afi infrastructure gap analysis
play

AFI Infrastructure GAP Analysis El CHARKAOUI Yassine Manager - PowerPoint PPT Presentation

AFI Infrastructure GAP Analysis El CHARKAOUI Yassine Manager Safety and Operations-ATM 15 March 2019 Content Aeronautical Mobile Communication AFI Air Navigation Deficiency Database AFI Incident Analysis Group (AIAG) Towards Single


  1. AFI Infrastructure GAP Analysis El CHARKAOUI Yassine Manager Safety and Operations-ATM 15 March 2019

  2. Content • Aeronautical Mobile Communication • AFI Air Navigation Deficiency Database • AFI Incident Analysis Group (AIAG)

  3. Towards Single AFI Sky Harmonized, Interoperable, Seamless ATM Safety & Efficiency Air Transport

  4. Aeronautical Mobile Communication APIRG/16: Decision 16/20 ‘that the ICAO Regional Offices (Dakar and Nairobi) coordinate the conduct of regional surveys on AMS/VHF coverage by States and Organizations in order to ascertain that VHF frequencies are free of harmful interference and to initiate remedial action with States concerned as necessary’ APIRG/16: Conclusion 16/21 ‘that States cooperate and provide their support to VHF coverage surveys to be carried out by IATA in the AFI Region, initially every 18 months’. 4

  5. AFI States Geographical Area (34 States) 5

  6. EU States Geographical Area (20 States) 6

  7. Area and coverage: The State and the FIR • Largest States not largest FIRs – Seychelles – Mauritius – South Africa – Angola – Senegal – Ghana • Regional Single Sky Building Blocks – ASECNA – EAC – Roberts FIR – SADC – COMESA 7

  8. AMC Survey Results-2010 IFBP 2010 Aeronautical Mobile Survey Report -2010 Survey 2-23 June 2010 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Nil or Poor Comms Comms Established Comms Excellent 8

  9. AMC Survey Results-2012 IFBP 2013 Aeronautical Mobile Survey Report -2012 '5-5 '2-4 0-1 D O R R B H E E N O J C Y J G W V I A B T D V W S N D U M R C A B I B R D B D L E K Z A K L N A R A B O U G R B K E N C C F I E G H L N N S A A A B B B D D D J K K L L L L M M N N T A L 9

  10. AMC Survey Results-2014 IFBP 2014 Aeronautical Mobile Survey Report -2014 Survey 15-28 June 2014 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Nil or Poor Comms Comms Established Comms Excellent 10

  11. AMC Survey Results-2016 IFBP 2016 Aeronautical Mobile Survey Report -2016 Success rate for VHF and HF as % of the calls 11

  12. AMC Survey Results-2018 Readability heat map Radio Contact heat map 12

  13. Mind-the-Gap!-Communications 1870s IFBP HF Coverage VHF Coverage ADS-C/CPDLC Is it still relevant? Future VSAT Networks Technology: and ATN Local Telecoms SWIM Infrastructure

  14. AFI Air Navigation Deficiency Database 14

  15. Mind-the-Gap!-ASBU Implementation PBN AIM Approach with Vertical Guidance LNAV/VNAV PBN Transition from Routes AIS SIDs/STARs CNS ATM METEOROLOGY SAR

  16. AIAG Report 2008-2018 High Level AIAG Causal Factors 140 120 100 80 60 40 20 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 ATM Operations, procedures and Airspace Communication, Navigation, Sueveilance Human Factors technology (proficiency, non-compliance, situational awarness etc) 16

  17. AIAG Report 2008-2018 Chart Title Controller Proficiency 60 Crew Noncompliance (error) Airspace Organization and ATC Procedures 50 Co-ordination between ATS Units Mobile Communications 40 30 20 10 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 17

  18. AIAG Report 2008-2018 18

  19. Mind-the-Gap!-INCIDENT ANALYSIS Reports Controller Airspace Proficiency Organization Aeronautical ATC Mobile Non-Compliance Communications Flight Crew ATC Non-Compliance Procedures Coordination HUMAN FACTORS between ATS Units

  20. Thank you El CHARKAOUI Yassine Email@iata.org www.iata.org

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend