S.E.S. Ptolemais Unit IV ans S.E.S kardia I,II x 300 MW
Power & Energy
Public Power Corporation 1992‐1993 Contract value: 23.053.008 € Greece Complete design and construction of all the
MW
necessary works to replace the Fly Ash Handling System and the auxiliary systems in two lignite power plants. Public Power Corporation (PPC) 1985‐1992 Contract value: 1.776.262 €
S.E.S. Megalopolis ‐ Unit IV (300 MW) Cooling Tower, Chimney, Machine House, E/M erection and Auxiliary Industrial Buildings
Greece – Megalopolis In a consortium the firm implemented the complete erection of this 300 MW unit , along with all the required equipment and systems. Public Water Corporation 1982‐1984
S.E.S. Agios Dimitrios ‐ Units III & IV , 2 x 300 MW
Contract value: 12.522.488 € Kozani, Greece Design & Construction of two natural draft cooling towers of 103 m height, and 71 m base diameter. Design & construction of 200 m high chimney,
- f reinforced concrete shell with diameter of