Bond Farm H Hydrologi gical E Enhancem emen ent 60% 0% De Desi sign R Revi view 9/19/2018 Project Lead: SFWMD and FFWCC Impoundment Design by HDR and A.D.A. Engineering Regional Overview Project Overview Broadly, the project
SLIDE 2
SLIDE 3
Project Overview
- Broadly, the project goals are
to improve hydroperiods and water levels in Cecil Webb and Yucca Pens, which have been historically impaired by roads, farms, and developments.
- The primary mechanisms for
improvement will be the conversion of the Bond farm and the Southwest Aggregates mine into water storage facilities, or flow equalization basins.
SLIDE 4
Project Overview
- Phase I – consists of the design
- f the Bond Farm as a stand-
alone component
- The flow-way toward US41 is
not being designed at this time, but is considered in terms of outfall placement
- The average elevation is
around 24 ft NAVD. The target water elevation for the Water Storage Area is 28 ft.-NAVD.
2,800 2,600 2,400 2,200 2,000 1,800 1,600 1,400 1,200 1,000 800 600 400 200 28 27 26 25 24 23
SLIDE 5
60% Design Presentation
- Changes since 30% design:
- Storage capacity revised from 2’ to 4’
- Berm heights raised from elevation 28 ft.-NAVD to 32 ft.-NAVD.
- Seepage ditch proposed on outside perimeter of the project
- Seepage water to be re-circulated back to inflow pump
- SW Discharge Structure Added (for future use)
- Culvert proposed at Sal Grade Rd. and Oil Well Road to improve flow to the south
- Wet well for inflow pump designed; electrical coming from Correctional Institute
- Omission of emergency overflow spillway
- SFWMD is performing electronic review of the plans, specifications, modeling
- 2nd (and 3rd) Pre-application meetings held with FDEP in Ft. Myers and West Palm
Beach (6/28/18 and 7/11/18, respectively).
- HDR met with Army Corp regarding wildlife impacts (8/16/18).
- HDR met with Charlotte County 9/18/18 regarding Zoning, Stormwater and Land
Development Permits.
SLIDE 6
Overall Plan Changes
SLIDE 7
- East Conveyance – a naturally
- ccurring low spot will help
drain Cecil Webb into the Bond Farm
- Northeast Conveyance – an
external ditch will route water toward both inflow locations
- Northwest Inflow Structure –
this primary inflow location sits inside the existing SAL Grade ditch and will include a pump
Northern Bond Farm FEB
SLIDE 8
FEB Cell Connectivity
- A series of equalizer
culverts will connect the eastern cell with the western cell
- 4 total equalizer
culverts
SLIDE 9
Southern Bond Farm FEB
- Southeast Conveyance
- Located within the
existing SAL Grade ditch
- Will direct flows exiting
Bond Farm south into the I-75 ditch as they do today.
SLIDE 10
Proposed Levee
- External Levee - 10’
wide top at elevation 32 ft.- NAVD
- Improvements to
SAL Grade Road – 15’ wide top at elevation 30 ft.- NAVD
- Some areas will
require fill, but most are close to elevation
Revised External Levee Cross-Section Revised Internal Levee Cross-Section
SLIDE 11
East Conveyance
- Inlet and culvert divert
water under the access road from Cecil Webb to an existing canal
- Culvert under the
proposed levee will direct water from external canal to Bond Farm FEB
- Flap gate allows one-
directional flow only (east to west)
- Rip rap outfall will
reduce flow impacts
SLIDE 12
Northeast Conveyance
- Conveyance ditch outside
Bond Farm FEB
- 15 ft. wide canal bottom
- 2.5:1 side slopes
- Bottom elev.: 20 ft.-NAVD
- Top of Bank elev.: 25 ft.-NAVD
- Connects existing eastern
canal with existing SAL Grade ditch
SLIDE 13
Northwest Inflow Structure
- 4ft culvert directs flows
from the external conveyance ditch to the internal Sal Grade ditch
- Flap gate allows one-
directional flow only
- Rip rap outfall will reduce
flow impacts
- Submersible pump (10,000
GPM) will allow additional flows when dH is zero or less
SLIDE 14
Southeast Conveyance
- Concrete box culvert
under levee will discharge the Bond Farm FEB
- 8’x5’
- 70 linear feet
- Sluice gate invert at
20.5 ft.-NAVD with 5 ft. max gate opening
SLIDE 15
Southwest Discharge Structure
- 10’x10’ overflow
concrete structure, top elevation 28.0 ft.-NAVD.
- Twin 36” RCP, 121 LF
@0.15%
- Capped at 5’ outside
property line
SLIDE 16
Equalizer Culverts
- Connects the SAL Grade
ditch in the eastern cell with the western cell
- Allows cell water levels
to equalize
- 4 locations
- 36” concrete culverts
- 85 linear feet under SAL
Grade Road
- Inverts at 20.5 to 21.0 ft.-
NAVD
SLIDE 17
Key Points
- Levee at 32 ft.-NAVD with 10 to 15 foot top width
- Inflow pump and one-directional culverts will move water from Cecil
Webb into Bond Farm Flow Equalization Basin
- Existing SAL Grade Road and ditch will remain in place for accessibility
- 4 equalizer culverts will keep cells on both sides of the road at similar or equal
elevations.
- Outfall at south end of Bond Farm will continue to discharge to the