B ~ W ARD ' 'COUNTY FLORIDA 1$@Ml : MM (l Stantec EAC Consulting, - - PowerPoint PPT Presentation

b w
SMART_READER_LITE
LIVE PREVIEW

B ~ W ARD ' 'COUNTY FLORIDA 1$@Ml : MM (l Stantec EAC Consulting, - - PowerPoint PPT Presentation

B ~ W ARD ' 'COUNTY FLORIDA 1$@Ml : MM (l Stantec EAC Consulting, Inc. IN ASSOCIATION WITH r TIO l eac consult.com EAC by the Numbers 4 Florida Offices 2017 & 2018 Incorporated in Airports Served Employees


slide-1
SLIDE 1

B ~ W

ARD

' 'COUNTY

FLORIDA

EAC Consulting, Inc.

IN ASSOCIATION WITH

1$@M§l:MM (l Stantec

eacconsult.com

  • r• •••

TIO ••l

slide-2
SLIDE 2

EAC by the Numbers

Florida Offices

4

2017 & 2018

Incorporated in Airports Served Employees Professional Engineers

1994 7 88 27

IN ASSOCIATION WITH

2

slide-3
SLIDE 3

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Our Journey with Broward County Aviation Department

More than Twenty Years of Successful Partnership on Projects

► Terminal 4 Civil Works – Preliminary Concept Desi ► Right-of-Way Wetlands Identification and De ► Fencing Installation Design Services at North Perry A ► Rehabilitation of Taxiway N ► North Perimeter Road Water Main Improvements - Conceptua

Report and Design

► South Perimeter Road Force Main Improvements - Conceptua

Report and Final Design

► Westside Transmission & Distribution Water Ma ► Airport-wide Wayfinding Signage Improvements ► Development of BIM Standards ► East Perimeter Road Water Main Improvements ► Rehabilitation of Taxiway P ► Westside Water Main Improvements – Mater ► Water and Wastewater On-Call Services ► Taxicab and Limo Holding Lot ► Taxicab and Limo Holding Lot AVI Commun ► Gate 100/101 Lighting and CCTV Improvements ► Normal Power Load Study ► Eastside Water Main Improvements – Mater ► Pelican Hangars Structural Services ► Budget Rent A Car Facility Rehabilitation - Civil Engineering Design ► Storm water Master Plan ERP Permit ► Garage Entrance Roadway Demolition & Improvements ► Runway 9L 27R (EMAS) Design Services ► Airport Expansion Program Management Services ► 9R 27L Runway Over US-1 Feasibility Study + Prelim Design ► FEC Railroad Tracks Topographic Survey ► Landscaping Enhancement at North Perry Airport ► Fence Installation Design Services at North Perry Airport ► Rehabilitation of Runway 9L-27R (10L 28R) ► Relocation of FPL Overhead Power Lines at Taxiway C – East end

VOR - Relocation Project

► AEP Construction Trailer Compound at Boater’s Park ► Water Distribution System Master Plan ► Wastewater Collection System Master Plan ► Rehabilitation of Runway 18L-36R ► Wildlife Assessment Study ► Terminal 4 Hydrant Fueling System ► Demolition Package for Key Power Building ► Terminal 3 Vendor Space Utilities and Concourse F Stairs Removal

2001 – 2010 2011 – now 1991 – 2000

Access Roadway Design Improvements Stormwater/Drainage Master Plan ERP Modification meter Road Improvements ng Garage Repairs - Design Services Commuter Terminal Expansion ng Garage - Phase 2 - CIS Garage Access Roadways dge Foundations - Special Inspections Access Roadways (Design Build)

► Rent A Car (RAC) Bridges Design Services ► GTA Canopy Study ► Garage Access Signage & Roadway Improvements ► Concourse B and Apron B1 - ERP Permit Modification ► Terminal ► ► Peri ► Parki ► ► Parki ► ► Jet Bri ► Terminal

gn lineation irport l l in Improvements ials Testing ication Infrastructure ials Testing

IN ASSOCIATION WITH

3

slide-4
SLIDE 4

Q.1: Firm’s Experience with Airport Studies, Evaluations and Assessments

4

► FLL Water Distribution System Master Plan ► FLL Wastewater Collection System Master Plan ► FLL Terminal 4 Hydrant Fueling System ► FLL Normal Power Load Study ► FLL Wildlife Assessment Study ► FLL GTA Canopy Study ► FLL 9R 27L Runway Over US-1 Feasibility Study + Prelim Design ► FLL Concourse B and Apron B1 - ERP Permit Modification ► FLL Taylor Road/NE 10th Street Wetland Delineation Study ► FLL Development of BIM Standards Manual ► FLL Stormwater Master Plan ERP Permit Modification ► FLL AEP Construction Trailer Compound at Boater’s Park ► FLL Terminal 4 Civil Works Conceptual Design ► FLL North Perimeter Road Water Main Improvements – Conceptual Report ► FLL Water and Wastewater On-Call Services ► MIA Roof Top Traffic Calming Assessments & Design ► FLL South Perimeter Road Force Main Improvements – Conceptual Report

Prime Consultant with Unique Experience Relevant to Scope of Services described within the RFP and Specific to Airports and Aviation Facilities

IN ASSOCIATION WITH

slide-5
SLIDE 5

Q.1: Team’s Experience with Airport Studies, Evaluations and Assessments

5

► RSW Part 150 Noise and Airspace Program Study ► TPA Non-Aviation Airspace Analysis ► APF The Ivy Towers Airspace Analysis ► ATL Pavement Evaluation Program ► IAH Airfield Pavement Management Guide ► FLL Airfield Modifications Survey ► FLL Taxiway and Ramp Rehabilitation Survey ► FLL Terminal 4 Hydrant Fueling System Design Survey ► FLL Terminal 4 Civil Works Survey ► FLL Taxiway C West Reconstruction Survey ► HWO Master Plan Update ► MIA Monitoring Wells Survey ► MIA Utility Corridor Link Evaluation ► MIA Concourse A Utility Link Evaluation ► MCO GIS Evaluations and Assessments ► MCO Cost Estimating for South Terminal Complex Design ► MCO Cost Estimating for Airside 4 Improvement FIS/CBP

Wing Expansion

► MCO Cost Estimating for Airside 4 Improvement FA & HVAC

Replacement

► FLL Noise Monitoring ► FLL ANOMS & PQS Assistance ► TUL ALP Development ► HWO Master Plan and Airport Layout ► FLL FAR Part 150 Study Update ► YFC Assessment Study of Airside Physical Assets ► MIA CONRAC Fueling System Peer Review Support ► RSW Compatibility Land Development Code ► US Air Force Aviation Calibration Fuel System Studies ► South Carolina Aeronautics Commission Land Use Evaluation ► MIA - Westside Retention Pond Expansion ► MIA - South Terminal Expansion Project Office Trailer

Assessments

Team with Experience Relevant to Scope of Services described within the RFP and Specific to Airports and Aviation Facilities

IN ASSOCIATION WITH

slide-6
SLIDE 6

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Q.2: Firm’s Knowledge of and Experience at FLL and HWO

Prime Consultant with 50+ Individual Projects and Assignments at Both Facilities

Fort Lauderdale-Hollywood Intl. Airport (FLL)

► Budget Rent A Car Facility Rehabilitation - Civil Engineering Design ► Stormwater Master Plan ERP Permit ► Garage Entrance Roadway Demolition & Improvements ► Runway 9L 27R (EMAS) Design Services ► Airport Expansion Program Management Services ► 9R 27L Runway Over US-1 Feasibility Study + Prelim Design ► FEC Railroad Tracks Topographic Survey ► Relocation of FPL Overhead Power Lines at Taxiway C - Eastend VOR -

Relocation Project

► AEP Construction Trailer Compound at Boater’s Park Preliminary Evaluation ► North Perimeter Road Water Main Improvements - Conceptual Report and

Design

► South Perimeter Road Force Main Improvements - Conceptual Report and

Design

► Westside Water Main Improvements ► Development of BIM Standards ► East Perimeter Road Water Main Improvements ► Westside Water Main Improvements – Materials Testing ► Water and Wastewater On-Call Services and Miscellaneous Meetings ► Taxicab and Limo Holding Lot ► Taxicab and Limo Holding Lot AVI Communication Infrastructure ► Gate 100/101 Lighting and CCTV Improvements ► Normal Power Load Study ► Eastside Water Main Improvements – Materials Testing ► Water Distribution System Master Plan ► Wastewater Collection System Master Plan ► Terminal 4 Hydrant Fueling System ► Terminal 4 Civil Works Conceptual Design ► Right-of-Way Wetlands Identification and Delineation ► Terminal 3 Vendor Space Utilities and Concourse F Stairs Removal

Terminal Access Roadway Design Improvements

► Perimeter Road Improvements ► Parking Garage Repairs - Design Services ► Commuter Terminal Expansion ► Parking Garage - Phase 2 - CIS ► Stormwater/Drainage Master Plan - ERP Modifications ► Garage Access Roadways ► Jet Bridge Foundations - Special Inspections ► Terminal Access Roadways (Design Build) ► Rent A Car (RAC) Bridges Design Services ► GTA Canopy Study ► Garage Access Signage & Roadway Improvements ► Concourse B and Apron B1 - ERP Permit Modification

North Perry General Aviation Airport (HWO)

► Rehabilitation of Runway 9L-27R ► Rehabilitation of Runway 18L-36R ► Landscaping Enhancement at North Perry Airport ► Pelican Hangars Structural Services ► Fence Installation Design Services at North Perry Airport ► Fencing Installation Design Services at North Perry Airport ► Demolition of Key Power Building at North Perry Airport ► Rehabilitation of Taxiway N ► Airport-wide Wayfinding Signage ► Rehabilitation of Taxiway P

IN ASSOCIATION WITH

6

slide-7
SLIDE 7

B ~

ARD

COUNTY

FLORIDA

N

RTH PERRY AIRPORT

BROWARD COUNTY, FLORIDA FLORIDA DEPARTMENT OF TRANSPORTATION

2013 qenera[}l.viation}l.irport

<Preserttea to tfie

!Nortli (perry jf_ irport

In reco9nition of

  • utstamfi119 acliievemeuts in aitport

aestfietics, safety a11a service in tfie State of 'Fforiaa at

<Broward County C}enera(;4:viation)f.irport of tfie "ff? /) _

a._Ls:s::< ~

)lanm J{. Smitli State}lviat.io11 :Manager

)111antfi <Prasad, P/E.

Secretary

EAC Consulting, Inc. eacconsult.com

·~ 1 lf§@l:!tjfl I NTERNA T ION AL ()

Stantec

Firm’s Experience at FLL and HWO

IN ASSOCIATION WITH

7

slide-8
SLIDE 8

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Presentation Outline – RFP Evaluation Criteria

  • Criterion 1.1
  • Criterion 1.2

8

  • Criterion 2
  • Criterion 3
  • Criteria 4.1 to 4.7
  • Criterion 5

Ability of Professional Personnel Project Approach Past Performance Specialized Experience & Capabilities Workload of the Firm

IN ASSOCIATION WITH

slide-9
SLIDE 9

Criterion 1 / OUR PROJECT TEAM

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

9

slide-10
SLIDE 10

IN ASSOCIATION WITH

10zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

100+ years of Aviation, Planning and Studies experience

Mark Kistler, PEzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

QA/QC

Aaron McDaniel, PE

Deputy Project Manager

Joe Martin, PE

Deputy Project Manager

David Dargie, PE

QA/QC

Our Project Team Leadership

1 2 3 4 5

C R I T E R I A

Donna Grace, PE

Project Manager

slide-11
SLIDE 11

Our Project Team – Expertise, Experience & Execution

Donna Grace, PE – Project Manager

  • 29 Years of Planning and Studies experience

Experienced BCAD Project Manager / Task Leader Strong Broward County Community involvement

  • Potable Water Distribution System Master Plan
  • Wastewater Collection System Master Plan
  • Development of BIM Standards for BCAD
  • Wayfinding Signage
  • Westside Water Main Improvements
  • Rehabilitation of Taxiway P
  • Taxi Holding Lot & AVI Communication Infrastructure
  • Terminal 4 Hydrant Fueling System
  • East Perimeter Road Water Main Improvements

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

11

slide-12
SLIDE 12

Our Project Team – Expertise and Experience

Supporting our Contract Manager will be Task Leaders and professional staff who are familiar with the RFP’s Scope of Work and are immediately available to address BCAD’s needs.

Our project team is focused on top level client service and quality deliverables.

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

12

slide-13
SLIDE 13

Our Project Team – Expertise and Experience

TEAM HIGHLIGHTS

  • National, Regional and Local Aviation Experience
  • Specific & Experience
  • Industry Recognition
  • Award Winning Projects
  • Publications / Technical Leadership

Our project team and leaders are focused on top level client service and quality deliverables.

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

13

slide-14
SLIDE 14

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Our Project Team – Key Staff Qualifications 26

YEARS OF EXPERIENCE

35%

AVAILABILITY

32

YEARS OF EXPERIENCE

40%

AVAILABILITY

25

YEARS OF EXPERIENCE

40%

AVAILABILITY

Mike Adeife, PE David Dargie, PE Mark Kistler, PE

P R I N C I P A L - I N - C H A R G E Q A / Q C Q A / Q C

(HWO) - Rehabilitation of Taxiway Papa (P) (BOS) - Reconstruction of Terminal C/E Alleyway (FPR) - Airport Drainage Design and Permit Applications (FLL) - New North Maintenance Facility Fire Suppression Pipeline (YFC) - Assessment Study of Physical Assets Study (SRQ) - Curbside Improvements (FLL) -RAC Facility Drainage Evaluation (BOS) - Runway 33L Engineered Materials Arresti (SPG) - Taxiway D Extension ng

30

YEARS OF EXPERIENCE

60%

AVAILABILITY

15

YEARS OF EXPERIENCE

60%

AVAILABILITY

Joseph Martin, PE Aaron McDaniel, PE

D E P U T Y P R O J E C T M A N A G E R D E P U T Y P R O J E C T M A N A G E R

(FLL) - SW 4th Ave. Reconstruction from SR-84 to FLL Perimeter Rd. (COI) - Runway 11-29 Safety Area Improvements (FLL) – FLL Perimeter Road Re-Alignment VQQ - Runway 18L-36R Rehabilitation Design (HWO) - North Perry Airport Perimeter Road Enhancements BKV - Aircraft Apron Design

IN ASSOCIATION WITH

14

1 2 3 4 5

C R I T E R I A

slide-15
SLIDE 15

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Our Project Team – Key Staff Qualifications

Rosana Cordova, PE

W A T E R / W A S T E W A T E R P L A N N I N G

25 YEARS OF EXPERIENCE 50% AVAILABILITY

Broward County Regional Reuse Master Plan Broward County Water and Wastewater Systems Annual Report Broward County Reclaimed Water Plant Expansion

Ronald Laurence, PE

A V I A T I O N F U E L I N G

25 YEARS OF EXPERIENCE 60% AVAILABILITY

(BMI), (TBN) & (KPCD) - Aviation Fuel System Design (NHDOT) - Fleet Fueling Facility Design AUTHOR - "Design for Compliance – Considering Life Cycle Issues in the Fuel System Design Phase".

Robert Ross, PE

S T O R M W A T E R P L A N N I N G

19 YEARS OF EXPERIENCE 65% AVAILABILITY

(SFWMD) - Big Cypress Basin Stormwater Master Plan (CBWCD) - Western C-11 Stormwater Master Plan Hiatus Road Bridge Hydraulics Report for C-13 Canal Crossing

Nathan Parish, PE

P A V E M E N T M A N A G E M E N T / E V A L U A T I O N S

15 YEARS OF EXPERIENCE 65% AVAILABILITY

(PNS) - Air Cargo Apron Expansion (PIE) - Terminal Apron Hardstand Expansion (SEF) Reconstruction of Runway 18-36

Ramon Borges, PE

E L E C T R I C A L / C O M M U N I C A T I O N S P L A N N I N G

24 YEARS OF EXPERIENCE 45% AVAILABILITY

(FLL) - Airport Taxi Cab and Limo Holding Lot AVI Communications Infrastructure (FDOT) - District-Wide ITS maintenance contract (MDX) - I-95 Dynamic Message Signs & Toll Sign Panel

Jamison Sloboden, PE

T R A N S P O R T A T I O N P L A N N I N G

24 YEARS OF EXPERIENCE 55% AVAILABILITY

(TDOT) - I-10 Corridor, San Antonio, Columbus, and Yoakum, Texas (ODOT) - On-Call Traffic Engineering Agreement Loop 1604 Traffic Analysis

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

15

slide-16
SLIDE 16

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Project Approach Criterion 2 / PROJECT APPROACH

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

16

slide-17
SLIDE 17

Project Approach

1 2 3 4 5 Achieve Project Scope and Objectives Deliver Ahead of Schedule Complete Assignments within budget while achieving Cost Savings in Deliverables Exceed BCAD’s Standard of Excellence. Satisfaction of Broward County

Success is Our Goal

C R I T E R I A

IN ASSOCIATION WITH

17

slide-18
SLIDE 18

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Project Approach

Project Implementation Process for Studies, Evaluations and Assessments

REGULATORY CRITERIA SCOPE DEFINITION DATA GATHERING PROJECT EVALUATION AND ASSESSMENT RECOMMENDATIONS AND CLIENT REVIEW FINALIZE DELIVERABLE

  • Objectives
  • Work Tasks
  • Schedule
  • Budget
  • Applicable

jurisdictions

  • Codes
  • Stakeholder

requirements

  • Ranking
  • Stakeholder

meetings

  • Expert reviews
  • CIP planning
  • Previous studies
  • Survey
  • Geotechnical
  • Field Visit
  • Modeling and

calibration

  • Field Testing
  • Alternative analysis
  • Cost benefit analysis
  • Value engineering
  • Reports
  • Technical

Memorandum

  • Final Presentations

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

18

slide-19
SLIDE 19

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Project Approach

Quality Assurance and Control

  • EAC prepares a project-specific QA/QC

plan for each project and Task Order

  • Sub consultants will be required to follow

the Plan

  • Sub Consultants submit QA/QC

Compliance Certification with deliverables

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

19

slide-20
SLIDE 20

Criterion 3 / PRIME VENDOR’S PAST PERFORMANCE

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

20

slide-21
SLIDE 21

Past Performance with Broward County Aviation Department

Average Evaluation Score Over the past 5 years, EAC has performed successfully on Broward County Aviation Department projects.

4.14

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

21

slide-22
SLIDE 22

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Past Performance with Other Clients

C R I T E R I A

“EAC’s engineering staff demonstrated knowledge,

experience and a high level of dedication.” Broward County Aviation Department Water and Wastewater Master Plan “…to acknowledge the excellent job that EAC Consulting,

  • Inc. has done for the City of Opa-locka for the Capital

Improvements Master Plan project.” City of Opa-locka Water, Wastewater, Stormwater Infrastructure Planning “…reference to EAC Consulting performance on our Stormwater Implementation Plan and to acknowledge the excellent job they are doing for the Village of Key Biscayne.” Village of Key Biscayne Stormwater Improvement Implementation Plan

1 2 3 4 5

IN ASSOCIATION WITH

22

slide-23
SLIDE 23

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA Criterion 4 / FIRM’S SPECIALIZED EXPERIENCE AND CAPABILITIES

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

23

slide-24
SLIDE 24

Specialized Experience and Capabilities

4.1

Experience with Local and Regulatory Agencies & Divisions

  • Strong Familiarity with Permit Agencies & Processes (SFWMD, BCEPGMD, BCWWS,

FDOT, FAA, FEMA & FDEP)

  • Served as Engineering Consultant for most of these Agencies
  • Early Coordination with Agencies
  • Seek and Solidify Concurrence on Technical Approach
  • Document Agreements

Broward County FDOT FEMA FDEP FAA SFWMD

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

24

slide-25
SLIDE 25

Specialized Experience and Capabilities

4.2

Broward County Land Development Code

Broward County Code of Ordinance - Article IX

  • Good Working Knowledge of Land Development Code
  • Development Permits (Major Reviews, Site Plan Reviews, etc.)
  • Experienced in executing Land Development Projects within Broward County

Florida Fire Prevention Code

Florida Statutes – Chapter 633.202

  • Strong Familiarity with FFPC
  • Combines NFPA 1 & 101 with amended local Florida requirements
  • Must meet safety requirements for habitable structures (lighting, ingress, egress,

sprinklers, carbon monoxide, etc.)

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

25

slide-26
SLIDE 26

Specialized Experience and Capabilities

4.3

Water Distribution & Transmission Hydraulic Network Analyses

  • Dedicated In-house Modeling Team with combined 50+years of Experience
  • Experienced in Water Hydraulic Modeling using InfoWater, EPANet, WaterCAD, etc., including ArcGIS
  • EAC performed all modeling for current FLL Airport Potable Water System Master Plan
  • Recommended Build-out Potable Water CIP Improvements

1 2 3 4 5

C R I T E R I A

IN ASSOCIATION WITH

26

slide-27
SLIDE 27

Specialized Experience and Capabilities

4.5

Wastewater Collection & Transmission Hydraulic Network Analysis

  • Dedicated In-house Modeling Team with Extensive Experience
  • Experienced in Wastewater Hydraulic Modeling using InfoSWMM, SewerCAD, etc., including ArcGIS
  • EAC performed all modeling for current FLL Airport Wastewater System Master Plan
  • Recommended Wastewater CIP Improvements

1 2 3 4 5

C R I T E R I A

IN ASSOCIATION WITH

27

slide-28
SLIDE 28

Specialized Experience and Capabilities

4.6

Stormwater Collection & Disposal Hydraulic Network Analysis

  • Experience In-house and Sub consultant team with over 100+years of combined experience
  • Experienced in Stormwater Collection & Disposal Modeling using ICPR4, XPSWMM, GEOPAK, ASAD, etc.
  • EAC performed the Stormwater Master Plan ERP Modification for Eastern Half of FLL incl. Exterior Lake

Expansion

  • EAC performed a subsequent Permit Modification for the Terminal Access Roadways Project
  • Performed Numerous Stormwater Master Plans for other clients

1 2 3 4 5

C R I T E R I A

IN ASSOCIATION WITH

28

slide-29
SLIDE 29

Specialized Experience and Capabilities

4.7

Electrical & Communications Master Plans

  • In-house Electrical & Communications Planning Expertise with

more than 60+years Experience

  • Experienced in Electrical & Communications Master Plans
  • Power Load and Distribution Modeling & Forecasting
  • Performed FLL Normal Load Power Study
  • Intelligent Transportation Systems Applications Expertise, e.g. AVI

Infrastructure for FLL Taxi Holding Lot

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

29

slide-30
SLIDE 30

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

BCAD

Criterion 5 / WORKLOAD OF THE FIRM

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

30

slide-31
SLIDE 31

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

Workload of the Firm

BCAD

We have the availability in our workload to continue providing service to BCAD.

40% 50% 60% 70% 80% 90% 100% 110% 120%

WORKLOAD AVAILABILITY September 2018 to August 2020

Full Staff Power Projected Workload

AVAILABILITY

C R I T E R I A 1 2 3 4 5

IN ASSOCIATION WITH

31

slide-32
SLIDE 32

Workload of the Firm

Approach to Managing Concurrent Projects

  • Multiple Teams with Diverse Capabilities
  • Utilization of Subconsultants
  • Multi-person Quality Control/Assurance Team
  • Integrated Schedule-based Workload Projections
  • Information Sharing
  • Project Management Plan and Work Plan Implementation
  • Formalized Document Control Process

C R I T E R I A 1 2 3 4 5

32

Resource Loaded Schedule

Real-Time Access Subconsultants Work Sharing Management

BCAD

EAC Design Team

Organizational Mobility in a Managed Environment

IN ASSOCIATION WITH

slide-33
SLIDE 33

zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA

The EAC Advantage

33

Qualified Staff

Working at FLL and HWO for over 20 years

Familiarity with Scope of Work

Extensive Airport Planning and Studies experience

Extensive Experience at FLL and HWO

Award-winning projects

Exceed County’s CBE Utilization Goal

20% Goal — 23% Commitment

Proven Performance

Average Evaluation Score greater than 4 out of 5

IN ASSOCIATION WITH

slide-34
SLIDE 34

The EAC Advantage

34

THANK YOU

IN ASSOCIATION WITH

slide-35
SLIDE 35

The EAC Advantage Grid

Qualified Staff Familiarity with Scope Proven Performance FLL & HWO Experience Exceed CBE Utilization

35

Criterion 1 Ability of Professional Personnel Criterion 2 Project Approach Criterion 3 Past Performance Criterion 4 Specialized Experience & Capabilities Criterion 5 Workload

IN ASSOCIATION WITH