AN EXCITING EVOLUTION!
EASTMAIN RESOURCES INC. ER:TSX
CORPORATE PRESENTATION | FEBRUARY 2017
AN EXCITING EVOLUTION! EASTMAIN RESOURCES INC. ER:TSX CORPORATE - - PowerPoint PPT Presentation
AN EXCITING EVOLUTION! EASTMAIN RESOURCES INC. ER:TSX CORPORATE PRESENTATION | FEBRUARY 2017 FORWARD LOOKING STATEMENTS Certain information set forth in this presentation may contain forward-looking statements that involve substantial known
EASTMAIN RESOURCES INC. ER:TSX
CORPORATE PRESENTATION | FEBRUARY 2017
FORWARD LOOKING STATEMENTS
Certain information set forth in this presentation may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. Forward-looking statements consist of statements that are not purely historical, including statements regarding beliefs, plans, expectations or timing of future plans, and include, but not limited to, statements with respect to any potential director nominations, actions taken in respect
Company's properties, and the potential success of the Company’s future exploration and development
are beyond the control of Eastmain, including, but not limited to he results of matters to be considered at the upcoming annual and special meeting of shareholders of Eastmain, the impact of general economic conditions, industry conditions, dependence upon regulatory approvals, the availability of financing, timely completion of proposed studies and technical reports, and risks associated with the exploration, development and mining industry generally such as economic factors as they affect exploration, future commodity prices, changes in interest rates, safety and security, political, social or economic developments, environmental risks, insurance risks, capital expenditures, operating or technical difficulties in connection with development activities, personnel relations, the speculative nature of gold exploration and development, including the risks of diminishing quantities of grades of Mineral Resources, contests over property title, and changes in project parameters as plans continue to be refined. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. The Company assumes no obligation to update such information, except as may be required by law.
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 2
THE NEW EASTMAIN
ADVANCING ASSETS WITH THE POTENTIAL FOR RESOURCE GROWTH
THE TRIANGLE OF SUCCESS
KEY PROJECTS
CLEARWATER PROJECT
The Anchor Project: High-Grade Resource with Open-pit and Underground Potential
EASTMAIN MINE PROJECT
A Past-Producer with Historic Resources and Growth Potential
ÉLÉONORE SOUTH JV
Indicative Geochemical Signature
8 OTHER SIGNIFICANT LAND PACKAGES
Prospective Gold Potential Strategically Staked Claims
TOP LAND POSITION IN THE JAMES BAY GOLD DISTRICT
Total Land Package: 137,665 hectares Top Mining Jurisdiction Access to Roads and Power
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 3
EASTMAIN January 30, 2017
Shares outstanding 175,429,814 Options (W Avg Life - 6.83 yrs, $0.68) 10,803,605 Warrants (Expire 11/10/18 , $0.50) 6,899,999 Fully-Diluted 193,133,417 Market Capitalization (20-day VWAP) $89 million Share Price (20-day VWAP) $0.51 52 Week High/Low $0.97 - $0.29 Daily Average Volume (30 day avg) 620,463
CASH POSITION
FT Funds: $8.6 M as of January 30, 2017
CURRENT PROGRAM BUDGET INCL. G&A - MID-2017
CAPITAL STRUCTURE
TSX:ER
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 4
Beacon Securities - Mike Bandrowski Cormark Securities - Tyron Breytenbach Echelon Wealth - Ryan Walker GMP Securities - Ingrid Rico Laurentian Securities Mackie Research Capital - Barry Allan/Ryan Hanley Macquarie Capital - Michael Gray Paradigm Capital - Don Blyth
TOP SHAREHOLDERS Polygon 17.1 million 9.7% Goldcorp 10.5 million 6.0% Integra Gold 8.9 million 5.1% RBC Asset Management 7.7 million 4.4% Van Eck 7.4 million 4.2% Gabelli & Company 3.6 million 2.0% Don Robinson 2.7 million 1.6% Mackenzie Investments 2.6 million 1.5% Caisse du Depot (Sodémex) 2.6 million 1.5% US Global 2.3 million 1.3% Industrial Alliance Inv Mgmt 1.9 million 1.1% Commodity Discovery Fund 1.5 million 0.9% Industrial Alliance Insurance 1.4 million 0.8% Sentry 1.3 million 0.7%
ANALYST COVERAGE
CAPITAL STRUCTURE SHAREHOLDERS
TSX:ER
Insiders 2% Retail 49% Institutional & Major Shareholders 38% Goldcorp 6% Integra 5%
OWNERSHIP
TOP INSIDERS Claude Lemasson 1.0 million 0.6% Blair Schultz 1.0 million 0.6% Joe Fazzini 0.3 million 0.1% Mike Hoffman 0.2 million 0.1% Timo Jauristo 0.2 million 0.1% Laurie Curtis 0.1 million 0.1%
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 5
EVOLUTION OF THE BOARD AND MANAGEMENT
Claude Lemasson President & CEO and Director Laurence (Laurie) Curtis Chairman Michael Hoffman Mine Engineer & Executive Blair Schultz Capital markets experience WELL-ESTABLISHED BOARD OF DIRECTORS Timo Jauristo Geologist, ex-Goldcorp Corp Dev Exec Stephen De Jong Integra President & CEO George Salamis Integra Chairman INTEGRA TECHNICAL ADVISORS Previous experience with Management, the Éléonore Project (Goldcorp), & the James Bay region Hervé Thiboutot, Geological Engineer Integra Senior VP Jacques Simoneau, P.Geo. Integra Exploration Manager Claude Lemasson, P.Eng, MBA President & CEO
project in northern Québec Joe Fazzini, CPA, CFA, CA CFO & VP Corporate Development
base metal producers through PwC & Dundee Capital Markets. Alison Dwoskin, CPIR Manager, Investor Relations
MANAGEMENT TEAM Bill McGuinty, P.Geo VP Exploration
America, from exploration to environmental and feasibility studies Manuel Ng-Lai, P.Eng Project Engineer
Carl Corriveau, P.Geo, SEG Exploration Manager
project management and evaluation, advancing projects from exploration through economic studies
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 6
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 7
$96 $92 $81 $77 $77 $72 $63 $54 $48 $40
$37
$33 $0 $20 $40 $60 $80 $100 $120
Probe Metals Osisko Mining Auryn Resources Integra Gold Marathon Gold ATAC Resources Pure Gold IDM Mining Treasury Metals Victoria Gold Eastmain Resources Sabina Gold & Silver
EV Per Ounce (C$/oz)
VALUE OPPORTUNITY VS PEERS – EV/OZ
42% GROWTH TO MATCH PEER AVERAGE
AVERAGE $64 PER EV/OZ
Data compiled by Mackie Research based on most recent company financial reports, February 3, 2017. *Eastmain data Includes Clearwater MI&I mineral resources (June 2015) and Eastmain Mine historic resources (255,000 oz @ 10 g/t Au).
CENTRAL JAMES BAY GOLD CAMP
EMERGING GOLD DISTRICT Production
The Canadian Shield has produced over 200 million
Life Cycle
James Bay is one of the youngest camps in the Canadian shield
Exploration
Potential for many more discoveries as exploration advances
Development
Rapidly improved infrastructure to speed up pace of exploration
Chibougamau are located in Southern James Bay Source: Company reports, government studies, and academic journals.
Central James Bay Rice Lake Casa Berardi Detour Hemlo Chibougamau Red Lake Rouyn-Noranda Val D’or Kirkland Lake Timmins 7 2 3 23 21 7 28 20 30 45 74
Production & Reserves (Millions of Ounces) First Gold Pour (Year)
2014 2005 1988 1983 1981 1952 1930 1927 1923 1915 1909
District
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 8
SUPERIOR INFRASTRUCTURE IN A TOP JURISDICTION
EMERGING GOLD DISTRICT
Note: Clearwater is accessible via a commercial airport at Nemaska, located 80 kms south
Project, providing permanent road access to the Eastmain Mine project.
Ruby Hill Lac Lessard
Eastmain Mine
Route 167 Nord All-season road
Clearwater
Lac Hudson Reservoir Lidge Lac Elmer Radisson
Éléonore South JV
JAMES BAY REGION
50KM
Eastmain
James Bay
Mistissini Temiscamie Éléonore Mine Goldcorp Renard Mine Stornoway Troilus Mine Copper One Wemindji Waskaganish Chisasibi Nemaska Radisson
Lac Clarkie
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 9
137,655 hectares
CLEARWATER PROJECT
ADVANCED EXPLORATION ON THE EAU CLAIRE DEPOSIT
EAU CLAIRE: MINERAL RESOURCE ESTIMATE 1 Total Measured & Indicated: 951,000 oz @ 4.09 g/t Au - 7,225,000 tonnes Total Inferred: 633,000 oz @ 3.88 g/t Au – 5,072,000 tonnes
PROPERTY 51,614 hectares 30 person camp incl. full- kitchen, core-shack and cabins Hydro-power (20 kms away), road and nearby airports James Bay gold district greenstone belt, volcanics 100% ownership
Note 1. Technical Report for the Eau Claire Deposit, Clearwater Project by SRK Consulting (June 2015) filed
UPCOMING CATALYSTS Drilling results (1Q 2017) Mineral resource update (MID-2017) Preliminary Economic Assessment (END OF 2017)
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 10
Piano key breccia EM-1 power: 20 km from camp Clearwater’s 30-man camp
EAU CLAIRE MINERAL RESOURCE
OPPORTUNITY TO IMPROVE QUALITATIVE AND QUANTITATIVE DATA
More drilling data in next mineral resource update Q2 2017
13,000 metres - drilling from late 2015 63,300 metres - in progress - 2016 and early 2017
Note: 5,000 metres drilled in 2014 at the Clovis Lake target, Clearwater Project Approximate mineral resource outline, on Eau Claire deposit overview image.
EAU CLAIRE DEPOSIT OVERVIEW: LOOKING WEST 450 West Zone Outcrop on Hilltop OPEN PIT POTENTIAL
Eau Claire Mineral Resource Drilling
99,000 m drilled 2011-2013 0 m drilled 2014-2015 99,000 m drilled since 2011
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 11
2016-2Q2017 PLANNED DRILLING PROGRAM
PLAN VIEW
450 West Zone 850 West Zone
55,700 m EAU CLAIRE DRILLING PROGRAM
FOCUSING ON OPEN PIT AND SHALLOW UNDERGROUND POTENTIAL
2016 TO MID-2017 EXPLORATION BUDGET:
$8.8 million
EAU CLAIRE DRILLING
5 drill rigs
ü expand understanding of the mineralizing controls ü confirm current geological interpretation; test limits of the mineralized envelope ü improve drill spacing (~ 25 m) to show continuity between veins and increase overall confidence in the deposit
2015 Definition drilling intersected multiple high-grade gold intervals laterally and down- plunge of the current Measured & Indicated resource. The deposit is open laterally to the east and down plunge to the southeast and
2015 mineral resource, “Technical Report for the Eau Claire Gold Deposit, Clearwater Project, Quebec”. LONGITUDINAL VIEW (Facing North)
CONCEPTUAL
300 m
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 12
+50% COMPLETE
POSITIVE EAU CLAIRE DRILLING RESULTS
DRILLING IS CONFIRMING AND EXTENDING MINERALIZATION
DRILLING PROGRAM Reported Results: 19,542 m Total Completed: 34,542 m Total Planned : 55,700 m
M&I: 951,000 oz @ 4.1 g/t Au
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 13 ER16-662 ER16-621 ER16-606 ER16-584 ER16-608
CLEARWATER & LAC CLARKIE TARGETS
7,600 M - DRILL TESTING MULTIPLE TARGETS
2016 - 2017 EXPLORATION PROGRAM
ü District-scale greenstone belt ü Targeting drill-ready open pit potential w/in 15 km of the Eau Claire Deposit ü Potential for Eleonore-style and Eau Claire-style mineralization elsewhere on the property ü Lac Clarkie Phases 1 & 2: geophysics to identify priority drilling targets
Clearwater Property Exploration Drilling (m) Snake Lake (complete) 4,700 Clovis Lake 1,300 Knight 500 Natel 500 Serendipity 300 Beluga 300 Total Clearwater Property Exploration 7,600
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 14 5,790,000N 5,800,000N 480,000E 5,780,000N 460,000E 470,000E 5,790,000N 450,000E 5,800,000N 5,780,000N
V3B Mafic Volcanic Rock S Volcanoclastic Sediment S4 Polymictic Conglomerate V1 Felsic Volcanic Rock S9 Iron Formation Area Outline VQ, VTL, VQTL Quartz +/- Tourmaline Vein, QFP Quartz Feldspar Porphyry M8 Schist / Alteration Zone >50% I3B, I4B Diabase, Pyroxenite Hydrology (rivers and lakes) Claim BlockGeology
I2 Diorite I1D TonaliteOther Symbols
I
5 2.5
kmSNAKE LAKE DRILLING RESULTS
DRILLING IDENTIFIES TWO-STYLES OF GOLD MINERALIZATION NEAR EAU CLAIRE
DRILLING PROGRAM Reported Results: 3,785 m Total Completed: 4,512 m
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 15
ER16-592 ER16-596 ER16-615 ER16-626
EASTMAIN MINE PROJECT
GREAT LOCATION & INFRASTRUCTURE
Otish Park Eastmain Mine Camp looking NW along mine trend to surface targets Route 167 Road, part of Plan Nord Eastmain Mine
All-season road built in 2014 by Quebec gov’t and Stornoway
Stornoway Renard MIne EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 16
EASTMAIN MINE PROJECT
HISTORIC PRODUCTION, HISTORIC RESOURCE, INFRASTRUCTURE IN PLACE
Note 1. The Eastmain Mine (past-producing) Historical Resources is not NI 43-101
Qualified Person has not done sufficient work to classify them as mineral resources. The issuer is not treating these historical resources as current mineral resources and these resources should not be relied on.
HISTORIC MINING & RESOURCE Mined: 40,000 ozs at 10.58 g/t Au (1995) Resource1: 255,750 oz of 10 g/t Au in 878,000 tonnes $40M invested by previous owners
PROPERTY 8,014 hectares Permanent all-weather road,
60 person-camp incl. full-kitchen, core shack and cabins James Bay gold district greenstone belt (volcanics) 100% ownership UPCOMING CATALYSTS Exploration program results (1Q 2017) Full assessment of Eastmain past production, historic resources and targets (under review) Planning 2017 program
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 17
Road to Eastmain 60-man camp & infrastructure Onsite Crusher
2016 - EARLY 2017 EXPLORATION BUDGET
$1.5 million
PROGRAM COMPLETE EXPLORATION UPSIDE ü New targets identified, including Julien and Suzanna – follow up underway ü Known mineralization around the historic resource ü Minimal past follow-up on drilling
EASTMAIN MINE PROJECT EXPLORATION SUCCESS
REVITALIZATION AND EXPLORATION OPPORTUNITY 3 strong targets drilled w/in 3 km of the mine: Hillhouse, Suzanna, Julien
– Trenching on 4 targets warrants further drilling, new mineralized structures identified (161212 press release): – Channel J3-6: 45.1 g/t Au, 26.5 g/t Ag and 0.61% Cu over 2.0 m, including 85.5 g/t Au, 48.0 g/t Ag and 1.09% Cu over 1.0 – Channel J3-5: 4.81 g/t Au, 10.3 g/t Ag and 0.44% Cu over 6.5 m, including 13.5 g/t Au, 28.0 g/t Ag and 1.17% Cu over 2.0 – Channel J4-3: 5.04 g/t Au, 8.34 g/t Ag, 0.59% Cu over 2.5 m, including 10.7 g/t Au,13.9 g/t Ag, 1.26% Cu over 0.5 m
– Encouraging results, new Julien Discovery confirmed, results on next slide (170119 press release)
Follow-up IP survey and line cutting (in progress)
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 18
NEW DISCOVERY: JULIEN TARGET Gold, Silver, Copper
EXISTING RESOURCE AND INFRASTRUCTURE
JULIEN DISCOVERY: DRILLING CONFIRMS NEW ZONE
ENCOURAGING SHALLOW GOLD/SILVER/COPPER INTERCEPTS 2.75 KM NW FROM THE EASTMAIN MINE, 0.3 KM NE FROM THE MINE TREND LINE-CUTTING AND IP SURVEY UNDERWAY, MORE DRILLING TO FOLLOW
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 19
DISCOVERY
Julien Trenching Highlights: Channel J3-6: 45.1 g/t Au, 26.5 g/t Ag and 0.61% Cu over 2.0m, including 85.5 g/t Au, 48.0 g/t Ag and 1.09% Cu over 1.0 Channel J3-5: 4.81 g/t Au, 10.3 g/t Ag and 0.44% Cu over 6.5 m, including 13.5 g/t Au, 28.0 g/t Ag and 1.17% Cu over 2.0 Channel J4-3: 5.04 g/t Au, 8.34 g/t Ag, 0.59% Cu over 2.5 m, including 10.7 g/t Au,13.9 g/t Ag, 1.26% Cu over 0.5 m
J3-6 J4-3 J3-5
EM16-76 42.4 g/t Au, 30.2 g/t Ag and 0.53% Cu over 10.5 m
100 m
EM16-76 EM16-92 EM16-93 EM16-94 EM16-95 PLAN VIEW CROSS SECTION
ÉLÉONORE SOUTH JV PROPERTY
INDICATIVE GEOCHEMISTRY – CONTIGUOUS TO ELEONORE MINE
Property size: 147 sq km JOINT VENTURE PARTNERS:
GOLDCORP’S ELEONORE MINE:
($985/oz AISC) MONI PROSPECT:
mineralization
Extends from JT Prospect east to Cheechoo discovery, over Moni Prospect (July 2016) FD PROSPECT
Eleonore gold mine, 4.5 km north of JT Prospect (July 2016)
2016-1H2017 Drilling Program
$2 million - JV Budget $0.74 million (Eastmain portion)
Goldcorp’s Eleonore Property Eleonore South JV Property
FD Prospect EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 20
ÉLÉONORE SOUTH JV DRILLING
RESULTS SUPPORT STRONG GEOCHEMICAL SIGNATURE
2016 – early 2017 Drilling Program: Phase 1 - 2,500 m drilling (12 holes) COMPLETE Phase 2 - 2,500 m - to begin Late February/March ALL 10 DRILL HOLES IN THE PROSPECTIVE CORRIDOR ARE MINERALIZED PROSPECTIVE CORRIDOR
3 - 4 km long 0.5 km wide
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 21
THE WAY FORWARD
AGGRESSIVE EXPLORATION: 75,000 meters in 2016-early 2017
3Q16 4Q16 1Q17 2Q17 3Q17
Complete comprehensive drill campaign (63,000m) Updated mineral resource estimate Perform other technical optimization work Optimize and complete PEA and study work
CLEARWATER PROJECT EASTMAIN MINE PROJECT ÉLÉONORE SOUTH JV
Trenching Drilling (7,500m) Drilling (5,000m) Sampling
PRIORITIES (Calendar Year)
2017 Program 2017 Program 2017 Program
4Q17
TODAY
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 22
IP Survey Drilling Historic to NI43-101 mineral resource conversion
FOR MORE INFORMATION
Claude Lemasson P.Eng., MBA President & CEO
lemasson@eastmain.com
Alison Dwoskin CPIR Manager, Investor Relations
dwoskin@eastmain.com
Office: 647-347-3735
www.eastmain.com TSX:ER
EASTMAIN INVESTOR PRESENTATION ER:TSX www.Eastmain.com 23