-directional culverts will move water from Cecil

Webb into Bond Farm Flow Equalization Basin

  • Existing SAL Grade Road and ditch will remain in place for accessibility
  • 4 equalizer culverts will keep cells on both sides of the road at similar or equal

elevations.

  • Outfall at south end of Bond Farm will continue to discharge to the

same location as today. (This goes to Prairie Pines Preserve)