Asset Management in Kentucky Jon Wilcoxson, PE KYTC Division of - - PowerPoint PPT Presentation

asset management in kentucky
SMART_READER_LITE
LIVE PREVIEW

Asset Management in Kentucky Jon Wilcoxson, PE KYTC Division of - - PowerPoint PPT Presentation

Asset Management in Kentucky Jon Wilcoxson, PE KYTC Division of Maintenance Operations and Pavement Management Branch Historic Project Development Process Planning Design Construction Operations Project Development Cycle Operations


slide-1
SLIDE 1

Asset Management in Kentucky

Jon Wilcoxson, PE KYTC Division of Maintenance Operations and Pavement Management Branch

slide-2
SLIDE 2

Historic Project Development Process

Planning Design Construction Operations

slide-3
SLIDE 3

Project Development Cycle

Operations Planning Design Construction

slide-4
SLIDE 4

Project Development Cycle

Operations Planning Design Construction

Operations- Planning Link

slide-5
SLIDE 5

Operations-Planning Link

  • Quality Data to Define Needs
  • Define Objectives for Prioritization (Performance

Measures)

  • Improve Resource Allocation Decisions
slide-6
SLIDE 6

Defining Needs

  • Safety Analysis
  • Pavement Management
  • Bridge Management
  • Other Assets
slide-7
SLIDE 7

Defining Needs - Safety

High Friction Surface

Location

Crashes

Curve Data

Pavement Condition

slide-8
SLIDE 8

Defining Needs - Safety

Rumble Strips

Location

Crashes

Lane Width

Shoulder Width

Speed Limit

Auxiliary Lane Data

slide-9
SLIDE 9

Defining Needs - Safety

Roadway Departure Corridors

Location

Crashes

Functional Class

Speed Limit

# of Lanes

slide-10
SLIDE 10

Evaluation Process Preservation Treatments Programmed by Maintenance Rehab or Reconstruction Planning Process

Defining Needs – Pavements

Visual Ratings IRI Rutting Laser Crack Measurement

Operations-Planning Link

slide-11
SLIDE 11

Inspections Minor Rehabilitation Programmed by Maintenance Major Rehab

  • r

Replacement Planning Process

Defining Needs – Bridges

Operations-Planning Link

slide-12
SLIDE 12

Defining Needs – Other Assets

  • Sign Management
  • Pipe/Culvert Management
  • Guardrail
  • Cable Barrier
  • Striping
slide-13
SLIDE 13

KYTC Performance Measures

Area Measure SCOPM KYTC Safety Number of Fatalities  Fatality Rate  Number of Serious Injuries  Serious Injury Rate  Pavements Interstate Roughness  Non-Interstate NHS Roughness  Non-NHS Roughness  Pavement Structural Health  Bridges NHS Structurally Deficient Bridges  NHS Bridges in Good or Fair Condition  Non-NHS Structurally Deficient Bridges  Non-NHS Bridges in Good or Fair Condition 

slide-14
SLIDE 14

KYTC Performance Measures

Area Measure SCOPM KYTC Safety Number of Fatalities  Fatality Rate  Number of Serious Injuries  Serious Injury Rate  Pavements Interstate Roughness  Non-Interstate NHS Roughness  Non-NHS Roughness  Pavement Structural Health  Bridges NHS Structurally Deficient Bridges  NHS Bridges in Good or Fair Condition  Non-NHS Structurally Deficient Bridges  Non-NHS Bridges in Good or Fair Condition 

slide-15
SLIDE 15

Improving Resource Allocation

U n s c h e d u l e d N e e d s L i s t

  • O

v e r 2 4 p r

  • j

e c t s

  • O

v e r $ 6 B i l l i

  • n

i n C

  • s

t

  • A

p p r

  • x

i m a t e l y 6 3 m i l e s

Kentucky awards about $1 billion in transportation projects annually. Kentucky has 27,600 miles of state- maintained roadways.

slide-16
SLIDE 16

District Transportation Plans

slide-17
SLIDE 17

District Transportation Plans

slide-18
SLIDE 18
slide-19
SLIDE 19

District Transportation Plan District Transportation Plan Pavements Pavements Pavement Roughness Pavement Roughness Pavement Condition Pavement Condition Bridges Bridges % Structurally Deficient % Structurally Deficient % Good Fair Poor % Good Fair Poor Safety Safety Fatalities and Fatality Rate Fatalities and Fatality Rate Serious Injuries and Serious Injury Rate Serious Injuries and Serious Injury Rate

Operations-Planning Link

slide-20
SLIDE 20

District Transportati

  • n Plan

District Transportati

  • n Plan

Pavements Pavements Bridges Bridges Safety Safety Other Assets Other Assets Reliability Reliability CMAQ CMAQ

Other Inputs

slide-21
SLIDE 21

Next Steps

  • Fully Develop Pavement/Bridge Management Programs
  • Continue Development of Other Asset Management

Programs

  • Establish Targets for Performance Measures
  • Incorporate Risk